148 East 46 Street
Manhattan, NY 10017BBL 1-01300-0146Map
Owner of record: Knightsbridge, LLC
148 East 46 Street is a mixed residential and retail building built in 1925 in Manhattan, 10017. It has 4 residential units across 5 floors. The owner of record is Knightsbridge, LLC. HPD has recorded 61 housing violations here, most recently on April 29, 2026. 26 of the 50 most recent violations are still open.
- HPD violations
- 61
- DOB violations
- 19
- ECB violations
- 4
- HPD complaints
- 85
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 61
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at building front areaway
Oct 1, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the loose garbage at building front areaway
Oct 1, 2025
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at all yards
Aug 22, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 15, 2025
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jul 9, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jul 9, 2025 · Apt 3
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
May 4, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 3
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 4th story, 1st apartment from north at east
Apr 6, 2025 · Apt 5
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 5, 4th story, 1st apartment from north at east
Apr 6, 2025 · Apt 5
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 5, 4th story, 1st apartment from north at east
Apr 6, 2025 · Apt 5
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5, 4th story, 1st apartment from north at east
Apr 6, 2025 · Apt 5
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of metal strip attached to 2nd concrete tread from bottom at stairs from street to front entrance of building
May 29, 2019
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water over flowing out from site glass from boiler at boiler room
Oct 25, 2018
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Oct 25, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 25, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Oct 25, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 25, 2018
Closed — Violation closed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system. at public hall, 4th story
Oct 25, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 6, 5th story, 2nd apartment from east at south
Mar 28, 2018 · Apt 6
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2017
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 6, 4th story, 2nd apartment from north at east
Dec 28, 2016 · Apt 6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 6, 4th story, 2nd apartment from north at east
Dec 28, 2016 · Apt 6
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 3rd room from north located at apt 6, 4th story, 2nd apartment from north at east
Dec 2, 2016 · Apt 6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 6, 4th story, 2nd apartment from north at east
Dec 2, 2016 · Apt 6
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical ventilation in the kitchen located at apt 6, 4th story, 2nd apartment from north at east
Dec 2, 2016 · Apt 6
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 6, 6th story, 2nd apartment from north at east
Nov 28, 2016 · Apt 6
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at public hall at basement
Nov 28, 2016
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
May 21, 1991
Vp-violation unserved ecb-active - Electric signs none
Es-electric signs none
Jan 2, 1991
Dob violation - active - Construction other optional
C-construction other optional
Jun 21, 1989
Dob violation - active - Construction other optional
C-construction other optional
May 22, 1989
Dob violation - active
ECB violations · 4
- Class - 3
Work w/o permit.observed in rear of bldg on 4th fl level.apt#4 on existing steel balcony,an enclosure built out of flammable material,wood and carpeted green fiber extending from base of balcony to almost the b
Sep 20, 2017 · Penalty $500
Active - Non-hazardous
Work without a permit: observed: illuminated sign "soup nutsy" approx 5 feet long x 2 feet wide installed above 3rd floor window, north westside of building. remedy: obtain approval and permit for illuminated s
Aug 7, 1997 · Penalty $500
Active - Non-hazardous
32a,32b,32a low water cut-off not working properly 32b dirty boiler room, cramped with debris
May 21, 1991 · Penalty $85
Resolve - Non-hazardous
Operation of a place of assembly restaurant at basement and first fl without first obtaining a place of assembly permit. remedy: discon- tinue unlawful use. obtain place of assembly permit.
Jan 25, 1990 · Penalty $50
Resolve
Complaints
- Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 6, 2025 · Apt 3
Close - Flooring/stairs
Floor
Sep 6, 2025 · Apt 3
Close - Flooring/stairs
Floor
Sep 6, 2025 · Apt 3
Close - General
Bell/buzzer/intercom
Sep 6, 2025 · Apt 3
Close - Heat/hot water
Entire building
Sep 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jul 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 3, 2025 · Apt 3
Close - Heat/hot water
Entire building
Jun 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt 3
Close - General
Cooking gas
Mar 12, 2020 · Apt 6
Close - Water leak
Damp spot
Apr 29, 2018 · Apt 6
Close - Water leak
Damp spot
Apr 28, 2018 · Apt 6
Close - Water leak
Slow leak
Apr 27, 2018 · Apt 6
Close - Water leak
Damp spot
Apr 26, 2018 · Apt 6
Close - Water leak
Slow leak
Apr 25, 2018 · Apt 6
Close - Water leak
Slow leak
Apr 17, 2018 · Apt 6
Close - Water leak
Heavy flow
Apr 16, 2018 · Apt 6
Close - Water leak
Slow leak
Mar 19, 2018 · Apt 6
Close - Heat/hot water
Entire building
Dec 27, 2017 · Apt ENT
Close - Heat/hot water
Entire building
Dec 27, 2016 · Apt 6
Close - Heat/hot water
Entire building
Dec 5, 2016 · Apt 6
Close - Water leak
Slow leak
Dec 1, 2016 · Apt 6
Close - Heat/hot water
Entire building
Dec 1, 2016 · Apt 6
Close - Heat/hot water
Entire building
Dec 1, 2016 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1925
- Floors
- 5
- Residential units
- 4
- Building area
- 4,882 ft²
- Lot area
- 1,506 ft²
- Zoning
- C5-2.5
- Community board
- 106
- Council district
- 4
- Block / lot
- 1300 / 146
- Assessed value
- $1,830,600
- Landmark / historic district
- No
HPD registration #131958, last renewed Feb 9, 2026.
Questions about 148 East 46 Street
Who owns 148 East 46 Street?
The owner of record in NYC Department of City Planning PLUTO data is Knightsbridge, LLC.
Does 148 East 46 Street have violations?
Yes. NYC HPD has recorded 61 housing violations at this property.
Is 148 East 46 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 148 East 46 Street built?
City records list 1925 as the year it was built.
How many apartments are in 148 East 46 Street?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.