244 West 49 Street is an elevator apartment building built in 2025 in Manhattan, 10019. It has 138 residential units across 28 floors. The owner of record is West 49 Realty LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026.
- HPD violations
- 1
- DOB violations
- 63
- ECB violations
- 41
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed
DOB building violations · 63
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job # m00661253 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 22, 2022
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all work under job # m00661253 - except to make site safe - due to special inspector alberto roman, pe, surrendered all filing privileges
Aug 22, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 8b unsafe report filed
Sep 2, 2021
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Sep 2, 2021
Dob violation - dismissed
Show 40 more ↓
- Failure to correct swarmp conditions (facade) facade required
Cycle 9b failure to correct swarmp conditions
Sep 2, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 15, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2015
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 27, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2009
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 23, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2004
Dob violation - resolved
ECB violations · 41
- Class - 2
At time of inspection observed active construction activities. upon requesting the following documents were not provided, site safety plan, support of excavation drawings, site specific safety orientations. all
Jun 4, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active construction site. upon reviewing documents notice as per pre shift site has being active since 6-01-26. construction superintendent not on site so i request to see cs log
Jun 4, 2026 · Penalty $5,000
Resolve - Class - 1
Upon inspection i observed excavation work taking place at expos 1. upon request to see approved excavation drawings (docs to be kept on site) vault work (expected 25ft deep drilling & 10 ft of lagging) none we
Feb 2, 2026 · Penalty $2,500
Resolve - Class - 1
Upon inspection i observed excavation equip and work ongoing at expos 1 for proposed con-ed vault within 2ft of pedestrian protection (6ft fence). upon review of the ssp the required 8ft fence was removed when
Feb 2, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection of 28 story new building in progress observed area on 28th floor where worker for berry h-vac was working on a-frame ladder while pulling cable where they fell injuring back/head unable to
Nov 14, 2025 · Penalty $2,500
Resolve - Class - 1
Where a garbage bag broke resulting in debris falling on worker head and was taken to the hospital by ambulance. upon review in the dept. records it was reveal that no notification was made to the dept. within
Nov 12, 2025 · Penalty $10,000
Resolve - Class - 2
At time of inspection an inactive jobsite, observed construction fence in place at exp. #1, upon research in bis/dob now and correlated documents in the system, i discovered the only temporary construction fenc
May 15, 2023 · Penalty $3,125
Resolve - Class - 1
At time of inspection on an active 8 story alt jobsite performing hot works i observed fdny permit for combustible storage was expired on 09/20/2022. stop all hot works on site.obtain a new fdny permit for stor
Oct 14, 2022
Resolve - Class - 2
At time of inspection on an active 8 story alt jobsite i observed sidewalk shed installed at exp.1 contrary to design drawings - observed sws with 4 open bays - drawings only show 3. observed footings contrary
Oct 14, 2022 · Penalty $625
Resolve - Class - 2
At time of inspection on an active 8 story alt jobsite when asking the competent person to provide an up to date inspection letter for the sidewalk shed i observed the latest inspection letter is dated on 01/17
Oct 14, 2022 · Penalty $625
Resolve
Show 31 more ↓
- Class - 1
At time of inspection on an active 8 story alt jobsite i observed supported scaffolding installed on top of sws at exp.1, 3 and 4. observed 3 levels of fully planked levels - design drawings show only 2 levels
Oct 14, 2022 · Penalty $2,500
Resolve - Class - 1
Overload demo floor with 4 mechs i observed 4 mechanical equipment(excavator,brokk,2 loaders) on the 8fl of a building undergoing demolition.upon request to view demo plans, i discovered plans only show 1 excav
Jul 25, 2022 · Penalty $625
Resolve - Class - 1
Chute i observed active demo site currently on the 8fl with use of debris chute. upon viewing chute plans, i discovered plans call for 10x10 timber curb at chute opening to prevent loader from falling into the
Jul 25, 2022 · Penalty $2,500
Resolve - Class - 2
Debris piled over 1f i observed debris consisting of bricks piled over 1feet high on the 8floor. upon viewing approved demo plans, i discovered the plans call for 1f maximum height. hazard of floor collapse exi
Jul 25, 2022
Resolve - Class - 2
Inadequate lighting i observed workers on the 2nd fl and 7fl working in an area where there was inadequate lighting and could barely see. hazard of tripping, falling exists that can cause injury to persons and
Jul 25, 2022
Resolve - Class - 2
Failure to maintain/display on site documents require by bc chapter 33 site safety plan & others.at time of inspection of active 8 story building full demolition job site observed pipe scaffold installed on top
Jun 1, 2022 · Penalty $625
Resolve - Class - 1
Restore to service so a complete inspection can be made by this department.
Dec 1, 2021
Resolve - Class - 1
Out of service
Apr 28, 2021 · Penalty $1,250
Resolve - Class - 2
A.c. 27-929.1 failure to complete the installation fo a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019 in an office building 10
Nov 15, 2019
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 803176. remedy: submit required technical report.
Oct 15, 2018 · Penalty $1,250
Resolve - Class - 2
73o2.74o2.97x10 78o2 and 74o2 clean rails of fuzz 97x10 erepair elevator an return to service
Jul 31, 2009 · Penalty $500
Resolve - Class - 2
Failure to summit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation
Dec 7, 2008
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. front elevn a metal sheathing in front of 4/f window sill (2nd window from east)was found cooked w/broken or fragmented 4/f (1st window from east) c/ impr
Oct 6, 2008 · Penalty $1,000
Resolve - Non-hazardous
08v01. 08v01 inspection reveals with me & 2 other persons leveling down the lobby level the elevator was out of level 5" tp 6" inches cu until its connected call dob before returning to service 566-5542 trippin
May 30, 2008 · Penalty $800
Resolve - Non-hazardous
84x10.08v01.83e09.24x10.24x10.66o02.84x10 repair phone communication system 08v01 adjust leveling in the down direction 83f09 rubbing in shaftway during motion
May 8, 2008 · Penalty $350
Resolve - Non-hazardous
02l07.15l10.08v01.23l10.09l10.85bb05.86bb05.40w07.40t07.55y13.34q07.38o02.66o02. 02 car comm. 23 8th fl 40 x2 mr & secondary
Feb 14, 2008 · Penalty $350
Resolve - Non-hazardous
02x10,38o02,39p16,36p16.02-in car phone-inoperative.38-car top dirty-also broken light bulb on top of car.
Jul 5, 2007 · Penalty $180
Resolve - Non-hazardous
84x10/15m11/08v01/16e01 84-repair communication.08-properly adjust leveling.16-observed door hang up does not make contact - rubbing adjust door to close.
Aug 28, 2006 · Penalty $350
Resolve - Non-hazardous
51m07/69d06/03m07/55y13/64l10/36o09/33e10/38o02 51- reshackle hoist ropes- no tag. 69- restore counter weight buffer springs fully upright. 03- restore handrail, 55- seal leak clean bed plate. 36- remove refuse
May 6, 2004 · Penalty $880
Resolve - Non-hazardous
51m07/51o02/55y02/38o02/38b07 51-m-reshackle hoist ropes no tag 38-b- defective light bulb provide .
Dec 26, 2003 · Penalty $350
Resolve - Non-hazardous
37m,36t,13m. replace broken wire on relay.
Dec 13, 1999
Resolve - Non-hazardous
Insatllation of mechanical equipment without first obtaining an equipment use permit a/c units are located on main roof. the units areas follows one carrier serial number 3594e05995, mitsubishi model numb
Oct 27, 1999 · Penalty $400
Resolve - Non-hazardous
50b10,37b10,54b10, 50y14, 46q03, 33q03, 53m07, 46h12, 39h08, 15i11, 57o02, 50-37-54 renew city id tag with proper no. 50y seal leak 46q- install rope guards 33q-provide grating to exposed deflector sheave 53
Aug 17, 1998 · Penalty $350
Resolve - Non-hazardous
33i11,33i11, 74o02, 57o02, 48b13, 50y14, 74b10, 60i12, 55x11, 37b06, 37u16, 74b10 33i repair overhead access door 33i-repair skylight glass74oclean car top 57o-clean pit 48b-restacle drum cable 50y-seal oil
Aug 17, 1998 · Penalty $350
Resolve - Non-hazardous
74i,51h,36i,46o,30o,57o,47h, 74i-up & dn safety bar on controller (between relays) 51-excessive worm & gear play.
Aug 20, 1997
Resolve - Non-hazardous
53b 75u
Mar 30, 1994 · Penalty $200
Resolve - Non-hazardous
Failure to provide adequate emergency power exit light throughout corridors in bldg on various floors ie 2345 etc failure to provide emergency power directional signs in corridor throughout bldg remedy
Jun 7, 1993 · Penalty $1,400
Resolve - Non-hazardous
Failure to provide emergency power exit light throughout floor areas and corridors, except 2nd floor main corridor. remedy:provide emergency power exit light according to b.e.c. standards. and local law 16/84.
Jan 8, 1993 · Penalty $1,000
Resolve - Non-hazardous
Failure to provide emergency power exit lights throughout building corridors and tenant spaces. remedy:provide emergency power exit lights according to b.e.c. standards.
Mar 4, 1992 · Penalty $400
Resolve - Non-hazardous
74 file for dismantling of elevator
Dec 11, 1991
Resolve - Non-hazardous
15r, 05i, 15-remove locks from hoistway doors. 05-replace safety edgeon car door.
Mar 21, 1991 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Mold
Aug 3, 2026 · Apt 2605
Close - Unsanitary condition
Pests
Jul 30, 2020 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 14, 2018 · Apt 1A
Close - Appliance
Sprinker cert
Jul 26, 2004
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- 28
- Residential units
- 138
- Building area
- 134,477 ft²
- Lot area
- 8,034 ft²
- Zoning
- C6-5
- Community board
- 105
- Council district
- 3
- Block / lot
- 1020 / 59
- Assessed value
- $20,104,200
- Landmark / historic district
- No
HPD registration #145413, last renewed Mar 16, 2026.
Questions about 244 West 49 Street
Who owns 244 West 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is West 49 Realty LLC.
Does 244 West 49 Street have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 244 West 49 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 244 West 49 Street built?
City records list 2025 as the year it was built.
How many apartments are in 244 West 49 Street?
It has 138 residential units and 139 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.