639 11 Avenue
Manhattan, NY 10036BBL 1-01094-0036Map
Owner of record: Samruve Holding De LLC
639 11 Avenue is an office building built in 2016 in Manhattan, 10036. The owner of record is Samruve Holding De LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 20
- ECB violations
- 13
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 20
- Construction other optional
Failure to maintain building in a code compliant manner.exposure#1west elevation crack window sill at 3rd&4th floor exp#2 north elev.hairline stone crack 10th floor.exp#4south elev.crack stone open joint&metal corrisions at 1st floor.open joint exist at exposure#1and exposure#2 remedy:maintain building repair and or replace
Dec 12, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed
Show 10 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 25, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 25, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 25, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 25, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Oct 17, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 17, 2008
Dob violation - dismissed
ECB violations · 13
- Class - 2
Sec: bc 3301.7. failure to provide pe approved design drawings. as noted: @ time of insp @ an active job site observed @ exp#3, 5th flr a pipestage scaffold 2 stage high w/ outriggers protruding outside for wor
May 24, 2017
Resolve - Class - 1
Sec: bc 3307.8. failure to provide standard guardrails. as noted: @ time of insp @ active job site observed @ 6th flr missing guardrails around opening @ 6th glr slab, failure to provide guardrails. rem: confor
May 24, 2017 · Penalty $1,600
Resolve - Class - 2
Log. note: at the time of my inspection of a 5 sty bldg at 2nd fl level,construction work in progress. upon request for logs from construction superintendent on site none was provided. remedy: provide & maintai
Feb 25, 2017
Resolve - Class - 1
Construction superintendent fail to perform duties as per rule. the following hazardous conditions were observed & stop work order was issued to this construction site on this date. 1)failed to provide sidewalk
Feb 25, 2017 · Penalty $10,000
Resolve - Class - 1
Sidewalk shed where required. note: at the time of my inspection of a 5 sty bldg at 2nd fl level approx 25 feet in height,construction work in progress. i observed that there were no sidewalk shed provided as
Feb 25, 2017 · Penalty $4,800
Resolve - Class - 1
Sec. 3309.10 protection of rppf. note: at the time of my inspection ofa 5 sty bldg at 2nd fl level,approx 7feet above adjacent property roofat exp#3,construction work in progress. i observed that there were no
Feb 25, 2017 · Penalty $1,600
Resolve - Class - 2
Electrical work w/o a permit. note: at the time of my inspection of a 5 sty bldg at 2nd fl level,construction work in progress. i observed temporary electrical panel box erected at cellar level on exp#1 wall su
Feb 25, 2017 · Penalty $400
Resolve - Class - 1
Failure to institute & maintain safety equipment measures & temporary construction-no guardrails. note: at the time of my inspection of a 5 sty bldg at 2nd fl level,construction worj in progress. i observed tha
Feb 25, 2017 · Penalty $1,200
Resolve - Class - 1
Sec. 3303.9 failure to maintain required means of egress. note: at thetime of my inspection of a 5 sty bldg at 2nd fl level approx 18feet to2nd fl level,construction work in progress. i observed that means of
Feb 25, 2017 · Penalty $1,600
Resolve - Class - 2
Bc 28-104.7 submittal of consy docs as noted:@time of insp on an active const site observed general contractor forming & erecting rebar for footing along exp#1,3 & 4.pe approved const drawing fo-100.01 & sectio
Jul 1, 2016
Resolve
Show 3 more ↓
- Class - 1
Failure to provide required notification prior to the commencement of demo.note @ the time of inspection for demo signoff,i observed bldg demolished;upon verifying in bis for date of demo commencement no date o
Dec 30, 2015 · Penalty $6,000
Resolve - Hazardous
Failure to provide 8'-0" high solid fence where required during exca- vation operations permit #101967640-ew 07 was issued on 01-11-99. no permit was issued for required fence. remedy: comply with code requir-
Apr 7, 1999 · Penalty $480
Resolve - Non-hazardous
Plumbing work without a permit. noted: gasoline tanks installed in ex-cavation and all related plumbng line installed application #101967640-pl was file on 01-11-99. no permit has been issued. remedy: obtain
Mar 25, 1999 · Penalty $800
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O5)
- Year built
- 2016
- Floors
- 5
- Residential units
- —
- Building area
- 29,998 ft²
- Lot area
- 5,042 ft²
- Zoning
- M2-4
- Community board
- 104
- Council district
- 3
- Block / lot
- 1094 / 36
- Assessed value
- $5,825,700
- Landmark / historic district
- No
Questions about 639 11 Avenue
Who owns 639 11 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Samruve Holding De LLC.
Does 639 11 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 639 11 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 639 11 Avenue built?
City records list 2016 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.