805 3 Avenue
Manhattan, NY 10022BBL 1-01323-0047Map
Owner of record: 805 Third New York LLC
805 3 Avenue is an office building built in 1980 in Manhattan, 10022. The owner of record is 805 Third New York LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 256
- ECB violations
- 60
- HPD complaints
- 11
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 256
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 25, 2020
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active
ECB violations · 60
- Class - 2
Class 2 rts:: failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service and contact the dob elevator division at elevatorir@bui
Jul 11, 2025 · Penalty $625
Active - Class - 2
A.c.27-929.1, failure to complete the installation of a full system ofautomatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more i
Jun 17, 2024 · Penalty $10,000
Active - Class - 2
A.c.27-929.1,failure to complete installation of full system of automatic sprinklers & file final sprinkler report prepared by registered design professional in office building 100 feet or more in height in exi
Jun 17, 2024 · Penalty $10,000
Active - Class - 2
At time of inspection on 8/21/23 at 645-7 pm the pops site is closed and unavailable to the public as required by dcp report., comply with zr
Aug 21, 2023 · Penalty $5,000
Resolve - Class - 3
Failure to maintain building in a code-compliant manner. at the time of inspection, i observed 2 of the 6 doors (not including revolving doors) are not working properly due to defective hardware and are closed.
May 15, 2023 · Penalty $500
Active - Class - 2
27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more in he
Feb 28, 2023 · Penalty $6,250
Active - Class - 2
Ac 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100ft or more in h
Feb 28, 2023 · Penalty $10,000
Active - Class - 2
27-929.1 failure to complete installation of full system of automatic sprinklers and file final sprinkler report prepared by registered design professional in office building 100 feet or more in height in exist
Nov 1, 2021 · Penalty $3,125
Active - Class - 2
Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in heig
Mar 30, 2021 · Penalty $3,125
Active - Class - 2
27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100ft or more in heigh
Mar 30, 2021 · Penalty $10,000
Active
Show 40 more ↓
- Class - 1
97x17: 97-x-17 this elevator is out of service repair device and restore to service immediately and contact nycdob by 212 393 2435
Nov 4, 2020 · Penalty $1,250
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of k3 2014 nycbc. this is a controller feature which ensures passengers safety. remedy; file application, install dlm and perform and
Aug 26, 2020 · Penalty $1,250
Resolve - Class - 1
Bc 3307.3.1 failure to provide sidewalk shed where required.at time of inspection i observed no sws over a japanese resturant and about 20feet from the restaurant as well.sidewalk sheds shall be provided as req
May 29, 2020 · Penalty $10,000
Resolve - Class - 2
27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee
Mar 30, 2020 · Penalty $10,000
Active - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control#804599. remedy: submit acceptable required technica
Feb 13, 2020 · Penalty $1,250
Active - Class - 2
Pedestrian protection does not meet code specification #bc 3307.6.5.3.failure to maintain sidewalk shed. note:at the time of inspection observed a heavy duty sws at exposure 1 and 4. pedestrians walking under t
Nov 19, 2019
Resolve - Class - 2
Ac279291-failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july,1,2019,in an office building 100 fee
Nov 15, 2019 · Penalty $6,250
Active - Class - 2
Ac279291-failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee
Nov 15, 2019 · Penalty $1,250
Active - Class - 1
97/x/17 restore to service for proper inspection by dob.
Nov 14, 2019 · Penalty $1,250
Resolve - Class - 2
Sidewalk shed parapet panel.noted:@time of insp,observed sidewalk shederected @exp one & two.i also observed that there were no parapet panel information posted on the sidewalk shed parapet as required.required
Apr 9, 2019 · Penalty $625
Resolve - Class - 2
Temporary construction equipment on site. expired permit. note at timeof inspection i observed sidewalk shed on site w/o an active permit onfile. permit for sidewalk shed on site w/o an active permit.rmdy:renew
Jan 17, 2019
Resolve - Class - 2
Bc3307.6.4.9/failure to install sidewalk shed so not to obstruct access to bus stop.noted:at bus stops located on 50th street and 3rd ave,sidewalk shed crossbars obstructing clear passage and access to bus stop
Aug 29, 2018 · Penalty $1,250
Active - Class - 2
Temporary construction equipment on site-expired permit.noted;sidwalk shed running along 3rd ave and 5th street continues to stand erected under expired permit#140594435-01eqsh.permit expired 1/18/18.rem:renew
Aug 29, 2018 · Penalty $1,250
Resolve - Class - 2
3307.6.4.9 sidewalk shed not to code specification. note: at time of inspection, i observed sidewalk shed on site. cross braces from sidewalk shed interfere with access to bus stop. persons can not reasonably e
Aug 10, 2018 · Penalty $1,250
Active - Class - 2
Pedestrian protection does not meet code specification. note: at time of inspection, i observed sidewalk shed on site without extensions over adjoining property. sidewalk shed shall extend past property lines
Aug 10, 2018
Resolve - Class - 2
Temporary construction equipment on site: expired permit. note: at time of inspection, i observed sidewalk shed on site without an active permit on file. permit for sidewalk shed on site without an active permi
Aug 10, 2018 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specification. note: at time of inspection, i observed sidewalk shed on site with the following objections: -damaged mudsills. -exposed bolts. -inoperable light bulbs. -
Aug 10, 2018 · Penalty $2,400
Active - Class - 1
Unlawful acts. failure to comply with an order the commissioner. in april 10, 2012, electrical violation was issued to the respondent. the respondent failed to comply with administrative code #28-201.1 (ecb) #m
Jun 25, 2018 · Penalty $6,250
Resolve - Class - 1
Unlawful acts.failure to comply with an order of the commissioner.in august 9 2017 -january 12 2018 two violations was issue to the respondent.the respondent failed to comply with (nyc electrical code #110.2(a)
Apr 10, 2018 · Penalty $2,500
Resolve - Class - 2
Violation of discretionary zoning conditions on privately owned public space.noted:at time of inspecton public plaza missing reqd amenities;restrooms 2 on concourse level,2restrms provided & locked(no access),p
Jan 26, 2018 · Penalty $4,000
Active - Class - 1
Unlawful acts.failure to comply with an order of the commissioner.in august 09 2017,october 02 2017.two violations was issue to the respondent.the respondent failed to comply with (nyc)#28.201.1,110.2(a),(ecb's
Jan 12, 2018 · Penalty $2,400
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. in 8-9-17 a electrical violation was issue to the respondent. the respodent failed to comply w/nyc electrical code#110.2(a)(ecb)#35227570x.
Oct 2, 2017
Resolve - Class - 1
Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.15fl electrical closet:defective open temporary wiring in use throughout the ceiling,defective,
Aug 9, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35219137p issued on 12/24/16 and to file a certificate of correction pursuant to 28-201.1 and 14cny 102-01. rmdy: comply w/commissioner's
Feb 8, 2017 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg walls appurtenances.noted:at time inspection(a)at expo 1(3ave)(i)defective/seperated metal molding at top of 29/f window at middle section(ii)dislodged vertical molding/mullion at a/f
Dec 27, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances.noted:2nd flr section of curtain wall glass approx 6'x10' has fallen to ground.said section of class is part of a restaurant d.b.a "gyu-kaka". additional inspec
Dec 24, 2016 · Penalty $5,000
Resolve - Class - 1
Electrical work w/out a permit.the entire motor rms 4 & 5 floor:branchcircuit wiring,control wiring, 16th motors,controller.rem:obtain permit."not on file" observe @3:30pm weg nemo premium.model #100180t3e404ts
Oct 8, 2015 · Penalty $400
Active - Class - 1
Approved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.motor rms 4 & 5 floors:motors model #100180t3e404ts made in brazil,277,480 volts (their) one not approved
Oct 8, 2015 · Penalty $300
Active - Class - 2
Failure to maintain building walls and appurtenances. noted at exp4 (3rd avenue) spalled bricks were found at various flrs such as by 10f window a tnorth section and between 19f and 18f at south section etc.
Sep 18, 2015
Resolve - Class - 2
52k11,59e01. 52k- replace rusted and undersized hoist ropes. 59e- adjust, clean and lubricate broke plunger.
Dec 4, 2012 · Penalty $250
Resolve - Class - 2
W/o a permit.const/electrical/plumbing.work noted:men working on 30th fl installing metal studs sheetrock.no permit on file for this work&nodrawing.demo on fl is done.men were setting up layout on fl studying,r
Aug 24, 2011 · Penalty $800
Resolve - Class - 3
99b07,11m07,58h10. 99b07-perform annual test. 11m07-provide city id number 1p32040 on car station panel. 58h10- defective machine bearing repair.
Jul 11, 2011 · Penalty $200
Resolve - Class - 3
99bb07 60q03. 99bb07-perform 1 year test. 60q03-guard motor room lighting.
Apr 25, 2011 · Penalty $200
Resolve - Class - 2
12-x-10/12-q-03/12-repair all car lighting and guard
Feb 24, 2011
Resolve - Class - 3
60b07,60q03,12d06,12q03,34b07.(60b07)provide proper lighting in motor room by controller.(60q03)properly guard lighting in motor room.(12d6)properly secure lighting in elevator.(12q03)properly guard lighting in
Feb 2, 2011
Resolve - Class - 3
Work w/o a permit: illegal work noted: at 3rd flr roof of 2 sty rear bldg. hot water heater exhaust breeched exhaust pipe not to nyc code fastened to bldg inadequately. heater & pipe originate from eating and
Jul 27, 2010 · Penalty $200
Resolve - Non-hazardous
83x10. 83-return elevator to service.
Apr 26, 2007 · Penalty $180
Resolve - Non-hazardous
83x10. 83- return elevator to service.
Apr 26, 2007 · Penalty $180
Resolve - Non-hazardous
83x10. 83- return elevator to service.
Apr 26, 2007 · Penalty $350
Resolve - Non-hazardous
Cease use:80i11/cease use:84b9/.cease use items-80-severly damaged stop treads on 2 dozen steps-replace.84-scaffold over unit top has reduced overhead clearance to less than 7ft.remove scaffold to operate unit.
Mar 13, 2007 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 10, 2017 · Apt 14J
Close
Show 1 more ↓
- Heat/hot water
Entire building
Mar 10, 2017 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1980
- Floors
- 29
- Residential units
- —
- Building area
- 597,553 ft²
- Lot area
- 24,975 ft²
- Zoning
- C6-6
- Community board
- 106
- Council district
- 4
- Block / lot
- 1323 / 47
- Assessed value
- $71,908,200
- Landmark / historic district
- No
Questions about 805 3 Avenue
Who owns 805 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 805 Third New York LLC.
Does 805 3 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 805 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 805 3 Avenue built?
City records list 1980 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.