646 10 Avenue
Manhattan, NY 10036BBL 1-01055-0063Map
Owner of record: 646 Tenth Avenue, ,
646 10 Avenue is a walk-up apartment building built in 1960 in Manhattan, 10036. It has 17 residential units across 6 floors. The owner of record is 646 Tenth Avenue, ,. HPD has recorded 34 housing violations here, most recently on July 1, 2026. 5 of the 34 most recent violations are still open.
- HPD violations
- 34
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 88
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 34
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jul 1, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jul 1, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jul 1, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jul 1, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration partion wall erected from floor to ceiling of drywall and wood construction and door creating room with window in the 3rd room from north at west located at apt 5b, 5th story, 1st apartment from west at north
Jul 1, 2026 · Apt 5B
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 4th story balcony fire escape at building front
Jul 17, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at compactor closet, 1st story
Sep 5, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at compactor closet, 1st story
Sep 5, 2023
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower window sash in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Jul 27, 2023 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook eye installed at building entrance door , 1st story
Jul 27, 2023
Closed — Violation closed
Show 24 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south and east wall in the 2nd bathroom from north located at apt 3c, 3rd story, 1st apartment from south at west
Nov 18, 2022 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ventilation system at ceiling in the kitchen located at apt 3c, 4th story, 1st apartment from north at east
Jun 24, 2022 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 3c, 4th story, 1st apartment from north at east
Jun 24, 2022 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to fire stair at public hall, 4th story
Jun 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective to fire stair at south wall at public hall, 3rd story
Jun 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to north stair at public hall, 2nd story
Jun 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective leading to basement (east 2) at public hall, 1st story
Jun 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at east 1 recycling room at public hall, 1st story
Jun 24, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 5th story, 1st apartment from east at south
Mar 8, 2022 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 8, 2022
Closed — Violation dismissed - CImmediately hazardous
Code: replace or repair the self-closing the doors that is missing or defective ... in the entrance located at apt 4a, 5th story, 1st apartment from east at south
Mar 8, 2022 · Apt 4A
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 28, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Nov 28, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 28, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. at front areaway
Sep 21, 2017
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Oct 28, 2015 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Oct 28, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Dec 1, 2014 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Dec 1, 2014 · Apt 1B
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 30, 1992
Dob violation - dismissed
ECB violations · 5
- Class - 1
At time of inspection observed large amounts of debris scattered throughout main entrance to commercial space first floor creating a hazard for injury and rodent infestation. one of the workers informed me that
Aug 26, 2024 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used for other than residential purposes.cofo#103483259 indicates premies to be legally approved as a class"a"mutliple dwelling.illegal occupancy noted at apt3b at 4th floor has been converte
May 19, 2022 · Penalty $1,250
Resolve - Class - 1
907.2.8 failure to provide fire alarm system for transient use at apt3b.remedy:discontinue illegal occupancy.
May 19, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of requiredmeans of egress for every floor per bc1018.1(2008 code)27-366;bc1021.1(2014 code)for transient use at apt3b.remedy:discontinue illegal occup
May 19, 2022 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit. noted : demolished a one - story structure to ground remedy : obtain all approvals and permit
Apr 9, 2004
Resolve
Complaints
- Appliance
Refrigerator
Jun 28, 2026 · Apt 5B
Close - Door/window
Door
Jun 28, 2026 · Apt 5B
Close - Door/window
Door
Jun 28, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jul 16, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 1, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Oct 30, 2023 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Aug 15, 2023 · Apt BLDG
Close - Door/window
Window pane
Jul 2, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2022 · Apt 3A
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt BLDG
Close - General
Bell/buzzer/intercom
May 28, 2022 · Apt LOBBY
Close - Electric
No lighting
May 26, 2022 · Apt 3C
Close - General
Ventilation system
May 26, 2022 · Apt 3C
Close - Heat/hot water
Apartment only
Mar 11, 2022 · Apt 4A
Close - Heat/hot water
Apartment only
Mar 5, 2022 · Apt 4A
Close - Unsanitary condition
Mold
Nov 23, 2021 · Apt 3C
Close - Water leak
Damp spot
Nov 23, 2021 · Apt 3C
Close - Paint/plaster
Ceiling
Nov 23, 2021 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 23, 2021 · Apt 3C
Close - Heat/hot water
Apartment only
Mar 16, 2021 · Apt 3A
Close - Plumbing
Water supply
Feb 25, 2021 · Apt 3A
Close - Heat/hot water
Entire building
Nov 23, 2020 · Apt 3C
Close - Heat/hot water
Entire building
Dec 6, 2018 · Apt 4B
Close - Heat/hot water
Entire building
Nov 22, 2018 · Apt 4C
Close - Heat/hot water
Apartment only
Nov 22, 2018 · Apt 1D
Close - Heat/hot water
Apartment only
Oct 21, 2018 · Apt 3C
Close - Heat/hot water
Entire building
Oct 21, 2018 · Apt 1D
Close - Heat/hot water
Apartment only
Nov 14, 2017 · Apt 1A
Close - Outside building
Skylight
Jun 12, 2017 · Apt 5B
Close - Heat/hot water
Entire building
Mar 14, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 1, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Dec 1, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Dec 1, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 27, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 23, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Nov 23, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Oct 27, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Oct 27, 2016 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 23, 2016 · Apt 2C
Close - Heat/hot water
Entire building
Jan 6, 2016 · Apt 1B
Close - Paint/plaster
Ceiling
Jan 6, 2016 · Apt 1D
Close - Door/window
Door
Jan 6, 2016 · Apt 1D
Close - Paint/plaster
Ceiling
Jan 6, 2016 · Apt 1D
Close - Water leak
Slow leak
Jan 5, 2016 · Apt 3C
Close - Electric
Lighting
Dec 25, 2015 · Apt 1D
Close - Unsanitary condition
Sewage
Dec 25, 2015 · Apt 1D
Close - Unsanitary condition
Sewage
Dec 25, 2015 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1960
- Floors
- 6
- Residential units
- 17
- Building area
- 12,023 ft²
- Lot area
- 2,815 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 3
- Block / lot
- 1055 / 63
- Assessed value
- $2,280,600
- Landmark / historic district
- No
HPD registration #142584, last renewed Jul 14, 2026.
Questions about 646 10 Avenue
Who owns 646 10 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 646 Tenth Avenue, ,.
Does 646 10 Avenue have violations?
Yes. NYC HPD has recorded 34 housing violations at this property.
Is 646 10 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 646 10 Avenue built?
City records list 1960 as the year it was built.
How many apartments are in 646 10 Avenue?
It has 17 residential units and 19 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.