549 West 52 Street
Manhattan, NY 10019BBL 1-01081-0080Map
Owner of record: NYC Housing Preservation And Development
549 West 52 Street is a theatre built in 1930 in Manhattan, 10019. The owner of record is NYC Housing Preservation And Development. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 16
- ECB violations
- 32
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Borough commissioner has ordered all work stopped under application#123190590-ewo due to contractor withdrawal.
Jun 15, 2022
Dob violation - active - Construction other optional
Borough commissioner has ordered all work stopped under application#123190590-ewo due to contractor withdrawal.
Jun 15, 2022
Dob violation - active - Construction other optional
Borough commissioner issued stop work order to application #123190590 due to site safety coordinator withdrawal. no access to area of work estimate work at 50% stop all work immediately and make site safe.
Jan 13, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 26, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 26, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 26, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 26, 2016
Vp*-violation unserved ecb- dismissed
ECB violations · 32
- Class - 2
Bc3301.6 design sizes and capacity of material structures temporary construction and equipment.at time of inspection of 10 story partially occupied building under alteration observed needle beams in place at ex
Mar 7, 2022
Resolve - Class - 1
Bc3303.12 elevator or hoist not readiness.at time of inspection of 10 story partially occupied building under alteration in response to above compliant elevator out of order observed elevator out of service.suc
Mar 7, 2022 · Penalty $2,500
Resolve - Class - 1
No site safety plan on site.note:at time of my inspection on an alt 2 work in progress that required for a site safety plan to be on site upon request to ge pm & site safety manager none was provided what was
May 7, 2021
Resolve - Class - 2
Bc3314.4.1.5.notification of adjuatable suspended scaffold installation & removal. note: @ time of insp. of a 24 story bldg @ bulkhead levelconst. work in progress. i observed a multi point suspended scaffold b
Aug 15, 2017
Resolve - Class - 2
Wokr does not conform to approved construction documents &/or approvedamendments. job#121185626 on an energey audit inspection;at time of inspection i observed at the north tower mechanical room installed two b
Nov 28, 2016 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents or approved amendments. at time of inspection noted a delivery ramp w/overhead protection @ exp#1 dot 2 lane closure when looking at plans for site safet
May 5, 2016
Resolve - Class - 1
Sec. 3303.8.2 fire dept connection shall be kept fire from obstructions. at time of inspection noted at 7th fl level of job site & 1st fl level of job site tha the standpipe was obstructed w/materials and compo
May 5, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.6.1 design drawing. at time of inspection noted @ interior court yard hanging scaffold a planked pipe scaffold on 2 floors extending onto the hanging scaffold no design drawing was provided at time of
May 5, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3301.2 failure to safeguard person and property affected by construction operations. at time of inspection noted at expo#4 of jobsite north and south tower bldgs adjoining property overhead protection on terr
Apr 13, 2016 · Penalty $1,200
Resolve - Class - 1
Bc3307.2.1 obstruction of streets or sidewalks.at time inspection not ed that at exp#3,4 adjoining property sidewalk was being used to stageeqiupment obstructing the sidewalk and exposing the public to potentia
Apr 13, 2016
Resolve
Show 22 more ↓
- Class - 1
Bc3307.2.1 obstruction of streets on sidewalks.at time of inspection noted at exps#3 of jobsite street partially closed beyond the area permitted by dot outside the delivery area causing traffic to stop while
Apr 13, 2016
Resolve - Class - 1
Bc3308.5 vertical netting system vertical netting system is to be installed and maintained to cover all unenclosed perimeters. at time of inspection note at all exposures of bldg north and south that the vert
Apr 13, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard persons and property affected by construction operations. at time of inspection noteda at exp#2 northwest corner of bldg #2 north bldg work ongoing cmu while no horizontal netting extended
Apr 13, 2016 · Penalty $2,400
Resolve - Class - 2
I observed smoking refuse at the construction site.at the time of my inspection,construction work in progress,i observed smoking refuse at the construction site,i observed cigarette butts and empty boxes thru
Mar 7, 2016 · Penalty $1,200
Resolve - Class - 1
Bc3306.9.3 failure to provide dust control as required.at time of my inspection,construction work in progress.i observed a worker using a draft grinder to sand the concrete slab producing cloud of dust.no dus
Mar 7, 2016 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations. at the time of my inspection construction work in progress. i observed concrete debris beyond the orange netting on the edge of
Mar 7, 2016 · Penalty $1,200
Resolve - Class - 1
Bc3305.3.6.1.2 failure to secure reshores less than 10'away from the edge of the open building structure.at the time of my inspection construction work in progress at the south and north tower of bldg under con
Mar 7, 2016 · Penalty $1,600
Resolve - Class - 2
Collection and containment note:at the time of my inspection construction work in progress of a 24th story building at 7th floor level.i observed concrete washout being performed in a makeshift plywood with met
Jan 26, 2016
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.note:at the time of my inspection of a 24 story building at7th floor level(s.t) and 5th floor level(n.t)i observed that there wer
Jan 26, 2016 · Penalty $2,400
Resolve - Class - 1
3308.6.1.1 horizontal safety netting system note:at the time of my inspection of a 24 story building up to the 7th floor level on south tower approximately 73 feet.i observed that there were no horizontal netti
Jan 26, 2016 · Penalty $1,600
Resolve - Class - 2
3303.11 stairs during construction note:at the time of my inspection of a 24 story building up to the 5th floor level on north tower approximately 45 feet in height.i observed that workers were accessing workin
Jan 26, 2016
Resolve - Class - 1
Sec. 3301.1.1 resposibility for safety. noted: at the time of my inspection i observed workers performing work at the bldgs edge,that did not have guardrails in place. those workers did not have the required
Jan 22, 2016 · Penalty $1,200
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:observed sidewalk shed erected at exp#1 (west 52nd street) sidewalk shed lightsare not operating at time of inspection 6:45am that does not meet code
Dec 31, 2015
Resolve - Class - 1
Inadequate vertical netting/guardrail system .note:at the time of my inspection construction work in progress of a 24 story building at 4th floor level,i observed that there were no guardrail system and inadequ
Dec 21, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons and public affected by construction operations:note:at the time of my inspection construction work in progress of a 24 story building at 4th floor level.i observed no overhead p
Dec 21, 2015 · Penalty $2,400
Resolve - Class - 1
Bc 3301.1.1 responsibility for safety.note:at the time of my inspection of a 24 story building up to the 4th floor level construction work in progress.i observed approximately 10 workers working on forming deck
Dec 21, 2015 · Penalty $1,600
Resolve - Class - 2
Smoking at construction/demolition site.smoking refuse.evidence observed.note:at the time of my inspection of construction of a 24 story building at 4th floor level,i observed cigarette butts on the working flo
Dec 21, 2015
Resolve - Class - 2
Bc 3307.2.1 obstruction of street s or sidewalk.note:at the time of myinspection of a 24 story building at 4th floor level construction workin progress.i observed materials for construction operation that consi
Dec 21, 2015
Resolve - Class - 1
Bc 3301.7 design.note:at the time of my inspection of a 24 story building at 4th floor level, construction work in progress.i observed safetty embedded straps installed and being used for fall protection.upon r
Dec 21, 2015 · Penalty $1,600
Resolve - Class - 1
3310.5.1 notification to the department of the primary manager or coordinator.note:at the time of my inspection of a s stry building at s.o.e foundation stage.review of site safety logs reveal that site safety
Sep 14, 2015 · Penalty $400
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rule and regulations
May 10, 2010 · Penalty $800
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order noted: all equipment has been removed remedy:comply with stop work order
Dec 22, 2008 · Penalty $24,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Theatre (J5)
- Year built
- 1930
- Floors
- 10
- Residential units
- —
- Building area
- 52,600 ft²
- Lot area
- 12,552 ft²
- Zoning
- R9
- Community board
- 104
- Council district
- 3
- Block / lot
- 1081 / 80
- Assessed value
- $9,887,850
- Landmark / historic district
- No
Questions about 549 West 52 Street
Who owns 549 West 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Preservation And Development.
Does 549 West 52 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 549 West 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 549 West 52 Street built?
City records list 1930 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.