25 West 71 Street
Manhattan, NY 10023BBL 1-01124-0020Map
Owner of record: 25 W 71 St Owners INC
25 West 71 Street is a walk-up apartment building built in 1891 in Manhattan, 10023. It has 10 residential units across 4 floors. The owner of record is 25 W 71 St Owners INC. HPD has recorded 60 housing violations here, most recently on June 4, 2025. 30 of the 50 most recent violations are still open.
- HPD violations
- 60
- DOB violations
- 10
- ECB violations
- 7
- HPD complaints
- 59
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 60
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenette located at apt 4r, 4th story, 1st apartment from west at north
Aug 6, 2022 · Apt 4R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Aug 6, 2022 · Apt 4R
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jul 13, 2022 · Apt 4R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jul 13, 2022 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at washbasin in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jul 13, 2022 · Apt 4R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jul 13, 2022 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jul 13, 2022 · Apt 4R
Open — Certification postponment denied
Show 40 more ↓
- ANon-hazardous
Replace with new the defective flush pipe of water closet .. in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Certification postponment granted - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the kitchenette located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenette located at apt 4r, 4th story, 1st apartment from west at north
Jun 10, 2022 · Apt 4R
Open — Certification postponment granted - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
May 24, 2022 · Apt 4R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenette located at apt 4r, 4th story, 1st apartment from west at north
May 24, 2022 · Apt 4R
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
May 24, 2022 · Apt 4R
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
May 24, 2022 · Apt 4R
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic tiles under washbasin at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 28, 2022 · Apt 4R
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall approx 3 sq.ft in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 28, 2022 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 28, 2022 · Apt 4R
Open — Certification postponment denied - BHazardous
Trace and repair the source and abate the visible mold condition... at east wall approx 3 sq.ft in the bathroom located at apt 4r, 4th story, 1st apartment from west at north original violation 15130164 issued 28-apr-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 28, 2022 · Apt 4R
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenette located at apt 4r, 4th story, 1st apartment from west at north
Apr 17, 2022 · Apt 4R
Open — Certification postponment granted - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 17, 2022 · Apt 4R
Open — Certification postponment granted - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 17, 2022 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Apr 17, 2022 · Apt 4R
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Nov 30, 2018 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Nov 30, 2018 · Apt 4R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 10, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4r, 4th story, 1st apartment from east at south
Sep 27, 2018 · Apt 4R
Open — Nov sent out - ANon-hazardous
Replace with new the missing covers or caps at electric outlet at east wall at public hall, 3rd story
Jul 21, 2017
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor and vinyl composite tiles in the kitchenette located at apt 4r, 4th story, apartment at north
Jul 21, 2017 · Apt 4R
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system on the boiler room door and at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , at public hall, 1st story
Jul 21, 2017
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 4rear, 4th story, 1st apartment from west at north
Dec 2, 2016 · Apt 4REAR
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls in the 1st room from north located at apt 4r, 4th story, apartment at north
Sep 23, 2016 · Apt 4R
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the walls and ceiling in the 1st room from north located at apt 4rear, 4th story, 1st apartment from west at north
Jul 14, 2016 · Apt 4REAR
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective uneven wood floor in the 1st room from north located at apt 4rear, 4th story, 1st apartment from west at north
Jul 14, 2016 · Apt 4REAR
Open — Invalid certification - BHazardous
Arrange and make self-closing the doors door to extension roof in the 1st room from north located at apt 4rear, 4th story, 1st apartment from west at north
Jul 14, 2016 · Apt 4REAR
Open — Invalid certification - ANon-hazardous
Refit door in the terrace located at apt 4rear, 4th story, 1st apartment from west at north
Jul 14, 2016 · Apt 4REAR
Closed — Violation closed
DOB building violations · 10
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Landmark none
Landmrk-landmark none
Jul 21, 1994
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jul 21, 1994
Dob violation - dismissed
ECB violations · 7
- Class - 1
Work without a permit.on 03/01/17 @ approx 9:15am i observed in the basement newly installed gas piping an fittings installed without no permit on file.rem:obtain all required permits.*pictures taken*
Mar 1, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain building in code compliant manner.on 03/01/17 @ approx 9:15am i observed on the 1st flr backyard area the installation of a bbq installed which is prohibited and not code compliant.rem:repai
Mar 1, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to have new or altered plumbing system tested on 03/01/17 @ approx 9:15am i observed in the basement newly installed gas piping and fittings installed without no inspections or test on file under dob re
Mar 1, 2017 · Penalty $1,000
Resolve - Class - 3
Work w/o a permit. work noted: relocated existing chimney flues on roof. job #120203742 is approved but not permitted. remedy: obtain permit.
Jul 27, 2012 · Penalty $200
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with department of buildings. noted: no certificate of correction filed for ecb violation #34579717y. rem: file certificate of
Apr 8, 2009
Resolve - Non-hazardous
Work w/o a permit.work noted:the extension of new metal chimney flues & fireplace flues.noted location:roof.remedy:obtain permit.
Jun 18, 2007
Resolve - Non-hazardous
Altered building occupied without a valid c of o as required under open alteration 1237/87 at basement level remedy obtain a new c of o
Aug 14, 1989 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Jul 22, 2022 · Apt 4R
Close - Plumbing
Basin/sink
Jun 1, 2022 · Apt 4R
Close - Water leak
Slow leak
Jun 1, 2022 · Apt 4R
Close - Paint/plaster
Wall
Jun 1, 2022 · Apt 4R
Close - Paint/plaster
Wall
Jun 1, 2022 · Apt 4R
Close - Plumbing
Toilet
Jun 1, 2022 · Apt 4R
Close - Plumbing
Basin/sink
Jun 1, 2022 · Apt 4R
Close - Unsanitary condition
Mold
Jun 1, 2022 · Apt 4R
Close - Plumbing
Basin/sink
May 20, 2022 · Apt 4R
Close - Unsanitary condition
Pests
May 20, 2022 · Apt 4R
Close
Show 40 more ↓
- Water leak
Slow leak
May 20, 2022 · Apt 4R
Close - Unsanitary condition
Mold
May 20, 2022 · Apt 4R
Close - Paint/plaster
Wall
May 20, 2022 · Apt 4R
Close - Unsanitary condition
Mold
May 18, 2022 · Apt 4R
Close - Paint/plaster
Wall
Apr 18, 2022 · Apt 4R
Close - Paint/plaster
Wall
Mar 28, 2022 · Apt 4R
Close - Plumbing
Basin/sink
Mar 28, 2022 · Apt 4R
Close - Unsanitary condition
Pests
Mar 28, 2022 · Apt 4R
Close - Unsanitary condition
Pests
Mar 28, 2022 · Apt 4R
Close - Paint/plaster
Wall
Nov 24, 2018 · Apt 4R
Close - Plumbing
Bathtub/shower
Nov 24, 2018 · Apt 4R
Close - Paint/plaster
Wall
Nov 24, 2018 · Apt 4R
Close - Flooring/stairs
Floor
Nov 24, 2018 · Apt 4R
Close - General
Cooking gas
Sep 24, 2018 · Apt 4R
Close - Unsanitary condition
Mold
Sep 8, 2016 · Apt 4R
Close - Water leak
Damp spot
Sep 8, 2016 · Apt 4R
Close - Water leak
Damp spot
Sep 8, 2016 · Apt 4R
Close - Paint/plaster
Wall
Sep 8, 2016 · Apt 4R
Close - Water leak
Damp spot
Sep 8, 2016 · Apt 4R
Close - Paint/plaster
Wall
Sep 8, 2016 · Apt 4R
Close - Water leak
Damp spot
Sep 8, 2016 · Apt 4R
Close - Door/window
Door
Jul 1, 2016 · Apt 4REAR
Close - Unsanitary condition
Mold
Jul 1, 2016 · Apt 4REAR
Close - Paint/plaster
Wall
Jul 1, 2016 · Apt 4REAR
Close - Paint/plaster
Wall
Jul 1, 2016 · Apt 4REAR
Close - General
Cabinet
Jul 1, 2016 · Apt 4REAR
Close - Appliance
Electric/gas range
Jul 1, 2016 · Apt 4REAR
Close - Flooring/stairs
Floor
Jul 1, 2016 · Apt 4REAR
Close - Unsanitary condition
Mold
Jul 1, 2016 · Apt 4REAR
Close - Heat/hot water
Apartment only
Mar 18, 2015 · Apt 1R
Close - Plumbing
Water-leaks
Jul 12, 2012 · Apt 4R
Close - Plumbing
Water-leaks
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Wall
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Ceiling
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Wall
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Ceiling
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Ceiling
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Wall
Jul 12, 2012 · Apt 4R
Close - Electric
Bell-buzzer/intercom
Jul 12, 2012 · Apt 4R
Close - Paint/plaster
Window/frame
Jul 12, 2012 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1891
- Floors
- 4
- Residential units
- 10
- Building area
- 4,804 ft²
- Lot area
- 1,937 ft²
- Zoning
- R8B
- Community board
- 107
- Council district
- 6
- Block / lot
- 1124 / 20
- Assessed value
- $1,967,400
- Landmark / historic district
- Upper West Side / Central Park West Historic District
HPD registration #108186, last renewed Oct 30, 2025.
Questions about 25 West 71 Street
Who owns 25 West 71 Street?
The owner of record in NYC Department of City Planning PLUTO data is 25 W 71 St Owners INC.
Does 25 West 71 Street have violations?
Yes. NYC HPD has recorded 60 housing violations at this property.
Is 25 West 71 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 25 West 71 Street built?
City records list 1891 as the year it was built.
How many apartments are in 25 West 71 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.