760 8 Avenue
Manhattan, NY 10036BBL 1-01018-0061Map
Owner of record: Bldg 760-768 Eighth Avenue LLC
760 8 Avenue is a store building built in 1928 in Manhattan, 10036. The owner of record is Bldg 760-768 Eighth Avenue LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 42
- ECB violations
- 24
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 42
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 13, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Plumbing none
The dob intends to revoke all approvals and permits under plumbing laa #122580705 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Sep 26, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed
Show 32 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2010
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 7, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 27, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Construction other optional
C-construction other optional
May 10, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p17089
Dec 26, 2001
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 10, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p17089
Dec 19, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Zoning none
Z-zoning none
Oct 5, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 5, 1994
Dob violation - dismissed - Zoning none
Z-zoning none
Oct 5, 1994
Dob violation - dismissed - Zoning none
Z-zoning none
Oct 5, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Feb 6, 1991
Dob violation - dismissed - Electric signs none
Es-electric signs none
Feb 6, 1991
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 28, 1989
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Jul 28, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 26, 1989
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 1988
Dob violation - resolved
ECB violations · 24
- Class - 2
At the time of my inspection i observed that there were unauthorized advertisement on the side walk shed installed.
Jun 18, 2026 · Penalty $2,500
Active - Class - 2
52k11/52-k-11-replace rouged hoist ropes
Oct 20, 2017 · Penalty $250
Resolve - Class - 2
Failure to provide unobstructed exit passageway. noted a cellar level 2nd means of eating & drinking establishment know as "the mean fiddler" has obstructed exit passageway with; steel drum plants 4 & a curtain
Feb 8, 2011 · Penalty $400
Resolve - Class - 2
Work does not conform to approved plans. non-conforming work noted: at4th flr level approved plans dated 5.7.08 under permit #110217177 a legal outdoor eating & drinking establishment w/9 4'0 x 6'0 aluminum
Jan 28, 2010
Resolve - Class - 2
Work does not conform to approved plans dated 8.22.08 under pa-1 #101444340 at 3rd flr level a legal stage equipped for 8 persons now doubles as an illegal motion picture studio w/light projection source,
Jan 28, 2010
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner, in that entire pa spaces sprinkler heads are being partially obstructed by aluminum hanging ornaments from ceiling. remedy: remove all sprinkler obstructions
Jan 28, 2010 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/self-closing requirements of fire doors. noted: muultiple exit doors from 2nd-4th flrs are not self-closing & latching. remedy: comply w/self-closing requirements of fire doors.
Jan 28, 2010 · Penalty $500
Resolve - Class - 1
Work w/o permits. work noted: at 2nd flr level located in stairway "a"exist a roll down gate totally obstructing exit passageway. remedy: obtain all necessary approvals & permits to remove roll down gate
Jan 28, 2010 · Penalty $1,600
Resolve - Class - 1
Sec. 1004.4;27-534(b). failure to comply w/'design occupant load exiting from multiple level requirements'. noted: c/o #102058675 issued 11.21.03 indicates a total of 1,862 persons occupying 3 flrs as f3 & f4
Jan 28, 2010
Resolve - Class - 3
68m7.69m7.12q3.15d6.03d6.53b14.70r9.70r09 material stored in walk in pit
Jun 25, 2009 · Penalty $500
Resolve
Show 14 more ↓
- Hazardous
Operation of pa w/o a current permit. note permits #s 101444359 2nd flr. 3rd flr #101444340 & 4th flr #102796351. all expired 06/30/07. remedy: obtain current pa permits for 2nd,3rd & 4th flr.
Aug 12, 2007 · Penalty $500
Resolve - Hazardous
Required means of egress obstructed. note at 3rd fl metal barrier and metal coat racks obstructing exit passageway. remedy: remove obstructions from passage way immediately and maintain
Aug 12, 2007 · Penalty $400
Resolve - Non-hazardous
Failure to provide contractor's sign. remedy: provide sign.
Aug 31, 2005 · Penalty $5,000
Resolve - Hazardous
Failure to maintain exterior building wall:at south elevation wall parapit level and at various location on said wall parging on wall collapsed and spalling of parking on wall is occurring section of wall where
Feb 10, 2005 · Penalty $2,500
Resolve - Non-hazardous
37g12-40b14-54d06-35o02-73o02-46m07-31q03-57o02-14m07. replace #4 & 5 fuses 40- seal governor 54-ground cable 73-clean down entire device 46-cable date tags. 31-cover all handy boxes in motor room.
Oct 28, 2002
Resolve - Non-hazardous
Operation of a public assembly without a currect permit. place of assembly permit. 101444359 has expiredon 5/04/02 remedy: obtain a current p.a.permit.
Jun 9, 2002 · Penalty $100
Resolve - Non-hazardous
No equipment use permits. noted: 2 "trane" type a/c units mounted on dunnage at roof level of premises. remedy: obtain all proper permits and approvals from dept. of buildings.
Feb 12, 1999 · Penalty $400
Resolve - Non-hazardous
50y,35o,35m,30m,25b, 50-seal and clean machine 35-clean machine room remove material 35-install lock on room door and labeled 30-cover limit switch in shaft. 25-adjust door operator for proper closing.
Nov 19, 1997
Resolve - Hazardous
Failure to maintain exterior building wall. missing metal cornice across entire front.corroded & broken cornice at southside. remedy: provide overhead covering & make all require repair.
May 6, 1997
Resolve - Hazardous
Failure to maintain exterior buidling wall missing metal cornice across entire front. corroded and broken cornice at the south sied. spalling and unkeyed massonry and brick work upper level. remedy: provide ove
Jun 19, 1996 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain defect noted: holes throughout parapet wall above front entance. west side. remedy: make all repairs in a safe and safe manner.
Aug 24, 1995
Resolve - Non-hazardous
35d,46h,50y,50f,28h,10r,73o. 74a)perform 5 year safety test and file elv3 form.74b)clean brake pulley + change oil soaked linings. 74c)replace car floor(tripping hazard.74b##lockout on car station.74e)replace
Jun 14, 1995 · Penalty $200
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingtot he installation of required fire protection systems. remedy:file report.
Feb 1, 1994 · Penalty $200
Resolve - Hazardous
Failure to have approved pa plan availavle for inspection panic hardware inoperative at 2 means of egress basement. remedy repair or replace panic hardware forthwith
Oct 30, 1989 · Penalty $175
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K2)
- Year built
- 1928
- Floors
- 4
- Residential units
- —
- Building area
- 22,073 ft²
- Lot area
- 8,042 ft²
- Zoning
- C6-4
- Community board
- 105
- Council district
- 3
- Block / lot
- 1018 / 61
- Assessed value
- $8,229,600
- Landmark / historic district
- No
Questions about 760 8 Avenue
Who owns 760 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bldg 760-768 Eighth Avenue LLC.
Does 760 8 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 760 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 760 8 Avenue built?
City records list 1928 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.