255 West 93 Street
Manhattan, NY 10025BBL 1-01241-0108Map
Owner of record: Jnpj 93 St, LLC
255 West 93 Street is a walk-up apartment building built in 1897 in Manhattan, 10025. It has 10 residential units across 5 floors. The owner of record is Jnpj 93 St, LLC. HPD has recorded 93 housing violations here, most recently on June 18, 2026.
- HPD violations
- 93
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 76
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 93
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Jun 18, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Jun 18, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story
Jun 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jun 18, 2026
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Jun 18, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective at ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Jun 18, 2026 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 18, 2026
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective ventilation mechanical system at the ceiling in the bathroom located at apt 3b, 4th story, 1st apartment from west at north
Jun 10, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 3rd room from east located at apt 3b, 4th story, 1st apartment from west at north
Jun 10, 2024 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3b, 4th story, 1st apartment from west at north
Jun 10, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective formica counter top at sink in the kitchenette located at apt 3b, 4th story, 1st apartment from west at north
Jun 10, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system, at ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at rang, in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling, approx 4 (sq ft) in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramice tiles at east wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and west walls in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Nov 11, 2023 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east and south wall in the kitchenette located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall, trim and molding in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Aug 3, 2022 · Apt 3B
Closed — Violation dismissed - BHazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt phs, 5th story, 1st apartment from east at south
Apr 5, 2019 · Apt PHS
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room at cellar
Mar 9, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1s, 1st story, 1st apartment from south at west
Mar 9, 2019 · Apt 1S
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1s, 1st story, 1st apartment from south at west
Mar 9, 2019 · Apt 1S
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt phs, 6th story, 1st apartment from east at south
Apr 30, 2017 · Apt PHS
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 2nd room from north located at apt phs, 6th story, 1st apartment from east at south
Apr 30, 2017 · Apt PHS
Closed — Violation closed - BHazardous
Properly repair the broken or defective sash chain at lower sash at 2nd window at east in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Feb 24, 2017 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventilation system in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Feb 24, 2017 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood window frame in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from north at east
Feb 24, 2017 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective sash chain at lower sash at 1st window at east in the 1st room from north located at apt 3b, 3rd story, 1st apartment from north at east
Feb 24, 2017 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Dec 7, 2016
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from north at east
Dec 7, 2016 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Dec 7, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Dec 7, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and west walls in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Dec 7, 2016 · Apt 3B
Closed — Violation closed - ANon-hazardous
Replace with new the broken or defective electrical light switch face plate at west wall in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Dec 7, 2016 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical ventilation system in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Dec 7, 2016 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
Dec 7, 2016 · Apt 3B
Closed — Violation closed
DOB building violations · 6
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Construction other optional
C-construction other optional
Sep 22, 2000
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 2
- Non-hazardous
Work w/o a permit:expired permit. permit #104286283 expired 4/1/06. work noted:the installation of wood studs for new partition walls, the installation of new wood framing @ ceiling & the installation of new pl
Jun 8, 2006 · Penalty $250
Resolve - Non-hazardous
Work without a permit:noted gut demo in apt 3a, new wooden partitions (2"x4")erected new plumbing being installed.remedy:stop all work obtain and maintaining all proper permits + plans with d.o.b.
Sep 22, 2000 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Sep 4, 2026 · Apt 3B
Close - General
Ventilation system
May 4, 2026 · Apt 3B
Close - Safety
Fire escape
Sep 18, 2024 · Apt 3B
Close - Door/window
Window frame
Sep 18, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
May 13, 2024 · Apt 3B
Close - Safety
Fire escape
May 13, 2024 · Apt 3B
Close - General
Ventilation system
May 13, 2024 · Apt 3B
Close - Plumbing
Water supply
Mar 17, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 17, 2024 · Apt 3A
Close - Heat/hot water
Apartment only
Mar 17, 2024 · Apt 1N
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 6, 2024 · Apt 3A
Close - Paint/plaster
Ceiling
Nov 9, 2023 · Apt 3B
Close - Paint/plaster
Ceiling
Nov 9, 2023 · Apt 3B
Close - General
Ventilation system
Nov 9, 2023 · Apt 3B
Close - Paint/plaster
Ceiling
Nov 9, 2023 · Apt 3B
Close - Electric
No lighting
Aug 14, 2023 · Apt BLDG
Close - Electric
No lighting
May 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 28, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 21, 2020 · Apt 3S
Close - Heat/hot water
Entire building
May 13, 2019 · Apt 4B
Close - Heat/hot water
Entire building
May 1, 2019 · Apt 1B
Close - Heat/hot water
Entire building
Mar 9, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 9, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 8, 2019 · Apt 1S
Close - Heat/hot water
Entire building
Mar 7, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2019 · Apt 3A
Close - Heat/hot water
Entire building
Feb 14, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2019 · Apt 3S
Close - Heat/hot water
Apartment only
Feb 13, 2019 · Apt 1S
Close - Heat/hot water
Entire building
Feb 9, 2019 · Apt PHS
Close - Heat/hot water
Apartment only
Feb 2, 2019 · Apt 1S
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 2B
Close - Heat/hot water
Entire building
Jan 22, 2019 · Apt 3S
Close - Heat/hot water
Entire building
Jan 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2018 · Apt 3S
Close - Heat/hot water
Entire building
Jan 14, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2018 · Apt 1S
Close - Heat/hot water
Entire building
Jan 13, 2018 · Apt 3A
Close - Heat/hot water
Entire building
Jan 7, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2018 · Apt APT1S
Close - Heat/hot water
Entire building
Jan 5, 2018 · Apt 3S
Close - Heat/hot water
Entire building
Dec 28, 2017 · Apt 1S
Close - Heat/hot water
Entire building
Nov 16, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt 2B
Close - Unsanitary condition
Mold
Jan 30, 2017 · Apt PHS
Close - Door/window
Door
Dec 2, 2016 · Apt 3B
Close - Electric
No lighting
Dec 2, 2016 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Dec 2, 2016 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1897
- Floors
- 5
- Residential units
- 10
- Building area
- 6,552 ft²
- Lot area
- 1,818 ft²
- Zoning
- R8
- Community board
- 107
- Council district
- 7
- Block / lot
- 1241 / 108
- Assessed value
- $1,591,200
- Landmark / historic district
- Riverside-West End Historic District
HPD registration #129526, last renewed Jul 8, 2025.
Questions about 255 West 93 Street
Who owns 255 West 93 Street?
The owner of record in NYC Department of City Planning PLUTO data is Jnpj 93 St, LLC.
Does 255 West 93 Street have violations?
Yes. NYC HPD has recorded 93 housing violations at this property.
Is 255 West 93 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 255 West 93 Street built?
City records list 1897 as the year it was built.
How many apartments are in 255 West 93 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.