1250 Avenue Of The Americas
Manhattan, NY 10112BBL 1-01265-7501Map
Owner of record: Rockefeller Center Properties (Rcp)
1250 Avenue Of The Americas is a condominium built in 1937 in Manhattan, 10112. The owner of record is Rockefeller Center Properties (Rcp). HPD has recorded 2 housing violations here, most recently on December 20, 2019. 2 of the 2 most recent violations are still open.
- HPD violations
- 2
- DOB violations
- 612
- ECB violations
- 64
- HPD complaints
- 8
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at 1st basement from north
Dec 20, 2019
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at 1st basement from north
Dec 20, 2019
Open — Nov sent out
DOB building violations · 612
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2023
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 30, 2020
Dob violation - resolved
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
Vio issued to elevator-fail to correct defects on 2017 cat 1 insp/tst
Sep 6, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active
ECB violations · 64
- Class - 2
Atoi, observed wooden structure at ground flr on corner of w 50th st & rockerfeller plaza built w/o permit submitted., obtain all permits; obtain permit for construction of structure.
Jun 3, 2026
Resolve - Class - 2
Atoi, observed electrical work done with out permits, observed at 10: 50am, 6 electrical boxes each with 4 outlets, 1 light switch and 1 overhead light, and power cables that run from the booth to 3 exterior ou
Jun 3, 2026
Resolve - Class - 2
Atoi, observed height of wooden structure is 72" should be 84" for code compliance to not pose a potential hazard., repair and/or replace; extend height of structure to make code compliant
Jun 3, 2026
Resolve - Class - 2
Class 2 item: category 1 test tag expired.
Jun 23, 2025
Resolve - Class - 2
Class 2 item: category 1 test tag expired
Jun 2, 2025
Resolve - Class - 2
At lower concourse at rear of building, observed water damage. ceilingwater stained,cracks and peeling of finish., repair and/or replace
Dec 23, 2024
Resolve - Class - 2
27-929.1;a.c.#27-929.1,failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 ft or more
Nov 1, 2021 · Penalty $1,250
Active - Class - 2
27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office 100ft or more in height in exis
Mar 30, 2021 · Penalty $3,125
Active - Class - 2
Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in heig
Sep 29, 2020 · Penalty $1,250
Active - Class - 1
Failure to provide unobstructed exit passageway. noted:in (store j crew) rear 1 & 2 fl egress obstructed w/box & door way not open to full extent at 1 fl & on 2nd fl rear door obstructed w/garbage & box.remedy
Jul 1, 2020 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 1
(cease use)89.i.1(c/u),89.h.11(c/u)=(89-i-11)(cease use)broken steps threads must repplace all steps with broken step threads (89-h-11)(cease use)raise shorp step threads replace all steps with razor thorp step
Mar 5, 2019 · Penalty $1,250
Resolve - Class - 1
Cu97x17; 99bb05; 97x17-device has been cease use pending an accident investigation by this department. please provide an escalator mechanicand tools to complete the inspecton and contact dob at eir@buildings.
Mar 4, 2019 · Penalty $6,250
Resolve - Class - 2
Failure to maintain building in code compliant manner. use prohibited door/hardware per bc 1008.1.8. noed in the commercial store at the entrance door at 49 street observed illegal locking devices/manual lock
Jan 12, 2019 · Penalty $312
Active - Class - 1
88x10,99b07,59b07,68m07,68m07-88)repair top left handrail inlet switch is a safety device to ensure passenger's safety repair switch and contact nycdob at [email protected] to restore service. 99)one year t
Dec 14, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved accept plans at tpa site. at the time of my inspection temporary place of assembly was in progress. during my inspection i requested approved plans none was provided. stop all tpa ac
Jun 28, 2018 · Penalty $500
Active - Class - 1
Sec: 1rcny 104-09(b). fitness requirement for renewal & reinstatement,christopher cosban (#9215) failed to maintain fitness requirement for continued operation of his license. @ time of insp hoist machine opera
Nov 14, 2017
Resolve - Class - 2
Failure to file a final inspection for completed within 1 year of permit expiration.alt ii pc job#120169655 which entails sprinkler work @ concourse level is complete & substantially compliant to plan,however p
Sep 29, 2017 · Penalty $2,000
Resolve - Class - 1
Failure to provide sidewalk shed where required at time of insp facadework in north face @ 1250 6th avenue w/pipe scaffold erected & facad e shed removed onto roof (partially) at height approx 18 stories w/no
Jun 30, 2014 · Penalty $4,800
Resolve - Class - 2
Elect work w/o a permit.from the bsmt to 7 fl:run 8 set of 4"pipe & greenfield 3/4"&4"!!!"nbc".rem:obtain permit.
Jun 2, 2014 · Penalty $830
Resolve - Class - 2
98bb05,100l10. 98-5year tag expired; 100-change in travel 8.7.2.17(c)(u)
Nov 16, 2013 · Penalty $250
Resolve - Class - 2
52b07-provide cable shortning on device 1p19660#3 caiz,to provide proper counterweight runby.shorten cables on car due to defective rosets and shackels.
Oct 2, 2013 · Penalty $250
Resolve - Class - 1
86l11-replace a complete set of comb plates for top and bottom of de- vice #222.
Apr 27, 2013 · Penalty $1,000
Resolve - Class - 1
11l9- defective attendant switch removed from elevator device 1p19701 w/o dept approval as per code requirement 3010.1, because elevator switch was involved in accident w/electrical (shock) to bldg personnel.
Apr 9, 2013 · Penalty $1,000
Resolve - Class - 1
68m07,89i11,#x10,#j01,#i10,60q03. 89i- replace all steps w/razor sharptreads and chipped treads. #x- reversal switch. #j- gap between panels. #i- left side skirt bored. call 212-566-5542 before returning to
Sep 20, 2011 · Penalty $1,000
Resolve - Class - 2
52b07,54b07,70b09.(52)provide proper distance between cable clips according to code.8x rope diameter.2.20.9.4 (54)provide wedge clamp shackles on counter weight.(70)maintain clear path in front of pit door.
May 4, 2011 · Penalty $500
Resolve - Class - 2
61b11. 61b- properly relocate & install mainline switch for wheel chair lift
May 27, 2010 · Penalty $500
Resolve - Class - 3
40a10.40a10 repair hole motor rm fl
Mar 23, 2010
Resolve - Class - 3
10m7 100m7 brail on all fls served
May 28, 2009
Resolve - Class - 3
100m7.100m7 brail on all fls served
May 28, 2009
Resolve - Class - 2
56y10.61m07.68m07.69m07.100m07.100m07 56y repair oil leak 61m provide co. emergency phone # on main line 100m provide missing light in car 100m cover hole in cab roof
Oct 14, 2008 · Penalty $2,500
Resolve - Class - 1
97## 97## failure to report an accident that accured on july 10 2008 rule 27-1006 of the administration code
Sep 2, 2008 · Penalty $1,000
Resolve - Non-hazardous
65b01,66b07.65b01-relocate pit stop switch.66b07-provide a safe & secure access to pit area.
Dec 19, 2007
Resolve - Non-hazardous
84l10. #84-l-10 emergency phone does not respond correctly.
Sep 28, 2006 · Penalty $350
Resolve - Non-hazardous
64l10
Jul 18, 2006
Resolve - Non-hazardous
79h11/77m07/83o02/84i11. 79h-right side. 77m-bottom & top landing plates 83o-perform a full clean down inside entire equipment. 84i-both sides of bottom decking.
Mar 30, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to provide required means of egress for every floor. noted: atservice elevator bank from 63 fl down to 1st fl the exit doors leadingto the corridors with the stairwells and locked requiring a specific
Sep 10, 2005
Resolve - Hazardous
Cease use. hazardous. 55h11/63u15/cu-76x10/76m07/cu-79i11/79h11/81h11/83o02. 55h-sprocket,shaft and drive chains. 76x-bottom left. 76m-top left out right as per asme 17.1 rs 18.1 1996/07/98. 79h-left side 81h-s
Sep 7, 2005 · Penalty $500
Resolve - Non-hazardous
59q3/55o2/41o2/66o2/71q3/67o2/68o2/64m7/51o2/52o2/38o2/83l10 59)motor room lights unguarded 55)clean main machine 41)clean controller 66)clean pit 71)under car lights unguarded 67)clean rails 68)clean out rail
Jan 7, 2005
Resolve - Non-hazardous
51m11/ - 51-missing cable.
Jan 3, 2005
Resolve - Hazardous
16## 16 hoistway door can be open plat form not at landing cease use door lock as per ada code and sign off ea 1622/99 call 212 566 5539 before returning to service.
Feb 15, 2004 · Penalty $2,500
Resolve - Non-hazardous
73i12/80d06/74p17. 73i damage comb platis top and bottom. 80d secure bottom left molding. 74p call dob 212 566 5524 so proper inspe. can be made.
Nov 27, 2002 · Penalty $350
Resolve - Non-hazardous
79o02/ 80h10/ 80h worn floor plate top & bottom
Nov 26, 2002 · Penalty $350
Resolve - Non-hazardous
79o02/80h10/80h21. 80h worm floor plate bottom. 80h11 worm skirt left side.
Nov 26, 2002 · Penalty $350
Resolve - Non-hazardous
79o02
Nov 26, 2002 · Penalty $350
Resolve - Non-hazardous
73##,73u16.73-file all permits and necessary papers for removal of 1e224.73-properly tag device with correct city number.
Sep 28, 2000
Resolve - Non-hazardous
11q03,74d06,30i11,74x11.11q-install light guard.74d-properly secure or concouse level pule door releaze box.30d-patch up large hole in shaftway wall.74x-fire service inoperative repair under ea54/92
Aug 4, 2000
Resolve - Non-hazardous
12l,12m,39h. reapir emergency lights, replace broken emergency lens, traction on sheave is worn. regroove sheave.
Oct 13, 1999 · Penalty $350
Resolve - Non-hazardous
50o2,35b2,35b7. -50 clean hoist motor brush rigging, -35 provide ade- quate ventilation in machine room repair exhaust vent so that it does not come down on machines and equipment controllers.
Jun 28, 1999 · Penalty $180
Resolve - Non-hazardous
50o2,35b2,35b7. -50 clean hoist motor brush rigging, -35 provide ade- quate ventilation in machine room repair exhaust vents so that it doesnot come down on machines and equipment controllers.
Jun 28, 1999 · Penalty $180
Resolve - Non-hazardous
50o2,35b2,35b7. -50 clean hoist motor brush rigging, -35 provide ade- quate ventilation in machine room repair exhaust vents so that it doesnot come down on machines and equipment controllers.
Jun 28, 1999 · Penalty $180
Resolve
Complaints
- Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Oct 30, 2024 · Apt 60
Close - Water leak
Slow leak
Dec 13, 2019 · Apt 1271TU
Close - Heat/hot water
Entire building
Nov 26, 2019 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 21, 2018 · Apt ATT
Close - Unsanitary condition
Mold
Mar 21, 2018 · Apt ATT
Close - Heating
Heat related
Jan 26, 2004 · Apt 8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 1937
- Floors
- 70
- Residential units
- —
- Building area
- 2,122,138 ft²
- Lot area
- 107,766 ft²
- Zoning
- C5-2.5
- Community board
- 105
- Council district
- 4
- Block / lot
- 1265 / 7501
- Assessed value
- $624,207,159
- Landmark / historic district
- INDIVIDUAL AND INTERIOR LANDMARK
Questions about 1250 Avenue Of The Americas
Who owns 1250 Avenue Of The Americas?
The owner of record in NYC Department of City Planning PLUTO data is Rockefeller Center Properties (Rcp).
Does 1250 Avenue Of The Americas have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 1250 Avenue Of The Americas rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1250 Avenue Of The Americas built?
City records list 1937 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.