2541 Broadway
Manhattan, NY 10025BBL 1-01243-0010Map
Owner of record: 251 West 95th Street Owners Corp
2541 Broadway is an elevator apartment building built in 1925 in Manhattan, 10025. It has 18 residential units across 7 floors. The owner of record is 251 West 95th Street Owners Corp. HPD has recorded 60 housing violations here, most recently on February 15, 2022.
- HPD violations
- 60
- DOB violations
- 42
- ECB violations
- 24
- HPD complaints
- 74
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 60
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; one way screws and window stops missing at air conditioner units in the 1st room from east at north located at apt 2s, 2nd story, 1st apartment from east at south
Oct 11, 2013 · Apt 2S
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 4; wg to repair = 4; in the entire apartment located at apt 2s, 2nd story, 1st apartment from east at south
Oct 11, 2013 · Apt 2S
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective rubber gasket at door to the refrigerator in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls, and ceilings in the entire apartment located at apt 4n, 4th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective door bell in the entrance located at apt 4n, 4th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective door in the entrance located at apt 4n, 5th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures washbasin in the 2nd room from north at west located at apt 4n, 4th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures washbasin in the 2nd room from north at west located at apt 4n, 4th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective , in the entrance located at apt 4n, 5th story, apartment at east
Dec 7, 2009 · Apt 4N
Closed — Violation closed
Show 40 more ↓
- BHazardous
Replace with new the broken or defective gasket at door to refrigerator in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the 2nd room from north at east located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the 2nd room from north at east located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective locking assembly at entrance door to apt. located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective electrical door bell located at apt 4n, 4th story, 1st apartment from north at east
Sep 10, 2009 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures ,, in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Replace with new the broken or defective gasket at refrigerator door in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - ANon-hazardous
Replace with new the broken or defective knob at gas range in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective window lower sash in the 4th room from north located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures water closet compartment in the 3rd room from north at west located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective bell at door in the entrance located at apt 4n, 4th story, 1st apartment from north at east
Dec 18, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective door bell in the entrance located at apt 4n, 4th story, 1st apartment from north at east
Sep 29, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective handles to gas range in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Sep 29, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Replace with new the broken or defective door gasket in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Sep 29, 2008 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective door handle to refrigertaor in the kitchen located at apt 4n, 4th story, 1st apartment from north at east
Sep 29, 2008 · Apt 4N
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 4th room from east located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st door frame from east at south wall in the 1st private hallway from east located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door in the 1st private hallway from north located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchen located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the 5th bathroom from east located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 2nd private hallway from north at west located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 2nd room from east located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from west at north wall, 1st door frame from west at north wall, 1st door frame from north at east wall, 1st window frame from east at south wall in the 2nd room from east located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, 1st radiator from west at north wall, south wall, 1st window frame from north at east wall in the 1st room from east at center located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, west wall, 1st window frame from north at east wall in the 2nd bathroom from east at center located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall, 1st door from east at south wall, 1st door frame from east at south wall, north wall, 1st window frame from south at west wall in the 1st room from east at north located at apt 2s, 2nd story, 1st apartment from east at south
May 16, 2008 · Apt 2S
Closed — Violation closed - BHazardous
Properly repair the broken or defective refrigerator door in the kitchen located at apt 4n, 4th story, apartment at east
Aug 9, 2007 · Apt 4N
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 4n, 4th story, apartment at east
Aug 9, 2007 · Apt 4N
Closed — Violation closed - BHazardous
Properly repair the broken or defective wood floor in the 2nd room from east at center located at apt 4n, 4th story, apartment at east
Aug 9, 2007 · Apt 4N
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of expose nail at wood floor in the 1st room from east at north located at apt 4n, 4th story, apartment at east
Aug 9, 2007 · Apt 4N
Closed — Violation closed - ANon-hazardous
Provide adequate supply of cold water for the fixtures at washbasin in the bathroom located at apt 4n, 4th story, 1st apartment from north at east
Jun 4, 2007 · Apt 4N
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective w00d floor in the 3rd room from north at west located at apt 4n, 4th story, 1st apartment from north at east
Jun 4, 2007 · Apt 4N
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective mechanical stopper, washbasin in the 3rd room from north at west located at apt 4n, 4th story, 1st apartment from north at east
Jun 4, 2007 · Apt 4N
Closed — Violation closed - ANon-hazardous
Replace the broken or defective mechanical stopper, in wasbasin in the 1st room from north at west located at apt 4n, 4th story, 1st apartment from north at east
Jun 4, 2007 · Apt 4N
Closed — Violation closed - BHazardous
Repair the leaky and/or defective water supply pipe over head pipe, at watercloset compartment in the 3rd room from north at west located at apt 4n, 4th story, 1st apartment from north at east
Jun 4, 2007 · Apt 4N
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color cceiling, at watercloset in the 2nd room from east at south located at apt 5w, 5th story, 1st apartment from south at west
Aug 30, 2006 · Apt 5W
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective defective light fixture in the 1st room from east at south located at apt 4n, 4th story, 1st apartment from east at south
Sep 2, 2005 · Apt 4N
Closed — Violation closed
DOB building violations · 42
- High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 32 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued - failure to file 2017 internal high pressure boiler inspection
Mar 16, 2020
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2016 annual high pressure boiler inspection
Jun 22, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2017
Dob violation - resolved - High pressure boiler boiler required
Violation issued for failure to file 2014 annual high pressure boiler inspection
Dec 16, 2016
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2014 annual high pressure boiler inspection
Dec 16, 2016
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - High pressure boiler boiler required
Violation issued for failure to file 2013 annual high pressure boiler inspection
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 17, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 31, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2007
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 19, 2006
Vw-violation work without permit - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2006
Dob violation - resolved - Elevator elevatorrequired
1p9022
Jul 24, 2001
Dob violation - resolved - Elevator elevatorrequired
1p9022
May 31, 2000
Dob violation - resolved - Construction other optional
C-construction other optional
Dec 7, 1999
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 14, 1999
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 21, 1995
Vp*-violation unserved ecb- dismissed - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1992
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 13, 1992
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 13, 1992
Dob violation - dismissed - Electric signs none
Es-electric signs none
May 13, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 13, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 13, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 13, 1992
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Mar 13, 1992
Vp-violation unserved ecb-active - Elevator elevatorrequired
(17)vision guard
Jul 27, 1990
Dob violation - resolved
ECB violations · 24
- Class - 2
40i11,40m07,40b04. 40i-window (door frame) damaged; 40b-patch & repair(walls) mold; 40m-provide ventilation as per code.
Oct 16, 2015
Resolve - Class - 2
98/bb/05,56/y/13,56/y/10,52/o/02,68/m/07,59/y/02,98bb-perform & file current 5 yr test/56y-repair & seal glow packing
Mar 9, 2010 · Penalty $250
Resolve - Class - 3
24b.50a.50b.50c 50a valve handle on water gauge glass defective 50b boiler blow down line has small leak 50c water feed line to boiler has evidence of a leak
Mar 17, 2009
Resolve - Class - 2
Failure to maintain lighting under sidewalk shed. noted: shed at exp #1 under permit #110388508 has inoperable lights at 10:10pm. remedy: maintain shed lighting, make safe.
Feb 21, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of bldg rules & regula
Dec 12, 2008
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect is the north/east corner of cornice is defective metal is missing, wood underneath is rotted. remedy: provide overhead protection make safe immediately make al
Jun 10, 2008 · Penalty $2,500
Resolve - Non-hazardous
66o02,64x10,67o02,68o02,55y13,15m07,16h11,33o02,84l10.16h11-1fl door gibs.33o02-entire hoistway clean down including doors.84l10-position indicator in car.
Dec 14, 2007
Resolve - Non-hazardous
50a,b,51.50a-combustion spillage from upper hand hole area.50b-adjust oil burner & clean boiler evidence of carbonizing boiler.
Aug 22, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to provide elevator landing sign that shall read: <<in case offire use stairs unless otherwise instructed>> at the elevator bank on fl 2 to 7. remedy: install sign as per local law 16 198.
Apr 17, 2007 · Penalty $400
Resolve - Non-hazardous
License sign hanger failed to supervise sign hanging work: noted; on 10/24/06 metropolitan sign & rigging has installing a flex type ad signto the north side facade of 2541 broadway by bolting & tying into
Oct 24, 2006
Resolve
Show 14 more ↓
- Non-hazardous
Outdoor ad co. having installed a sign (framework, brackets, etc.) w/oa permit. remedy: remove illegal work.
Oct 24, 2006
Resolve - Non-hazardous
Failure to safeguard public & property affected by constr operations. noted:ongoing demo & constr wk @ 6fl under appl #104494110exp 4/28/07 causing horizontal cracks @ all 3 bedrm(rear) & closet of apt #5w.
Aug 19, 2006 · Penalty $1,000
Resolve - Non-hazardous
66o02/38o02/41m07/55o02/40t07/60t07. (66) clean pit. (38) car top-dirty. (41) city id number controller. (55) clean main machine - also city id # main machine. (40) motor room door unlabeled. (60) company name
Aug 5, 2005
Resolve - Non-hazardous
03x10 06d06 38o02 (03-x-10)repair cummunicating in elevator (06-d-06) properly secure glass in car door. (38-o-02) clean car top.
Aug 5, 2004 · Penalty $180
Resolve - Non-hazardous
32a, 34b. 1987 fulton n.bd 53435
Jun 2, 2004
Resolve - Non-hazardous
32a, 18b, 48b. 1987 fulton nail bd 53741
Jun 2, 2004
Resolve - Non-hazardous
83 83-operating elevator without an equipment use pemit "sign off certificate rem call 212 566 5524 to arrange for appiontment to finalize ebn 233-99
Apr 12, 2004
Resolve - Non-hazardous
B4a/40/48a,b.50a/16. 50a no secondary shut off valve on the water column drain line. 40 draftstat broken in flue pipe. (fulton vert the boiler, 15hp, nb53741;ok-fire 1987)
Feb 24, 2003 · Penalty $180
Resolve - Non-hazardous
B4a/50a/50b/16. 50a fixed fresh air ventialtion for enclosed boiler obstructed cardboard blocking airway to boiler room. 50b no secondary shut off valve on water column drain. (fulton vert test boiler 15hp; nb5
Feb 24, 2003 · Penalty $180
Resolve - Non-hazardous
5l11 8v1 9h12 16h12 17a12 3m7 39h11 50y14 5l11=door molding 16h12=1st fl 17a12=must be wire glass 3m7=capacity plate
Jun 13, 2001 · Penalty $350
Resolve - Non-hazardous
01r,10t,15l,18i,18q,21l,25i,28l,30i,36i,46l,47i,50y,50y,52l,55x,57o,60m,73o,22d,. 01r-for approved type switch (not taggle!) 10t-floor # 15l- adjust door closurs and repair same / lobby elemerged & bsmt 18i-rol
Jul 11, 1996
Resolve - Non-hazardous
17b,46a.3 hand holes leanking sight glass dirty.
Jan 25, 1993 · Penalty $100
Resolve - Non-hazardous
46a, water gage glass dirty steam and water nuts, corroded remove and replace.
Jan 25, 1993
Resolve - Non-hazardous
37g,22d,01#,. 01 broken toggle.
Aug 26, 1992 · Penalty $200
Resolve
Complaints
- Paint/plaster
Ceiling
Dec 4, 2009 · Apt 4N
Close - Paint/plaster
Wall
Dec 4, 2009 · Apt 4N
Close - Plumbing
Water supply
Dec 4, 2009 · Apt 4N
Close - Paint/plaster
Ceiling
Dec 4, 2009 · Apt 4N
Close - Plumbing
Water supply
Dec 4, 2009 · Apt 4N
Close - General
Doors
Dec 4, 2009 · Apt 4N
Close - Electric
Bell-buzzer/intercom
Dec 4, 2009 · Apt 4N
Close - Appliance
Electric/gas range
Dec 4, 2009 · Apt 4N
Close - Appliance
Refrigerator
Dec 4, 2009 · Apt 4N
Close - General
Floor
Nov 16, 2009 · Apt 4N
Close
Show 40 more ↓
- Paint/plaster
Wall
Nov 16, 2009 · Apt 4N
Close - General
Locks
Nov 16, 2009 · Apt 4N
Close - Electric
Bell-buzzer/intercom
Nov 16, 2009 · Apt 4N
Close - Appliance
Electric/gas range
Nov 16, 2009 · Apt 4N
Close - Plumbing
Shower-stall
Nov 16, 2009 · Apt 4N
Close - Plumbing
Water supply
Nov 16, 2009 · Apt 4N
Close - General
Windows
Aug 24, 2009 · Apt 4N
Close - Plumbing
Water supply
Aug 24, 2009 · Apt 4N
Close - Plumbing
Water supply
Aug 24, 2009 · Apt 4N
Close - Appliance
Electric/gas range
Aug 24, 2009 · Apt 4N
Close - Appliance
Refrigerator
Aug 24, 2009 · Apt 4N
Close - General
Windows
Nov 29, 2008 · Apt 4N
Close - Appliance
Electric/gas range
Nov 29, 2008 · Apt 4N
Close - Appliance
Refrigerator
Nov 29, 2008 · Apt 4N
Close - Heating
Heat related
Nov 29, 2008 · Apt 4N
Close - Plumbing
Toilet
Nov 29, 2008 · Apt 4N
Close - Heating
Heat related
Nov 29, 2008 · Apt 4N
Close - Heating
Heat related
Nov 24, 2008 · Apt 4N
Close - Electric
Bell-buzzer/intercom
Nov 24, 2008 · Apt 4N
Close - Appliance
Refrigerator
Nov 24, 2008 · Apt 4N
Close - Appliance
Electric/gas range
Nov 24, 2008 · Apt 4N
Close - Appliance
Electric/gas range
Nov 24, 2008 · Apt 4N
Close - Plumbing
Water supply
Nov 24, 2008 · Apt 4N
Close - Plumbing
Basin/sink
Nov 24, 2008 · Apt 4N
Close - Heating
Heat related
Nov 18, 2008 · Apt 5W
Close - Heating
Heat related
Oct 30, 2008 · Apt 5W
Close - General
Floor
Oct 21, 2008 · Apt 4W
Close - Plumbing
Basin/sink
Sep 24, 2008 · Apt 4N
Close - Plumbing
Basin/sink
Sep 22, 2008 · Apt 4N
Close - Appliance
Electric/gas range
Sep 22, 2008 · Apt 4N
Close - Appliance
Refrigerator
Sep 22, 2008 · Apt 4N
Close - Paint/plaster
Wall
Nov 13, 2007 · Apt 2S
Close - Appliance
Refrigerator
Jul 11, 2007 · Apt 4N
Close - Electric
Electric-supply
Jul 7, 2007 · Apt 5W
Close - Paint/plaster
Ceiling
Jun 19, 2007 · Apt 5W
Close - Plumbing
Water-leaks
Jun 19, 2007 · Apt 5W
Close - Paint/plaster
Wall
Jun 19, 2007 · Apt 5W
Close - Paint/plaster
Ceiling
Jun 19, 2007 · Apt 5W
Close - General
Floor
May 9, 2007 · Apt 4N
Close - General
Windows
May 9, 2007 · Apt 4N
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 10, 2026 | $1,600,000 | Coops - elevator apartments | — |
| Apr 13, 2026 | $5,300,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1925
- Floors
- 7
- Residential units
- 18
- Building area
- 43,404 ft²
- Lot area
- 7,554 ft²
- Zoning
- C4-6A
- Community board
- 107
- Council district
- 7
- Block / lot
- 1243 / 10
- Assessed value
- $6,690,150
- Landmark / historic district
- No
HPD registration #107868, last renewed Sep 18, 2025.
Questions about 2541 Broadway
Who owns 2541 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 251 West 95th Street Owners Corp.
Does 2541 Broadway have violations?
Yes. NYC HPD has recorded 60 housing violations at this property.
Is 2541 Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2541 Broadway built?
City records list 1925 as the year it was built.
How many apartments are in 2541 Broadway?
It has 18 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.