370 West 52 Street
Manhattan, NY 10019BBL 1-01042-0061Map
Owner of record: 370 Operating LLC
370 West 52 Street is a walk-up apartment building built in 1910 in Manhattan, 10019. It has 15 residential units across 4 floors. The owner of record is 370 Operating LLC. HPD has recorded 151 housing violations here, most recently on October 3, 2026. 37 of the 50 most recent violations are still open.
- HPD violations
- 151
- DOB violations
- 59
- ECB violations
- 17
- HPD complaints
- 162
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 151
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at west wall in the 2nd room from north located at apt 3d, 3rd story, 1st apartment from west at north
Oct 3, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 1st story
Oct 3, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and all walls at public hall stairs, 1st story
Oct 3, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance door at public hall, 1st story
Sep 11, 2026
Open — Invalid certification - BHazardous
Provide operable handle at bulkhead door exterior to allow ingress from roof to bulkhead stairs , section ''west''
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall stairs, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling and north wall at public hall stairs, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and north wall at public hall stairs, 1st story, section ''east''
Sep 11, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 5, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the 2nd room from north at east located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Sep 5, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Sep 5, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Sep 5, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at north ceiling at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at north ceiling at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at east wall north wall and ceiling in the 1st room from east at south located at apt 3c, 3rd story, 1st apartment from north at east
Sep 2, 2026 · Apt 3C
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from north at east
Sep 2, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Sep 2, 2026 · Apt 3C
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Sep 2, 2026 · Apt 3C
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Sep 2, 2026 · Apt 3C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north ceiling at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jan 19, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Jan 19, 2026 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Nov 21, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south , section ''west''
Nov 21, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at east wall at public hall, 1st story
Nov 21, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and door in the entrance located at apt 4e, 4th story, 1st apartment from north at east , section at east
Sep 29, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 2e, 2nd story, 1st apartment from north at east , section at east
Sep 29, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with 2 x 1/2 inch iron bar extending across and secured to 2 brackets, the broken or defective angle iron or bar at foot of gooseneck ladder, section at west
Sep 29, 2025
Closed — Violation closed - BHazardous
Provide operable handle at exterior of west door at bulkhead to allow ingress from roof to bulkhead landing
Sep 29, 2025
Closed — Violation dismissed - BHazardous
Provide operable handle at exterior of east door at bulkhead to allow ingress from roof to bulkhead landing
Sep 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and door in the entrance located at apt 3a, 3rd story, 1st apartment from west at north , section at west
Sep 29, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at fire exit from east section to public hall located at public parts, 1st story, section at east
Sep 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 2e, 2nd story, 1st apartment from north at east , section at east
Sep 29, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Properly secure the loose ceramic floor tiles at intermediate landing at public hall stairs, 4th story
Sep 29, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room door at cellar
Jan 27, 2025
Closed — Violation closed
DOB building violations · 59
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active - Emergency none
Install a sidewalk shed 65 feet at (exposure 4) along west 52nd street plus an additional 5 feet to adjacent building on west 52nd street
Apr 1, 2021
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Zoning none
Z-zoning none
Oct 25, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 12, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 29, 1993
Dob violation - active - Construction other optional
C-construction other optional
Mar 29, 1993
Dob violation - dismissed
ECB violations · 17
- Class - 2
Noted at time of inspection minor step cracking was observed along exposure #1 front of property along 52 street at the 3 story window, repair and/or replace
Aug 29, 2026 · Penalty $1,250
Active - Class - 1
At time of inspection, observed on roof rear fire escape gooseneck ladder isn't stable, top rail is welded instead of being bolted. top rung isn't high enough for tenants climbing onto roof. no ladder or rungs
Oct 3, 2025 · Penalty $2,500
Resolve - Class - 2
Permanent dwelling used/converted for other than permenant residentialpurposes dob records indicates premises to be legally approved as class a multiple dwelling noted:apt#3e at the 3rd floor is used/converted
Sep 19, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of automatic sprinklers where required as per bc 903.2 and 27-954 for transient use at apt#3e at the 3rd fl.rem:discontinue illegal occupancy.
Sep 19, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to provide a fire alarm system for transient use at apt#3f at the 3rd floor.rem:discontinue illegal occupancy.
Sep 19, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in code-compliant manner.failure to provide number of required means of egress for every floor per bc 1018.1,1021 and 27-366 for transient use at apt#3e at the 3rd floor.rem:discont
Sep 19, 2025
Resolve - Class - 1
At time of inspection observed fire escape balcony on 4th floor level partially obstructed with planting pot. household stuff at expo # 01 along w 52 street. also observed window a/c units are erected inadequat
Oct 10, 2022 · Penalty $1,250
Resolve - Class - 1
At time of inspection observed a satellite antenna installed on fire escape railing on 4th floor level along 9th ave which partially obstructing emergency exit for the occupant., remove obstruction
Jul 26, 2022 · Penalty $312
Resolve - Class - 1
Failure to maintain bldg in codecompliant manner.atoi noted:facade@8thave side of bldg has areas of missing &/or delaminated masonry sws doesnt provide adequate courage for overhead protection of public comply
Jul 21, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. at time of inspection noted exp#4,8 ave side missing & or delaminated masonry at facade parapet level. no sidewalk shed in place on 8 ave side of bldg risk of
Jun 15, 2021 · Penalty $1,250
Resolve
Show 7 more ↓
- Class - 1
Failure to maintain building in code compliant manner.at time of inspection noted at facade exp #1 and #4 numerous location of cracking in brick and stucco also at parapet missing and in delamanater stucco side
May 1, 2021 · Penalty $3,125
Active - Class - 2
Pedestrian protection does not meet code specifications.note at time of inspection i observed sidewalk shed in place without lighting fixtures in operating condition.remedy:comply with code-provide lighting dus
Apr 13, 2021 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances defect noted:exterior roof parapet concrete stucco spalling,cracked&missing located on w52st side&in danger of concrete falling over pedestrian sidewalk&entranc
Mar 31, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. noted at the time of inspection visible crack at the northeast side of the parapet. also at the 3rd fl step cracks and separation at the lintel on the nort
Mar 8, 2021 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit work noted at 1stfl commercial,lucky's famous(the best burger on earth)(1)demolished north wall at bathroom erected new one to make,handicap accessible larger.(2)demolished wall on the exteror
Jul 17, 2006 · Penalty $250
Active - Non-hazardous
Work without permit. work noted: at front of premises 1st floor. installed a new store front and erected new ceilings (suspended) with electrical work. remedy: obtain permit or restore to prior legal conditions
May 16, 2006
Resolve - Hazardous
Failure to maintain. eroded mortar joints at parapet north and west missing and loose brick at parapet north and west.
Apr 3, 1990 · Penalty $720
Resolve
Complaints
- Unsanitary condition
Mold
Sep 28, 2026 · Apt 3D
Open - Paint/plaster
Wall
Sep 28, 2026 · Apt 3D
Open - Water leak
Heavy flow
Sep 28, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Sep 28, 2026 · Apt 3D
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt 3A
Open - Water leak
Slow leak
Sep 9, 2026 · Apt 4C
Close - Unsanitary condition
Mold
Sep 9, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
Sep 9, 2026 · Apt 4C
Close - Water leak
Damp spot
Sep 9, 2026 · Apt 4C
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 9, 2026 · Apt 4C
Close - Water leak
Heavy flow
Aug 30, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Aug 30, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Aug 30, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Aug 30, 2026 · Apt 2C
Close - Water leak
Heavy flow
Aug 28, 2026 · Apt 3C
Close - Unsanitary condition
Mold
Aug 28, 2026 · Apt 3C
Close - Water leak
Heavy flow
Aug 28, 2026 · Apt 4C
Close - Water leak
Heavy flow
Aug 27, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt APT2C
Close - Water leak
Slow leak
Feb 11, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 14, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt 2E
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Dec 30, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 18, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 2E
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 3B
Close - Line of travel
Line of travel
Sep 30, 2025 · Apt 3A
Close - Line of travel
Line of travel
Sep 30, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Sep 30, 2025 · Apt 2E
Close - Line of travel
Line of travel
Sep 30, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Apr 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Sep 10, 2024 · Apt 2E
Close - Appliance
Electric/gas range
Sep 10, 2024 · Apt 2E
Close - Door/window
Window frame
Sep 10, 2024 · Apt 2E
Close - General
Bell/buzzer/intercom
Sep 10, 2024 · Apt 2E
Close - Electric
Outlet/switch
Sep 10, 2024 · Apt 2E
Close - Door/window
Door
Sep 10, 2024 · Apt 2E
Close - Water leak
Slow leak
Sep 10, 2024 · Apt 2E
Close - Paint/plaster
Ceiling
Sep 10, 2024 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 4
- Residential units
- 15
- Building area
- 9,764 ft²
- Lot area
- 2,510 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 3
- Block / lot
- 1042 / 61
- Assessed value
- $2,182,500
- Landmark / historic district
- No
HPD registration #109176, last renewed Oct 30, 2025.
Questions about 370 West 52 Street
Who owns 370 West 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 370 Operating LLC.
Does 370 West 52 Street have violations?
Yes. NYC HPD has recorded 151 housing violations at this property.
Is 370 West 52 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 370 West 52 Street built?
City records list 1910 as the year it was built.
How many apartments are in 370 West 52 Street?
It has 15 residential units and 17 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.