roofy

80 Central Park West

Manhattan, NY 10023BBL 1-01121-0029Map

Owner of record: 80 Cpw Apt Corp

80 Central Park West is an elevator apartment building built in 1967 in Manhattan, 10023. It has 165 residential units across 24 floors. The owner of record is 80 Cpw Apt Corp. HPD has recorded 18 housing violations here, most recently on January 29, 2016. 16 of the 18 most recent violations are still open.

HPD violations
18
DOB violations
34
ECB violations
28
HPD complaints
38

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 29, 2016

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 18

  • B

    Repair or replace the smoke detector missing located at apt 24g, 24th story, 1st apartment from west at north

    Jan 29, 2016 · Apt 24G

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 24g, 24th story, 1st apartment from west at north

    Jan 29, 2016 · Apt 24G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 27, 2008 · Apt 4C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 27, 2008 · Apt 4C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department walls in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 27, 2008 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 27, 2008 · Apt 4C

    Open — Nov sent out
  • B

    Replace the broken or defective wash basin in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 27, 2008 · Apt 4C

    Open — Nov sent out
  • C

    Replace the broken or defective and miissing water -closet in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north

    Aug 10, 2007 · Apt 4C

    Open — Nov sent out
  • A

    Replace the broken or defective wash basin in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north

    Aug 10, 2007 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north

    Aug 10, 2007 · Apt 4C

    Open — Nov sent out
Show 8 more ↓
  • B

    Repair the leaky and/or defective faucets at tub in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • C

    Replace the broken or defective and or missing water closet in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • B

    Replace the broken or defective and or missing wash basin in the bathroom located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • B

    Properly secure the loose ceiling light fixture in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 4c, 4th story, 2nd apartment from east at south

    Jun 5, 2007 · Apt 4C

    Open — Nov sent out
  • A

    D26-10.01 adm code properly secure the loose soap dish above bathtub 5th sty 2nd from south east at south apt 5c. located at apt 5c

    Jul 29, 1982 · Apt 5C

    Open — Nov sent out
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition 5th sty south east apt 5b and 5th sty 2nd from south east at south apt 5c combined creating one apt.

    Jul 29, 1982

    Open — Nov sent out

DOB building violations · 34

  • Construction other optional

    Failure to maintain building. owner to hire nyspe to submit report to ert [email protected] with in 5 days, addressing all conditions w/plans, photos, recommending time frame and repairs to be completed.

    Dec 28, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 9, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 4, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 4, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
Show 24 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 12, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 12, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2008

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Elevator elevatoroptional

    3

    Jun 28, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 1988

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 1988

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 1988

    Dob violation - resolved

ECB violations · 28

  • Class - 2

    Pops site doesn't have required pops signage. site is open to the public., comply with zr

    Jun 26, 2026 · Penalty $5,000

    Active
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order. note: respondnet failure to comply prior summon #35679772l dated(01/08/24). at time of inspection, i observed spalled concrete slab, cracked concrete

    Apr 16, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain parking structure unsafe condition.note:at time of inspection on an active parking structurte consisting of 2 level (cellar & sub-cellar) below 26 fl building observed spalling concrete/expo

    Jan 8, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Work without a permit. observed garage in a state of disrepair with loose concrete dislodged from rebar and bulging, shoring in place without permit where concrete has potential of further collapse., obtain all

    Dec 28, 2023 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building. observed garage in a state of disrepair with loose concrete dislodged from rebar and bulging, shoring in place., repair and/or replace

    Dec 28, 2023 · Penalty $625

    Active
  • Class - 2

    At the time of my inspection of a active 24 story facade restoration construction site i observed hoist systems installed on the sidewalk shed and on pipe scaffold at expo 1,2 and 4. after requesting manufactur

    Oct 28, 2022

    Resolve
  • Class - 1

    Bc3314.8.2 debris netting-supported scf inadequate ato my insp on closed&permitted jobsite,i observed supported scf system installed@exp1,2 on rooftop of sws to rooftop level of bldg.during insp it was also obs

    Oct 20, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to have onsite documents required by bc chapter 33.noted at time of inspection upon requst of approved documents,sws inspection letter and impost loud letter.none of them was provided.active site with q

    Aug 3, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    3307.4.3 failure to comply with dot regulations.noted at time of inspection i observed onsite of 80 central park west,roadway in use for construction materials and equipment.upon request for dot permits,all of

    Aug 3, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to safeguard persons and property(sws corner of exp 2 and 3). at time of my inspection of this 24 story major building i observed atexp 2 near exp 3 two parapet clamps installed at the roof on the parap

    May 4, 2021 · Penalty $5,000

    Resolve
Show 18 more ↓
  • Class - 2

    Work does not conform to approved construction documents or amendments.noted at the time of my inspection that the work on roof was contrary to approved cd5 sr-/0455 and the chook drawings provided at time of

    Mar 26, 2021

    Resolve
  • Class - 2

    Failure to maintain/display onsite documents required by bc chapter 33noted at the time of my inspection it was observed that parapet wall was utilized in connection of suspended scaffold where upon request of

    Mar 26, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    3314.4.3.2.inadequate installation for suspended scaffold.noted:at thetime of my inspection where chook suspended scaffold was installed at exp4 and installation center from riconda maintenance was provided.i o

    Mar 26, 2021

    Resolve
  • Class - 1

    At time of inspection of active jobsite i observed a supported scaffold and sidewalk shed at exp#1 and exp#2.at the south exposure i observed a approx 15' sped with supported scaffold upon 54x77 junior beams th

    Sep 15, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3303.10 tenant protection plan(notice to occupants). at the time ofinspection i observed an occupied building of 25 stories w/ exterior work taking place. failure to provide tpp fails to notify tenants from

    Oct 23, 2019

    Resolve
  • Class - 1

    Sec. 3314 supported scaffold does not meet dob specifications -supported scaffold missing end rails -ripped netting -misc planks -foreman onsite -men on supported scaffold doing demo work. remedy: comply w/code

    Feb 12, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3314.4 upon completion of the installation of the scaffold,an inspection report verfying that the scaffold has been installed in accordance w/the design drawing. -men on supported scaffold doing demo,no

    Feb 12, 2013

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments -material hoist set-up in wrong location on roof -using screw jacks to join 2 sections of pipe frame together. remedy: conform to

    Feb 12, 2013

    Resolve
  • Hazardous

    1009-operation of hoisting equipment in a unsafe manner:(a)3 cable clamps used on 5/16" wire rope 3 required (b)life lines nottied back indepentendly(c)bin 27-20 outerigger not ser up to approved plans bir 26-

    Nov 12, 2003 · Penalty $5,000

    Resolve
  • Hazardous

    Using a two point scaffold without a riggers licence

    Nov 12, 2003 · Penalty $500

    Active
  • Non-hazardous

    59b02 replace counter weight spring.

    Dec 12, 2000

    Resolve
  • Non-hazardous

    9h12,11q3,15m7,16h12,48b15. -15 floor #s in hoistway, -16 sb,2,3,4,6,712,17,20,22 & 25 floors

    Apr 8, 1999

    Resolve
  • Non-hazardous

    21l11,50t16,15m7. -21 hall indicators, -15 floor # in hoistway

    Apr 5, 1999

    Resolve
  • Non-hazardous

    9h12,15m7,16h12,21l11,40l11,50t16. -15 floor # in hoistway, -16 1,9 & 25th fls., -21 hall indicators, -40 tension sheave

    Apr 5, 1999

    Resolve
  • Non-hazardous

    Work without a permit.work noted:approx 300 area under construction includes excavaton,removal of concrete and replacing concrete with no bldg dept.const.permit.location:east/south corner of bldg.remedy:stop

    Dec 27, 1995

    Resolve
  • Non-hazardous

    Faiure to provide contractor's sign at construction site.construction approx.300 of removal concrete and excavation.location:east/south of bldg.remedy:provide contractor's sign.

    Dec 27, 1995

    Resolve
  • Hazardous

    Sidewalk shed does not meet building code speafication, in that some side deck enclosures are missing. remedy: furnish & install all required side enclosures.

    Apr 18, 1994 · Penalty $5,000

    Resolve
  • Non-hazardous

    Work without permits-at time of inspection on the 12 fl. south portion and penthouse plumbing work has comensed without first obtaining permit for the plumbing portion of work. remedy: stop all work plumbing ob

    Jul 24, 1992

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jun 17, 2019 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2018 · Apt 4C

    Close
  • Door/window

    Door

    Jan 22, 2016 · Apt 24G

    Close
  • Unsanitary condition

    Pests

    Apr 15, 2015 · Apt 5BC

    Close
  • Heat/hot water

    Entire building

    Apr 27, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2014 · Apt 22F

    Close
  • Heating

    Heat related

    Oct 7, 2011 · Apt 22F

    Close
  • Heating

    Heat related

    Oct 15, 2009 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Jun 25, 2008 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Jun 25, 2008 · Apt 4C

    Close
Show 28 more ↓
  • Paint/plaster

    Wall

    Jun 25, 2008 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Jun 25, 2008 · Apt 4C

    Close
  • Plumbing

    Toilet

    Jun 25, 2008 · Apt 4C

    Close
  • General

    Mold

    Jun 25, 2008 · Apt 4C

    Close
  • General

    Cabinet

    Aug 8, 2007 · Apt 4C

    Close
  • General

    Mold

    Aug 8, 2007 · Apt 4C

    Close
  • General

    Mold

    Aug 8, 2007 · Apt 4C

    Close
  • Plumbing

    Basin/sink

    Aug 8, 2007 · Apt 4C

    Close
  • Plumbing

    Toilet

    Aug 8, 2007 · Apt 4C

    Close
  • General

    Mold

    Aug 8, 2007 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Aug 8, 2007 · Apt 4C

    Close
  • Plumbing

    Shower-stall

    Aug 8, 2007 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Aug 8, 2007 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Aug 8, 2007 · Apt 4C

    Close
  • Plumbing

    Basin/sink

    Jun 1, 2007 · Apt 4C

    Close
  • Plumbing

    Toilet

    Jun 1, 2007 · Apt 4C

    Close
  • General

    Mold

    Jun 1, 2007 · Apt 4C

    Close
  • General

    Mold

    Jun 1, 2007 · Apt 4C

    Close
  • Plumbing

    Shower-stall

    Jun 1, 2007 · Apt 4C

    Close
  • Heating

    Heat related

    May 8, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    May 7, 2005 · Apt 1

    Close
  • Heating

    Heat related

    May 7, 2005 · Apt BLDG

    Close
  • Heating

    Heat related

    May 6, 2005 · Apt 22F

    Close
  • Heating

    Heat related

    May 6, 2005 · Apt 22F

    Close
  • Heating

    Heat related

    Apr 25, 2005 · Apt 22F

    Close
  • Paint/plaster

    Wall

    Apr 7, 2003 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Apr 7, 2003 · Apt 4C

    Close
  • General

    Mold

    Apr 7, 2003 · Apt 4C

    Close

Sales history

DatePriceTypeUnits
Aug 3, 2026$489,000Coops - elevator apartments—
Apr 17, 2026Non-market transferCoops - elevator apartments—
Mar 16, 2026$580,000Coops - elevator apartments—
Oct 16, 2025$1,900,000Coops - elevator apartments—
Oct 7, 2025Non-market transferCoops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1967
Floors
24
Residential units
165
Building area
225,552 ft²
Lot area
15,002 ft²
Zoning
R10A
Community board
107
Council district
6
Block / lot
1121 / 29
Assessed value
$29,321,100
Landmark / historic district
Upper West Side / Central Park West Historic District

HPD registration #138879, last renewed Sep 17, 2025.

Questions about 80 Central Park West

Who owns 80 Central Park West?

The owner of record in NYC Department of City Planning PLUTO data is 80 Cpw Apt Corp.

Does 80 Central Park West have violations?

Yes. NYC HPD has recorded 18 housing violations at this property.

Is 80 Central Park West rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 80 Central Park West built?

City records list 1967 as the year it was built.

How many apartments are in 80 Central Park West?

It has 165 residential units and 168 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.