765 8 Avenue is a hotel built in 1920 in Manhattan, 10036. The owner of record is Eighth Avenue Sky, LLC. HPD has recorded 19 housing violations here, most recently on May 16, 2025.

HPD violations
19
DOB violations
46
ECB violations
60
HPD complaints
8

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 16, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 19

  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    May 16, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jul 14, 2019

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counter balance to window lower sash south wall 3rd sty public hall

    Dec 27, 2002

    Closed — Violation closed
Show 9 more ↓
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceilings all sty's public hall

    Dec 27, 2002

    Closed — Violation closed
  • B

    Replace with new the missing handle to door exterior bulkhead to roof

    Dec 27, 2002

    Closed — Violation closed
  • B

    Replace with new the missing door knob bulk head to roof

    Dec 27, 2002

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors to the boiler room

    Dec 27, 2002

    Closed — Violation closed
  • B

    Replace with new the missing door knob to boiler room in the celler

    Dec 27, 2002

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling located at b-room 204, 3rd story, b-room at west

    Dec 27, 2002 · Apt 204

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling located at b-room 210, 3rd story

    Dec 27, 2002 · Apt 210

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors bulkhead to roof

    Dec 27, 2002

    Closed — Violation closed
  • B

    Arrange and make self-closing the doors door bulkhead to roof

    Dec 26, 1996

    Closed — Violation closed

DOB building violations · 46

  • Plumbing none

    The department of buildings orders all plumbing work permit number 122121453 stopped immediately due to the inactive lmp # 1343

    Jul 7, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Construction other optional

    Borough commissioner has issued a stop work order under application #140934005 due to contractor withdrawal. 0% of work completed. stop all work immediately and make the site safe.

    Nov 24, 2020

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 23, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - dismissed
Show 36 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 12, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 12, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 8, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 17, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 17, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 25, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 25, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 11, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 11, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 11, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 14, 2012

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 26, 2012

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 26, 2012

    Dob violation - dismissed
  • Construction other optional

    Work w/out permit

    May 28, 2009

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Aug 13, 1998

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 15, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 1, 1994

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Jun 28, 1994

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 28, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 13, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Feb 11, 1991

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    Feb 11, 1991

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 24, 1990

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 24, 1990

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Mar 30, 1989

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 19, 1989

    Dob violation - dismissed

ECB violations · 60

  • Class - 2

    At time of inspection, premises altered under alt 1 job #123756168 occupied as a hotel with 43 b units without a valid certificate of occupancy, obtain a valid c of o or discontinue illegal occupancy; obtain ce

    May 4, 2023

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.failure to provide required natural light & ventilation for every bedroom.noted:at 2nd floor having created additional guest room w/o natural light & ventil

    Jan 12, 2023 · Penalty $312

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.noted:at 2nd fl having erected full height partition wall to create additional guest room near internal staircase with door;se

    Jan 12, 2023 · Penalty $625

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by dept of buildings records illegal occupancy noted at 2nd fl increasing number of guest rooms from 8 to 9 created new room next to internal staircase equipped & arranged as

    Jan 12, 2023 · Penalty $625

    Resolve
  • Class - 1

    Work w/o a permit.permit #122121453 has completed plumbing inspection for gas fire cooking equipment on 1st fl.inspections performed on 1/9/2015.as of date inspection no gas fire cooking equipment on 1st fl.no

    Dec 14, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Work w/o a permit. work noted in room 207 (2nd flr) door to the fire escape was removed. a new window is installed. rmdy: obtain required permit.

    Oct 29, 2018

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio# 35250392h issued on 04/16/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.for:(removed) or defaced a written posted vacate or

    Jun 1, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/v olation#35250391x issued on 04/16/18 and to file a certificate of cor ection pursuant to 28-201.1 and 1rcny 102-01.for:sec.28-207.4 failure

    Jun 1, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Removed or defaced a written posted vacate order noted: vacate#18/2010was issued on 2-4-10 & posted on front of bldg however at time of inspection the vacate order was removed & bldg was occupied.

    Apr 16, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 28-207.4 failure to obey a vacate order from the commissioner per28-207.4. noted: partial vacate order #18/2010 was issued to vacate room#'s 101,102,107,303,304,306,308,309,402,403,406,407,408,& 409 howeve

    Apr 16, 2018 · Penalty $4,800

    Resolve
Show 40 more ↓
  • Class - 2

    Work w/o a permit. noted: at time of inspection observed new partitions & opened floors of the public corridors were greated to construct aprox 4'by 4' for elevator shaft. from 1st upto 4th floot. approx 50% of

    Apr 16, 2018

    Resolve
  • Class - 2

    Failure to comply w/comm's order contained in summ/viol#35297290p issdon 11/29/17 and to file a cofc pursuant ot 28-201.1 and 1rcny 102.1 cellar construction site excessive debris/bldg material.rem:comply w/com

    Jan 24, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/comm's order contained in summ/viol#35297282p issdon 11/29/17 and to file a cofc pursuant ot 28-201.1 and 1rcny 102.1 failure to obey a vacate order by comm per bc 28-207.4 rm#201,207,301

    Jan 24, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/comm's order contained in summ/viol#35297286m issdon 11/29/17 and to file a cofc pursuant ot 28-201.1 and 1rcny 102.1 illumination for exits,exit discharges and public corridors per bc 100

    Jan 24, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/comm's order contained in summ/viol#35297288x issdon 11/29/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102.1 no guardrails open shafts floors 2-5 adequate guardrails s/fall prote

    Jan 24, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/comm's order contained in summons #35297286m issued on 11/29/17 & to file a cert of correction pursuant to 28-201.1.illumination for exits exit discharges & publice corridors per bc 1006.1.2

    Jan 24, 2018 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35289834y issued on 10/18/17 & to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.at the time of inspection

    Nov 30, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.illumination forexits,exit dischargesand public corridors per bc1006.1.27381.(2)thru(5)not operational when tested.rem;rebar/replace lighting.

    Nov 29, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. both sides of all hallways are being (clad) in 1/2 inch plywood on floors 2,3,4-as per 1938 code 26-666.0 restrictions on use of wood-wood or other combust

    Nov 29, 2017 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain institute safety equiptment measures or temporary construction-no guard rails.open shafts floors(2)-(5)no adequate guardrails/fall protection at time of inspection.11 stop work make jobsite.

    Nov 29, 2017 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements-celllar construction site-excessive debris/building material time of inspection observed metal stud,drywall,metal doors,piping,bx,hardware,powe

    Nov 29, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to post or properly display permit for work at premises.at time of inspection no work permits were posted or door or in any common aeas and hotel manager front desk clerk and construction manager shows

    Nov 29, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to obey a vacate order by the commissioner.per 28-207.4-rooms 207,208,307 occupied as follows(1)#207-room was being used by construction workers for storage of personal belonging-(1)worker was on fire e

    Nov 29, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Failure to provide unobtructed exit passageway-approximately(20)4 x 8 sheets of(y2")plywood stacked in second flr hallway creating full ostruction/blockage of hallway-(egress)to fire escape/exit.

    Nov 29, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations.at the time of inspection,stairway from 1-5floor have no handrails,no mid-section aand post frame prevention.windows in entire b

    Oct 18, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans construction document at job site at time of inspection.(at the time of my inspection there was no document as per requested). remedy: provide approved/accepted constr

    Oct 18, 2017 · Penalty $530

    Resolve
  • Class - 1

    Unlawfully continued work while notice of a stop work order issued 6-14-12 for ecb#35151645n at time of inspection on 4-10-17 2nd two 5th fl(removed)installing new plumbing & electric & walls. remedy: comply w/

    Apr 10, 2017 · Penalty $4,800

    Resolve
  • Class - 1

    Work w/o a permit. noted: from 2nd fl thru 5th fl installed electrical temp lights/wiring installed new plumbing water & waste lines/risers throughout 2nd to 5th fl. remedy: obtain all required permits.

    Apr 10, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    B101/50:burham-k808henei-l2-41,000 btus for hot water boiler.has no permits.aquire proper permits and subit certificate of correction;51-boiler is cease use.

    Nov 14, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    B254,c,4a,5a,11,15,19a,36,38,42,50,50a/b254-class 2,28-301.1;36-found burnham k8088henei-c2,410,000 btus force hot water voilating conditions listed and submit certificate of correction;50-no clean out on chimn

    Nov 14, 2016 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.noted:defective out of service sprinkler system (closed in cellar main water supply valve)& out of service fire alarm.rem:maintain,repair/replace fire alarm & s

    Mar 20, 2015

    Resolve
  • Class - 1

    Bc 1023.1 failure to provide exit discharge directly to the exterior of the bldg.noted:exit discharge for rear fire escape stairs @ 2nd fl lvl (returning) to the same bldg.rem:comply w/ code.

    Mar 20, 2015

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.no fire stopping per bc 718.3'27-345 noted:no fire stopping in cellar,2nd fl corridor as holes in fire rated ceiling finishes to exposed fl wood (joists)rem:pro

    Mar 20, 2015

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner.use of prohibited door hardware per bc1008.1.8;27.3718,fire exit doors @ rear fire escape stairs w/ prohibited hardware.rem:provide legal hardware.

    Mar 20, 2015

    Resolve
  • Class - 1

    Work w/o a permit observed at 130pm in cellar existing boiler removed w/ gas piping and water piping removed- new boiler & matercals at siteno dob permit for work. remedy: obtain a permit or restore to prior le

    Nov 13, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    Fgc misc. miscellaneous violations. observed at 130pm in cellar laundry room 2 gas dryers connected w/ flexable connector must be hard piping connectors. remedy: compyl w/ notice of violation

    Nov 13, 2014

    Resolve
  • Class - 2

    Failure to maintain bldg wall(s)or appurtenances.noted:observed @ time of insp @ roof level the parapet wall @ exp#2 to be leaning & shifted,w/ loose bricks.also water damage from the roof observed on the walls

    Nov 6, 2014 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain bldg noted:@ cellar level @ laundry room observed the (2)gas(prieres)to be connected to gas line w/ flex gas cables.the laundry has(2)gas dryers w/o a sprinkler head installed.also @ cellar

    Nov 6, 2014 · Penalty $1,000

    Resolve
  • Class - 1

    Filed a cert,form,applicatuion etc.,containing a material false,statement(s).noted:ecb violation number# 35025424m issued @ oremisses on 07/16/13 fir defective chimneys & parapet walls @ exp#2 premises summit c

    Nov 6, 2014 · Penalty $4,800

    Resolve
  • Class - 1

    28+201.2.1(4),28-203.1,28-201.1,failure to comply w/ vacate order noted:observed @ time of insp @ the hotel room#107 to be occupied by a male & female persons contrary to vacate order #1812010 issued on 02/04/1

    Nov 6, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to maintain bldg wall(s) or appurtenacnes. defects noted: at time of inspection 2 chimneys at exp 2 at roof are leaning out of plumb towards roof. parapet wall at exp 2. also leaning loose brick and

    Jul 16, 2013 · Penalty $530

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passsageway noted exit passageway from cellar lvl interior staircase obstructed by baggage previous violation #349477627 rem: remove obstruction

    Jun 14, 2012

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway from cellar level (interior staircase) obstructed by luggage. previous violation #349477627 rmdy: remove obstruction.

    Jun 14, 2012 · Penalty $3,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner failure to provide number of required means of egress for every floor per bc1018.1 & 27-366 noted rooms have no 2nd means of egress from rooms #107 108 207 208

    Jun 14, 2012

    Resolve
  • Class - 2

    Work w/o permit work noted: at rear of premises erect cmu structure extension apprx 12'height and a/c units on roof of extension.rmdy: stop all work obtain permit.

    Jun 14, 2012 · Penalty $2,000

    Resolve
  • Class - 2

    Work w/o permit work noted at rear of premises erect cmu structure extension appx 12'ht and a/c units on roof of extension rem: stop all work obtain permit

    Jun 14, 2012

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. failure to provide number of required means of egress for every floor per bc1018.1 and 27-366.noted: rooms have no 2nd means of egress from rooms #107,108,207,

    Jun 14, 2012 · Penalty $6,000

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. noted: exit passageway from cellar level (interior staircase) obstructed by luggage. remedy: remove obstruction.

    Mar 26, 2012 · Penalty $1,200

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by buildings dept records. illegal occupancy noted: (2) rooms #101,102 converted into cageteria & lounge (2) at cellar level create 2 offices & laundry room.

    Mar 26, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain bldg in a code-compliant manner. defects noted: attime of inspection 3 holes and openings around ceiling penetrations. water damage evident in ceiling, parapet wall at exp 2 is leaning,

    Aug 11, 2010 · Penalty $250

    Resolve

Complaints

  • Heat/hot water

    Entire building

    May 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 14, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 27, 2016 · Apt 201

    Close
  • Nonconst

    Vermin

    Dec 6, 2007 · Apt 407

    Close
  • Nonconst

    Vermin

    Dec 6, 2007 · Apt 407

    Close
  • Nonconst

    Vermin

    Dec 5, 2007 · Apt 407

    Close
  • Appliance

    Sprinker cert

    Jul 26, 2004

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
1920
Floors
5
Residential units
—
Building area
10,301 ft²
Lot area
2,500 ft²
Zoning
C6-4
Community board
104
Council district
3
Block / lot
1037 / 35
Assessed value
$1,336,950
Landmark / historic district
No

HPD registration #133447, last renewed Aug 5, 2025.

Questions about 765 8 Avenue

Who owns 765 8 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Eighth Avenue Sky, LLC.

Does 765 8 Avenue have violations?

Yes. NYC HPD has recorded 19 housing violations at this property.

Is 765 8 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 765 8 Avenue built?

City records list 1920 as the year it was built.