111 East 58 Street
Manhattan, NY 10022BBL 1-01313-0005Map
Owner of record: Rebco Associates
111 East 58 Street is an office building built in 1969 in Manhattan, 10022. The owner of record is Rebco Associates. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 116
- ECB violations
- 41
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 116
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9c unsafe report filed
May 10, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed
Show 40 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 5, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2013
Dob violation - resolved - Facade facade optional
Cycle 7 unsafe report filed
Feb 21, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 11, 2011
Dob violation - resolved
ECB violations · 41
- Class - 2
A.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office building 100' or
Jul 13, 2020 · Penalty $1,560
Resolve - Class - 2
A.c. 27-929.1 failure to complete the installation of a full system of automatic sprinkler an dfile sprinkler report preopared by a registered design professional by july 1, 2019 in an office building 100 feet
Nov 15, 2019 · Penalty $1,250
Resolve - Class - 2
37-625/violation of conditions on as of right privatley owned public space.masonry planters with landscaping placed at entrance to arcade also(4)benches(4)cafe tables and 15 cafe choirs as per pops#m050006 reco
Jun 21, 2019 · Penalty $5,000
Resolve - Class - 2
Sec. 3319-01(g)(7)(i) michael lombardo pe#090287 failed to submit required cd8 signoff in a timely manner allowing crane to operate w/o a certificate of onsite inspection. above cd8 cn#833-18 was signed off on
Nov 10, 2018
Resolve - Class - 2
Respondent failed to make the proper notification for mobile crane after may 1,2018 to the department.at time of inspection it was discovered that no mobile crane(cn#77018) was on site.notification was made of
Sep 24, 2018
Resolve - Class - 1
Work w/o permit. at time of inspection no on on jobsite could produce an variance for crane work or equipment hoisting.rmdy: stop all operations/call comes derrichs for re-inspection.
Jan 19, 2013 · Penalty $800
Resolve - Class - 2
Failure to file an architect / engineer report certifying exit / directional signal signs are connected to emergency power source / storage battery equipment. remedy: file architect / engineer report.
Jan 27, 2010
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/inst of c-hooks in connection w/suspended scaffold. noted: no notification for c-hooks installed at exp #3. remedy: notify the dept.
Nov 30, 2009 · Penalty $400
Resolve - Class - 2
Altered bldg occupied w/o a valid cofo/illegal occupancy noted:bldg altered under appl#10400868/alt-1 found to be occupied w/o the above appl being signed off!rem:obtain a valid cofo &/or discontinue illegal us
Nov 20, 2009
Resolve - Class - 2
Fail to maintain bldg in case compliant manner defects noted:cracks @ cinder block walls various llocations w/opening improperly sealed cracked foundation wall @ east sc adj to ramp driveway exit dr, n/w sectio
Nov 20, 2009
Resolve
Show 31 more ↓
- Class - 1
Fail to maintain bldg in code compliant manner no fire stopping for bc712.3 defects noted:@ garages levels various locations found w/openings @ walls corridor used in construction w/firestairs & firesatirs w/op
Nov 20, 2009 · Penalty $1,000
Resolve - Class - 2
Work w/o a permit illegal wrk noted:@ garage levels various locations found w/ac-sleeves created a cinder block wall(s) w/the installation of ac units/etal.rem:obtain the required permit & from the nyc dob if
Nov 20, 2009
Resolve - Class - 1
Fail to provide unobstructed exit passageway defects noted @ central parking system garages cellar level southwest section, found w/the parking of cars infront of exit dr & s/e exit corridor leading to fire
Nov 20, 2009 · Penalty $1,200
Resolve - Class - 2
Occupancy contrary to that allowed by c of o.occupancy on dept doors illegal occupancy.noted:bldg found to be occupied as garage for centralparking syste inc.at cellar sub-cellar etal contrary to temp cofo#6732
Nov 20, 2009
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: shed at exp #'s 1,3 under pmt #120048723. there are no plans available for review as per site engineer. remedy: provide plans
Aug 8, 2009
Resolve - Class - 2
98bb05.44h08.52bb12.52b14. 98bb05 5 yr test tag exp. 44h08 regroove or replace traction sheave 52bb12 reshackle exp. 52b14 shorten hoist ropes
Oct 7, 2008 · Penalty $500
Resolve - Class - 2
98bb05.44h08.52bb12.52b14.98bb05.5yr test tag exp. 44h08 regroove or replace traction sheave 52bb12 reshackle expired 52b14 shorten hoist rope
Oct 7, 2008 · Penalty $500
Resolve - Non-hazardous
Failure to maintain. bldg defects noted: missing concrete ceiling leaving exposed debris rebars located on the cellar level. (apprx 10sq ft of concrete is missing) remedy: replace missing concrete ceiling.
Oct 4, 2007 · Penalty $2,500
Resolve - Non-hazardous
48b15. shorten hoist ropes.
Dec 18, 2002
Resolve - Non-hazardous
46k12. 46-k replace rusted by underside hoist cables.
Jun 11, 2002
Resolve - Non-hazardous
73x11 (73)restore elevator to normal service for proper d.o.b. inspection.
Jul 17, 2000
Resolve - Non-hazardous
07x11 74o02 75u16 74d06 #02x11 alarm is not audible repair alarm #74002 secondary is dirty-clean secondary #75u16 5yr test tag shows outdated property tag device.#74d06 maintenance butter ladder-properly secure
Jul 14, 2000
Resolve - Non-hazardous
Demo work w/o a variance issued by this dept at upper floors. failure to carry out permited work in accordance w/applical laws. remedy: stopall work-obtain a variance from this dept to work after hours-mon-fri-
May 27, 1998
Resolve - Non-hazardous
Failure to provide an alphabetic letter of identification for elevators 1) landing "z" and "y" at floors 37,33,31,30,26,25,22,21,20. 2) landing "x" and "w" at floors 7 to 10 within the buildings. remedy: instal
Sep 9, 1997
Resolve - Non-hazardous
37b9. remove clip jumper from controller. permanently aix wire.
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
73x11, 30s11. return to service for complete inspection. 30- repair hoistway wall to comply with city code.
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
74x11 74- repair intercom
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
73x11. return to service for complete inspection.
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
8v1, 30s11. adjust floor stops. 30) repair hoistway wall to com¢ly with city code.
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
37b9. remove clip jumper from selector permit. fix wire
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
37b9. remove clip jumper from controller permanently and fix wires
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
8v1 280 adjust floor stops
Mar 5, 1997 · Penalty $100
Resolve - Non-hazardous
Failure to obtain equipment use permit for a/c unit mounted on roof for 33 floor jack resnick & sons remedy obtian equipment use permit from dob or remove units
Feb 14, 1997 · Penalty $1,000
Resolve - Non-hazardous
778 failure to obtain equipemnt use permit for a/c unit on roof remedyobtain equipment use permit from dept of buildings or remove unit
Feb 6, 1997
Resolve - Non-hazardous
778 failure to obtian equipment use permit for a/c unit on roof remedy obtain equipment use permit from dept of buildings or remove unit
Feb 6, 1997 · Penalty $175
Resolve - Non-hazardous
Failuer to obtain equipment use permit for unit or roof remedy obtain equipment use permit from dept of building or remove unit
Jan 31, 1997 · Penalty $1,000
Resolve - Hazardous
Work does not conform to approved plans and permit permit no 101 25 b577. work being done at the time of in spection cutting holes in concvete floors 11th and 12th buning stmuetural steel memeber and erection
Apr 18, 1996 · Penalty $500
Resolve - Non-hazardous
Failure to carry art permited work in accordance with appeicable laws and regulation, in that constvention actwrities an being performed other than weekdays between the hours of 7 am and 6 pm with out a varianc
Apr 18, 1996 · Penalty $500
Resolve - Unknown
Failure to provide adequate elevator bank identification 3 letters for passenger bank and fright bank on various floors 32,29,24,18.remedy signage as per local law 16/84.
Jan 26, 1996
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of provired fire protection systems remedy fire report.
Jan 26, 1996
Resolve - Non-hazardous
Locking devices installed on doors off the elevator lobby at 24th and 21st floors obstructing egress to fire exit stairs from elevator lobby. remove all locking devices immeditely.
Mar 20, 1991
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1969
- Floors
- 36
- Residential units
- —
- Building area
- 596,734 ft²
- Lot area
- 26,750 ft²
- Zoning
- C5-2.5
- Community board
- 105
- Council district
- 4
- Block / lot
- 1313 / 5
- Assessed value
- $90,945,450
- Landmark / historic district
- No
Questions about 111 East 58 Street
Who owns 111 East 58 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rebco Associates.
Does 111 East 58 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 111 East 58 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 111 East 58 Street built?
City records list 1969 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.