359 West 52 Street
Manhattan, NY 10019BBL 1-01043-0009Map
Owner of record: 113 East 184th Street Realty LLC
359 West 52 Street is a mixed residential and retail building built in 1920 in Manhattan, 10019. It has 3 residential units across 4 floors. The owner of record is 113 East 184th Street Realty LLC. HPD has recorded 73 housing violations here, most recently on April 29, 2026. 41 of the 50 most recent violations are still open.
- HPD violations
- 73
- DOB violations
- 10
- ECB violations
- 3
- HPD complaints
- 68
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 25, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at all hot water fixtures throughout in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Mar 5, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Mar 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling in vestibule , 1st story
Mar 5, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling & west wall in vestibule hallway , 1st story
Mar 5, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall , 1st story
Mar 5, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall , 1st story
Mar 5, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Feb 26, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at cieling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Feb 26, 2026 · Apt 2
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bicycle at public hall, 4th story
Feb 26, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at cieling and west wall at vestibule , 1st story
Feb 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective transom at vestibule door , 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Feb 26, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the cieling and west wall at vestibule , 1st story
Feb 26, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 13, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Feb 13, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Dec 31, 2025 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Dec 31, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from west at north
Dec 31, 2025 · Apt 4
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 4th story, 1st apartment from west at north
Dec 31, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 7, 2025 · Apt 2
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 7, 2025 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Dec 7, 2025 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 5, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 5, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 4th story, 1st apartment from west at north
Aug 3, 2025 · Apt 4
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 3, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 3, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 3, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 3, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Sep 5, 2024 · Apt 2
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective latch at lower sash window at north wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Sep 5, 2024 · Apt 2
Open — Nov sent out
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Dec 27, 1988
Dob violation - dismissed
ECB violations · 3
- Class - 1
Work without a permit. work noted: at 1st floor erected full height partition walls creating 6 rooms(5 massage rooms and 1 shower room). installed waste/water plumbing lines creating 1 shower room and 1 toilet
Jul 17, 2025 · Penalty $2,500
Active - Class - 2
Illegal use in a residential district. unlicensed physical treatment establishment, a prohibited use per zr 12-10, operating in a r8(zoning district) on ground floor. noted: a masseuse offered to perform a full
Jul 17, 2025
Resolve - Class - 1
Occupancy contrary to that allowed by the department of buildings records. illegal occupancy noted: at 1st floor level converted/occupied as27 men spa/hk men spa with 5 massage rooms, massage tables, oils, towe
Jul 17, 2025 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Apartment only
Mar 23, 2026 · Apt 2
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Open - Plumbing
Radiator
Mar 3, 2026 · Apt 2
Close - Plumbing
Water supply
Mar 3, 2026 · Apt 2
Close - Safety
Smoke detector
Mar 3, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 2
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 2
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 29, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 2
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt 2
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt 4
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt 4
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt 4
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt BLDG
Close - Plumbing
Water supply
Nov 25, 2025 · Apt 4
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 4
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt 4
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2025 · Apt 2
Close - Heat/hot water
Entire building
Sep 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 26, 2025 · Apt 3
Close - Heat/hot water
Entire building
Aug 4, 2025 · Apt 2
Close - Heat/hot water
Entire building
Aug 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 31, 2025 · Apt 4
Close - Heat/hot water
Entire building
Jun 28, 2025 · Apt 3
Close - Heat/hot water
Apartment only
Jun 7, 2025 · Apt 3
Close - Heat/hot water
Entire building
Apr 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S3)
- Year built
- 1920
- Floors
- 4
- Residential units
- 3
- Building area
- 4,750 ft²
- Lot area
- 1,883 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 3
- Block / lot
- 1043 / 9
- Assessed value
- $1,434,600
- Landmark / historic district
- No
HPD registration #119233, last renewed Mar 25, 2026.
Questions about 359 West 52 Street
Who owns 359 West 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 113 East 184th Street Realty LLC.
Does 359 West 52 Street have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 359 West 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 359 West 52 Street built?
City records list 1920 as the year it was built.
How many apartments are in 359 West 52 Street?
It has 3 residential units and 4 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.