534 West 58 Street
Manhattan, NY 10019BBL 1-01086-0050Map
Owner of record: Rnmb West 58 LLC
534 West 58 Street is a hotel built in 2014 in Manhattan, 10019. The owner of record is Rnmb West 58 LLC. HPD has recorded 2 housing violations here, most recently on March 31, 2023.
- HPD violations
- 2
- DOB violations
- 35
- ECB violations
- 19
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2021
Dob violation - resolved
Show 25 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 21, 2016
Vp*-violation unserved ecb- dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 8, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2004
Dob violation - resolved - Elevator elevatorrequired
1p6616
Jan 4, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 1992
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(50) provide access so a compleye inspection can be made by a member of this department
Nov 26, 1988
Dob violation - resolved
ECB violations · 19
- Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #917446.remedy:submit acceptable required te
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Sec. 3307.6.5.11 the permit holder for the shed sahll notify the dept no more then 2 business days following the complte removal of the sidewalk shed. noted: at time of inspection permit#140085636 was signed of
Aug 16, 2017
Resolve - Class - 1
Sec. 28-105.12.5 work w/o permit w/o a(variance). noted: work on going tile,electrical carpentry throughout w/o a variance @ time of inspection. remedy: stop all work. obtain variance permit.
Oct 1, 2016 · Penalty $800
Resolve - Class - 1
Sec: bc3307.7.7. failure to maintain fence: @ time of insp of new bldg under constr i observed @ exp#1 a constr fence assembly made of chainlink over plastic barriers on the roadway the fence is not sound as it
Jun 21, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to have site safety manager present on site as required during constr operations. on the date noted above i performed an insp of the new bldg under constr. @ time of my arrival for insp the site safety
Jun 21, 2016 · Penalty $1,200
Resolve - Class - 2
Sec. 28-104.7 submittal of construction documents. as noted: at time of inspection on an active construction site observed moment connections w/moment plates bent & deformed. welds to be not perpendicular & non
Mar 24, 2015 · Penalty $400
Resolve - Class - 2
Failure to provide special inspection of concrete placement tr1.as noted: at time of inspeciton on an active construction site observed concrete placement on floor #10.failure to provide a special inspection fo
Mar 11, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to perform proper concrete washout procedures at site collections and containment.as noted of time of inspections on an active construction site concrete placement at 10th floor slab concrete.mixer truc
Mar 11, 2015 · Penalty $1,200
Resolve - Class - 1
Bc3301.2 failure to cover holes and institute maintain safety equipment measure of temporary construction as noted at time of inspection on an active construction site steel bldg on 10th flr observed concrete
Mar 11, 2015 · Penalty $8,000
Resolve - Class - 1
Failure to safeguard man not tied off nb in progress.steel work/decking in progress i observed worker on the 4 flr on leading edge of steel.the worker had no harness & was not tied off.immediate hazard workers
Jan 7, 2015 · Penalty $1,030
Resolve
Show 9 more ↓
- Class - 2
Bc 3313.1 combustible liquid-not stored properly.@time of insp i observed active steel job in progress.4flr out of the ground.i observed 2gas cans being stored under/inside & make shift work bench.the work benc
Jan 7, 2015 · Penalty $830
Resolve - Class - 2
Bc3303.7.2 failure to have adequate fire extinguisher as per code.at time of inspection active job site tack welding in progress at 2nd flr observed no fire extinguisher installed 1st and 2nd flr; as stated in
Nov 10, 2014 · Penalty $830
Resolve - Class - 1
3304.7 safe means of ingress & egress.@ time of inspection observed active jobsite excavation in progress.excavated area approx 15ft deep.noingress/egress has been provided as required.approx 8 workers located
Jun 24, 2014 · Penalty $1,600
Resolve - Class - 1
3304.4.4 guardrails required.@ time of inspection observed active jobsite excavation in progress.excavated area is approx.15ft deep.proper guardrail system is not provided to prevent falls.approx.20ft of guardr
Jun 24, 2014 · Penalty $400
Resolve - Class - 2
3304.8 all excavations shall be drained.@ time of inspection observed active jobsite,excavation in progress.area of approx. 10ft w by 6ft & 1ft deep has standing water present standing water.rem:remove/maintain
Jun 24, 2014
Resolve - Hazardous
Failure to maintain bldg (hazardous) noted:2 story commercial space with one story set bach.had part of ceiling collapse.location of defective ceiling in south east corner of set bach,wooden means noted.ceiling
May 30, 2001 · Penalty $800
Resolve - Non-hazardous
Failure to provide emergency power exit lights on all floors. failure to provide emergency power to exit directional signs at exits on all floors. remedy: provide emergency power exit light & directional signs
Jun 8, 1999
Resolve - Non-hazardous
15a,50f. 15 remove tenant locks.
Oct 26, 1992 · Penalty $200
Resolve - Hazardous
Failure to maintain exterior building wall defects is a vertical crackat front of building brick work defective at 1 stroy east side of door area. remedy make all repairs forthwith
Nov 14, 1988 · Penalty $500
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 30, 2014 · Apt 5
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Nov 6, 2025 | Non-market transfer | Luxury hotels | 1 |
Building details
- Building type
- Hotel (H2)
- Year built
- 2014
- Floors
- 18
- Residential units
- —
- Building area
- 67,511 ft²
- Lot area
- 10,042 ft²
- Zoning
- M1-5
- Community board
- 104
- Council district
- 6
- Block / lot
- 1086 / 50
- Assessed value
- $13,308,750
- Landmark / historic district
- No
HPD registration #144707, last renewed Aug 1, 2025.
Questions about 534 West 58 Street
Who owns 534 West 58 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rnmb West 58 LLC.
Does 534 West 58 Street have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 534 West 58 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 534 West 58 Street built?
City records list 2014 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.