roofy

273 West 73 Street

Manhattan, NY 10023BBL 1-01165-0105Map

Owner of record: 273 West 73rd Street,

273 West 73 Street is a walk-up apartment building built in 1889 in Manhattan, 10023. It has 10 residential units across 5 floors. The owner of record is 273 West 73rd Street,. HPD has recorded 39 housing violations here, most recently on October 12, 2024. 7 of the 39 most recent violations are still open.

HPD violations
39
DOB violations
11
ECB violations
2
HPD complaints
39

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 12, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 39

  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at building entrance door

    Oct 12, 2024

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing kickdown doorstopper at building entrance door , 1st story

    Sep 3, 2022

    Closed — Violation dismissed
  • A

    Replace with new the missing safety covers or plugs at electrical outlet at north wall at public hall stairs, 1st story

    Oct 16, 2021

    Closed — Violation dismissed
  • A

    Replace with new the missing safety covers or plugs at electrical outlet at east at public hall, 1st story

    Oct 16, 2021

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective mortise lock at door in the entrance located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 16, 2021 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 16, 2021 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 16, 2021 · Apt 3B

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    Oct 16, 2021 · Apt 3B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 30, 2021 · Apt 2A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 30, 2021 · Apt 2A

    Open — Invalid certification
Show 29 more ↓
  • B

    Properly repair the broken or defective mechanical air ventilation at ceiling in the bathroom located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 30, 2021 · Apt 2A

    Open — Invalid certification
  • A

    Properly repair the broken or defective electrical ceiling light fixture in the 3rd room from north at east located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Open — Invalid certification
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Open — Invalid certification
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling (approx. 10 sq.ft.) in the bathroom located at apt 2a, 1st story, 2nd apartment from north at east

    Sep 17, 2021 · Apt 2A

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 1st room from north at west located at apt 5b, 4th story, 1st apartment from north at east

    Dec 19, 2019 · Apt 5B

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak at the ceiling and east wall in the 1st room from north at west located at apt 5b, 4th story, 1st apartment from north at east

    Dec 19, 2019 · Apt 5B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 5b, 4th story, 1st apartment from north at east

    Dec 19, 2019 · Apt 5B

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130f degrees at all hot water fixtures located at apt 1b, 1st story, 1st apartment from east at south

    May 11, 2018 · Apt 1B

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Apr 14, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Apr 14, 2018

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Apr 14, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at basement at public hall

    Apr 14, 2018

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall

    Apr 14, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Apr 14, 2018

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees fahrenheit in the entire apartment located at bsmt-apt 1b, bsmt-apt at east

    Apr 14, 2018 · Apt 1B

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding a maximum temperature of 130 degress at all hot water fixtures. in the entire apartment located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the 1st room from north located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Replace the broken or defective radiator shut-off valve handle in the 1st room from north located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak over ceiling in the kitchen located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and east wall approximately 5 sq. ft. in the kitchen located at apt 1b, 1st apartment from north at east

    Mar 13, 2018 · Apt 1B

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at bsmt-apt 1a, 1st bsmt-apt from north at east

    Mar 25, 2015 · Apt 1A

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    May 15, 2014 · Apt 3A

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east

    May 15, 2014 · Apt 3A

    Closed — Violation dismissed

DOB building violations · 11

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
Show 1 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active

ECB violations · 2

  • Class - 2

    36) found smith boiler model - 19he 520,000 btu's unregistered and operating. register boiler and correct all violating conditions and submit a certificate of correction.

    Sep 18, 2017 · Penalty $500

    Active
  • Class - 2

    B254,15,16,24b,28a,32a,34a,b,50,50a,b,c,36. 50- 3 pressure controls on1/4" pipe n/g. 50a- missing louver for fresh air. 50b- flue pipe not supported. 50c- soot on boiler needs cleaning.

    Mar 5, 2012

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 10, 2024 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Aug 10, 2022 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2022 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Oct 10, 2021 · Apt 3B

    Close
  • Water leak

    Slow leak

    Oct 10, 2021 · Apt 3B

    Close
  • Door/window

    Door

    Oct 10, 2021 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Oct 10, 2021 · Apt 3B

    Close
  • Water leak

    Damp spot

    Oct 10, 2021 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Oct 10, 2021 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Sep 28, 2021 · Apt 3B

    Close
Show 29 more ↓
  • Unsanitary condition

    Pests

    Sep 28, 2021 · Apt 3B

    Close
  • Water leak

    Slow leak

    Sep 28, 2021 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Sep 20, 2021 · Apt 2A

    Close
  • Water leak

    Damp spot

    Sep 20, 2021 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Sep 20, 2021 · Apt 2A

    Close
  • Water leak

    Damp spot

    Sep 14, 2021 · Apt 2A

    Close
  • General

    Ventilation system

    Sep 14, 2021 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Sep 14, 2021 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Sep 14, 2021 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Dec 14, 2019 · Apt 5B

    Close
  • Paint/plaster

    Ceiling

    Dec 14, 2019 · Apt 5B

    Close
  • Water leak

    Slow leak

    Mar 4, 2018 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Mar 4, 2018 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2017 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2016 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2016 · Apt 5B

    Close
  • General

    Cooking gas

    Feb 16, 2015 · Apt 1A

    Close
  • Water leak

    Slow leak

    May 18, 2014 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 18, 2014 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 4, 2014 · Apt 3A

    Close
  • Water leak

    Heavy flow

    May 4, 2014 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    May 4, 2014 · Apt 3A

    Close
  • Heating

    Heat related

    Nov 24, 2011 · Apt 1B

    Close
  • Heating

    Heat related

    Nov 24, 2011 · Apt 5B

    Close
  • Heating

    Heat-plant

    Nov 20, 2011 · Apt 1B

    Close
  • Plumbing

    Water supply

    Nov 20, 2011 · Apt 1B

    Close
  • Plumbing

    Water supply

    Nov 20, 2011 · Apt 1B

    Close
  • Heating

    Heat related

    Jun 2, 2009 · Apt 2A

    Close
  • Heating

    Heat related

    Nov 30, 2004 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1889
Floors
5
Residential units
10
Building area
5,597 ft²
Lot area
1,839 ft²
Zoning
R8B
Community board
107
Council district
6
Block / lot
1165 / 105
Assessed value
$1,620,000
Landmark / historic district
West End-Collegiate Historic District Extension

HPD registration #124012, last renewed Jul 14, 2026.

Questions about 273 West 73 Street

Who owns 273 West 73 Street?

The owner of record in NYC Department of City Planning PLUTO data is 273 West 73rd Street,.

Does 273 West 73 Street have violations?

Yes. NYC HPD has recorded 39 housing violations at this property.

Is 273 West 73 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 273 West 73 Street built?

City records list 1889 as the year it was built.

How many apartments are in 273 West 73 Street?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.