roofy

689 Columbus Avenue

Manhattan, NY 10025BBL 1-01207-0001Map

Owner of record: Strycker's Bay Apts INC

689 Columbus Avenue is an elevator apartment building built in 1965 in Manhattan, 10025. It has 234 residential units across 16 floors. The owner of record is Strycker's Bay Apts INC. HPD has recorded 109 housing violations here, most recently on May 27, 2026. 7 of the 50 most recent violations are still open.

HPD violations
109
DOB violations
90
ECB violations
65
HPD complaints
181

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 109

  • C

    Remove device preventing door from being self-closing sweeper at door in the entrance located at apt 12e, 12th story, 1st apartment from west at north

    May 27, 2026 · Apt 12E

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 12e, 12th story, 1st apartment from west at north

    Feb 1, 2025 · Apt 12E

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 12e, 12th story, 1st apartment from west at north

    Feb 1, 2025 · Apt 12E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at shower stall in the 2nd bathroom from east located at apt 12e, 12th story, 1st apartment from west at north

    Feb 1, 2025 · Apt 12E

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling at shower stall in the 2nd bathroom from east located at apt 12e, 12th story, 1st apartment from west at north

    Feb 1, 2025 · Apt 12E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 10e, 10th story, 1st apartment from west at north

    Nov 13, 2024 · Apt 10E

    Open — Defect letter issued
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet of mold at all walls at closet in the 1st room from east at north located at apt 10e, 10th story, 1st apartment from east at south

    Sep 14, 2024 · Apt 10E

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet of mold at all walls at closet in the 1st room from east at north located at apt 10e, 10th story, 1st apartment from east at south original violation 17274238 issued 14-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 14, 2024 · Apt 10E

    Open — Defect letter issued
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from east located at apt 10e, 10th story, 1st apartment from east at south

    Sep 14, 2024 · Apt 10E

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 10e, 10th story, 1st apartment from east at south

    Sep 14, 2024 · Apt 10E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 10e, 10th story, 1st apartment from east at south

    Sep 14, 2024 · Apt 10E

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles at public hall, 10th story

    Sep 14, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at stair ''a'' door at public hall, 1st story

    Sep 4, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Sep 4, 2024

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... appx. 6 sqft at ceiling in the bathroom located at apt 10c, 10th story, 1st apartment from south at west

    Mar 27, 2024 · Apt 10C

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 10c, 10th story, 1st apartment from south at west

    Mar 27, 2024 · Apt 10C

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 10c, 10th story, 1st apartment from south at west

    Mar 27, 2024 · Apt 10C

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall of east 1 closet in the private hallway located at apt 10c, 10th story, 1st apartment from south at west

    Mar 27, 2024 · Apt 10C

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... appx. 6 sqft at ceiling in the bathroom located at apt 10c, 10th story, 1st apartment from south at west original violation 16776429 issued 27-mar-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Mar 27, 2024 · Apt 10C

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 16f, 16th story, 1st apartment from south at west

    Nov 20, 2023 · Apt 16F

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of vermin ants and millipedes in the entire apartment located at apt 10e, 10th story, 1st apartment from west at north

    Jul 15, 2023 · Apt 10E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 10e, 10th story, 1st apartment from west at north

    Jul 15, 2023 · Apt 10E

    Open — Defect letter issued
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at apt 10e, 10th story, 1st apartment from west at north

    Jul 13, 2023 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from north located at apt 10e, 10th story, 1st apartment from west at north

    Jul 13, 2023 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from north located at apt 10e, 10th story, 1st apartment from west at north

    Jul 13, 2023 · Apt 10E

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 10e, 10th story, 1st apartment from west at north

    Jul 13, 2023 · Apt 10E

    Open — Defect letter issued
  • C

    Replace or repair the self-closing doors that is missing or defective spring hinges in the entrance located at apt 10e, 10th story, 1st apartment from west at north

    Jul 13, 2023 · Apt 10E

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall in the 1st room from east at north located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls in the 2nd room from east located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • A

    Refit the door in the entrance located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at all walls in the private hallway located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    Jul 20, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical light switch on south wall, in the 1st room from east located at apt 17c, 17th story, 1st apartment from east at south

    Jun 9, 2022 · Apt 17C

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical light switch on north wall, in the 2nd room from east at south located at apt 17c, 17th story, 1st apartment from east at south

    Jun 9, 2022 · Apt 17C

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at hopper doors at 17th., 15th.,11th.,9th.,7th.,5th.,3rd., and 1st. stories at public hall

    Jun 9, 2022

    Closed — Violation closed
  • B

    Replace with new the broken or defective electric outlet at east wall in the 1st room from east at north located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Replace with new the broken or defective electric outlet at east wall in the 5th room from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Replace with new the broken or defective electric switch on east wall second from north in the 5th room from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Replace with new the broken or defective electric switch on east wall 1st from north in the 5th room from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st bathroom from east located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed
  • B

    Repair or replace the smoke detector not installed within 15 feet of sleeping areas, 2 required in the entire apartment located at apt 10e, 10th story, 1st apartment from west at north

    May 7, 2022 · Apt 10E

    Closed — Violation closed

DOB building violations · 90

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    May 31, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 7, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 19, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    Cease use

    May 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    May 28, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 28, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2018

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 11, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2014

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2012

    Dob violation - resolved

ECB violations · 65

  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #903762. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #912982. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain exterior wall&appurtenances@n,e,s elevations (exp1,2,3) observed deteriorated/missing mortar joints around corner windowlintels b/w 11,14fl.also observed damaged mortar joints@e elevation,ex

    Jul 1, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain exterior building facade & appurtenances.note:observed at exp #1(columbus ave)cracked/spalling bricks at 11th floor lintel area.cracked/spalling stucco at parapet throughout.remedy:maintain

    Jun 16, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Work contrary to construction design drawing(cd-5)at time of inspection of an active jobsite i observed workers on suspended scaffold at exposure#1 and #2.upon review of cd-5 i observed that the tieback anchor

    Apr 5, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents at job site at time of inspection. note:at time of inspection i gained access tothe building and went to the roof where there were 7 men working on ho

    Dec 24, 2020

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications. verticals nearest the curb cut not protected against displacement. noted at time ofinspection i observed active site for which a ssm is required w/ the s

    May 12, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    All equipment must be installed as per approved cd/5 plan. noted:at time of inspection i observed suspended angular scaffold in use w/ the anchor plate for the tie back and life line installed contrary to the a

    May 12, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    1rcny 104-20 certificate of fitness for scaffold users. noted:at time of inspection i observed active facade job w/ suspended scaffold in use. the workers on the suspended scaffold(3) including the competent pe

    May 12, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Work does not conform to approved construction document. noted:at timeof inspection i observed sws in place that is contrary to the approvedplan. shed is missing the cross braces/lateral braces on the inside of

    May 12, 2020 · Penalty $3,125

    Resolve
Show 40 more ↓
  • Class - 1

    Bc-3314.4.2.1 rigger or designated foreman must be on site while use of suspended scaffold is in progress. noted:at time of inspection i observed multipoint suspended scaffold in use w/ the foreman/competent pe

    May 12, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc-3301.1.3 failure to comply w/ the manufacturer specification. noted:at time of inspection i observed suspended scaffold in use w/ the outreach of the outrigger beam contrary to the manufacturer spec. base on

    May 12, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    1rcny 3310-01 written designation of the qualified person. noted:at time of inspection i observed active facade job site for which a ssm is required w/ the qualified person not designated by the permit holder.

    May 12, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Bc 3309.10 protection of roof.note=at the time of my inspection,i observed facade operation in progress at exposure 1 out 3, i also observedthat there were no roof protection in place provided.failure to provid

    Feb 26, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to institute and maintain safety equipment measures and temporary construction(overhead protection)note=at the time of my inspectioni observed construction work on the balconies at exposure 3 with scaff

    Feb 26, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Work w/o a permit/exp permit. note: at the time of inspection observeda facade work(on going facade work)in progress. at exp#1 balcony facades are under construction w/form work. i also observed in the dob bis

    Jan 13, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications bc3307.6.4.2.2. note: at the time of inspection observed a sidewalk shed & overhead protection at exp#1. that overhead protection is accessible for tenant

    Jan 13, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Site safety training required. note: at the time of inspection observed a 21 sty bldg under facade work. active jobsite person identify as competent person or any other person on this site have no sst card with

    Jan 13, 2020 · Penalty $12,500

    Resolve
  • Class - 2

    Failure to post of distribute notice of ttp at the time of inspection on an aoccupied building on an atcive jobsite as i walk trhough the building i observed that no postin of ttp was posted in common area of b

    Nov 25, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to post or distribute :safe construction: bill of rights at the of inspection in an occupied building on an actiev jobsite as i walk through teh building i observed that no posting of bill of rights was

    Nov 25, 2019 · Penalty $5,000

    Resolve
  • Class - 3

    Rcny-3301-03=failue to provide required worker safety informationsign as per rcny 1-3301-039a) noted workers on site working applicatoin (3121240429)without the required worker sfaety inbformation sign posted x

    Nov 25, 2019 · Penalty $250

    Resolve
  • Class - 1

    Bc3308.5=inadequate verticla sfatey netting atr the tim eof inspectionof a 21 story building i observed at epxosure 1 and 2 vertical nettinga roudn piep scaffolding with gap opening and noyt properly secured w

    Nov 25, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    3301.1.2 failure to comply with fdny codes; at th etime of my swo re-inspection, observed 1 worker performing welding / torching, but there were no fireguard around the welder. rmdy: provide fireguard when torc

    Jun 6, 2019

    Resolve
  • Class - 2

    3301.1.2 failure to comply w/ fdny codes. at the time of my swo re-inspection,observed 1 worker performing welding/torching,but there was nofire guard around the welder. remedy:provide fire guard when torching/

    Jun 6, 2019

    Resolve
  • Class - 1

    Sec. 3314.4.3.2.1 ailure to provide installation inspection report. attime of inspection,observed a suspended scaffold installed at exp#3 & outrigers at roof level upon request for installation report for suspe

    Jan 28, 2019 · Penalty $312

    Resolve
  • Class - 1

    Sec. 3301.6 design drawings. at time of inspection of 21 sty alt-2 observed a supported scaffold outrigging system consisting of threaded through bolt,c-channel,& shackle tieback system installed on bulkhead

    Jan 28, 2019

    Resolve
  • Class - 1

    Bc:3314.4.3.1 no records of daily inspection of suspended scaffold performed by authorized person @site.@time of inspection observed suspended saffold installed @exp#3 for facade work.upon request for daily

    Jan 28, 2019

    Resolve
  • Class - 1

    Failure to file evidence of compliance w/workers comp,law &/or disability benefits law. at time of inspection on an active alt-2 site,observed suspended scaffold at exp#3 & outriggers in place at multiple expos

    Jan 28, 2019 · Penalty $5,000

    Resolve
  • Class - 2

    Failed to notify dept prior to installation of suspended scaffold. at time of inspection,observed a suspended scaffold installed at exp#3 ofbldg. upon request for notification to the dob prior to installing the

    Jan 28, 2019

    Resolve
  • Class - 1

    Failure to file evidence of compliance w/workers comp law &/or disability benefit law. at time of inspection an active alt-2 site,observed suspended scaffold & outriggers exp#3,& supports on multiple location

    Jan 28, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents-detail for pipe scaffold. at time of inspection observed pipe scaffold erected on the balconies at exp#1. upon review of the detail provided for the pipe

    Jan 28, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to post or distribute notice of tenants protection plan. note:at time of inspection i observed no tenant protection plan posted. failure to post or distribute tenant protection plan in occupied building

    Jan 24, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to notify the dept prior to commencement of work that requirestenant protection plan. note:the owner shall notify the dept in writing at least 72 hours prior to commencement of any work that requires(re

    Jan 24, 2019 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to file evidence of compliance w/ workers comp law and/or disability benefits law. at time of inspection on an active job site of a 26' story building,after doing further research on bis that alerted me

    Jan 24, 2019 · Penalty $12,500

    Resolve
  • Class - 1

    28-401.16 restrictions on use of license. no holder of a license issued under this chapter shall authorize consent to or permit the use of his or her license by or on behalf of any other person,and no person wh

    Jan 24, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to post or distribute "safe construction bill of rights". note:failure to post safe construction bill of rights job#121240479 pertaining to an occupied building w/ means and methods of construction oper

    Jan 24, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#812982. remedy: file acceptable report

    Aug 1, 2018 · Penalty $625

    Resolve
  • Class - 2

    Faillure to file acceptable amendend cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control # 803762. remedy: file acceptable report

    Aug 1, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Cu-5a10. door zone restrictor not working. this is a safety feature to ensure elevator passenger ssaety. repair restrictor and contact nycdob.

    Jul 27, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Cu5a10 door zone restrictor not working. this is a safety feature to ensure elevator passengers safety. repair restrictor and contact nycdob.

    Jul 27, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Partial swo issued for facade restoration work pursuant to 28-207.2 and posted on premises.failure to designate site safety manager noted:attime of inspection the respondent failed to designate site safety mana

    Jun 25, 2018 · Penalty $10,000

    Resolve
  • Class - 2

    100b7.75b11.39o2.71l11.52h11.99bb5.100b provide two-way communication 75b buffers shall be minium 6" 107.1b 39o top of cab clean all 71l replace lite 52h replace all ropes regrove sheave both device 1p27619 1p2

    Feb 11, 2010 · Penalty $500

    Resolve
  • Non-hazardous

    84x10,66o02.84x-car communications inoperative repair.66o-clean pit

    Apr 16, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    84x10,66o02,71x07.84x-car communications inoperative,repair.66o-clean pit.71x-provide light for underside platform

    Apr 16, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to maintain bldg. defect noted: the ventilation system is not working. no circulation of air. noted location:public hallways from the 3rd fl upwards. (3-17) remedy: repair/replace ventilation system.

    Aug 2, 2006

    Resolve
  • Non-hazardous

    Failure to maintain bldg. defect noted: the ventilation system is not working, no circulation of air. noted location:throughout the public hallways on all floors. remedy:repair/replace ventilation system.

    Aug 2, 2006

    Resolve
  • Non-hazardous

    85u05/51b14 51-provide proper clearance ctw side

    Mar 22, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    85u05/51b14 51-provide proepr clearance ctw side

    Mar 22, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    85bb5,41g11,44q3,4p7,59b11,23b10,17h11. 23 roller dail not working all floors. 17-3-4-10-21 floors.

    Aug 26, 2003

    Resolve
  • Non-hazardous

    85bb5,41g11,59b11,23b10,31h11,17h11,10m7,32o2,33o2,38o2,66o2,67o2,68o2. 41-secure relay to side of controller 23 roller dail not working all floors. 17-b-l-4-10-13 floors.

    Aug 26, 2003

    Resolve

Complaints

  • Heat/hot water

    Entire building

    May 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2025 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Aug 29, 2025 · Apt BASEME

    Close
  • Plumbing

    Water supply

    Apr 9, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2025 · Apt BLDG

    Close
  • Water leak

    Slow leak

    Jan 23, 2025 · Apt 12E

    Close
  • Paint/plaster

    Ceiling

    Jan 23, 2025 · Apt 12E

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 13, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Nov 6, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Pests

    Oct 31, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Mold

    Sep 9, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Pests

    Sep 9, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Mold

    Sep 7, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Pests

    Sep 7, 2024 · Apt 10E

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2024 · Apt 10E

    Close
  • General

    Ventilation system

    Aug 18, 2024 · Apt 18C

    Close
  • Heat/hot water

    Entire building

    May 20, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Ceiling

    Feb 23, 2024 · Apt 10C

    Close
  • Unsanitary condition

    Mold

    Feb 23, 2024 · Apt 10C

    Close
  • General

    Ventilation system

    Dec 25, 2023 · Apt 18C

    Close
  • Heat/hot water

    Entire building

    Oct 23, 2023 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Jul 8, 2023 · Apt 10E

    Close
  • Water leak

    Damp spot

    Jun 22, 2023 · Apt 10E

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2023 · Apt 10E

    Close
  • Heat/hot water

    Entire building

    Feb 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jan 3, 2023 · Apt ITSTHE

    Close
  • Unsanitary condition

    Pests

    Jan 3, 2023 · Apt ITSTHE

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 19, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1965
Floors
16
Residential units
234
Building area
303,950 ft²
Lot area
50,200 ft²
Zoning
C2-8
Community board
107
Council district
6
Block / lot
1207 / 1
Assessed value
$17,455,500
Landmark / historic district
No

HPD registration #138875, last renewed Oct 28, 2025.

Questions about 689 Columbus Avenue

Who owns 689 Columbus Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Strycker's Bay Apts INC.

Does 689 Columbus Avenue have violations?

Yes. NYC HPD has recorded 109 housing violations at this property.

Is 689 Columbus Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 689 Columbus Avenue built?

City records list 1965 as the year it was built.

How many apartments are in 689 Columbus Avenue?

It has 234 residential units and 249 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.