160 Central Park South is a condominium built in 1930 in Manhattan, 10019. It has 180 residential units across 42 floors. The owner of record is Dig Eh Hotel LLC. HPD has recorded 13 housing violations here, most recently on November 17, 2025.

HPD violations
13
DOB violations
176
ECB violations
57
HPD complaints
11

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 17, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 13

  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 15, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 24, 2016

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 1, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 1, 2016

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 1, 2016

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Apr 1, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 1, 2016

    Closed — Violation closed
Show 3 more ↓
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; located at apt 1132, 11th story, 1st apartment from west at north

    May 14, 2014 · Apt 1132

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1132, 11th story, 1st apartment from south at west

    May 12, 2014 · Apt 1132

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1132, 11th story, 1st apartment from south at west

    May 12, 2014 · Apt 1132

    Closed — Violation closed

DOB building violations · 176

  • High pressure boiler boiler required

    Violation issued-failure to file 2018 internal hgh pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 13, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 3, 2020

    Dob violation - resolved
  • High pressure boiler boiler required

    Violation issued - failure to file 2017 external high pressure boiler inspection

    Mar 16, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 21, 2019

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 13, 2019

    Dob violation - resolved
  • High pressure boiler boiler required

    Violation issued for failure to file 2015 annual high pressure boiler inspection

    Jun 23, 2017

    Dob violation - dismissed
  • Construction other optional

    Due to vehicle striking sidewalk shed

    Jun 18, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 7, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 7, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 7, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 7, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2016

    Dob violation - resolved

ECB violations · 57

  • Class - 2

    Ecb violation issued for failure to post and distribute notice to occupants of tpp for construction work verification for apt 1703 observed at time of inspection no tpp posted on the 17 floor, post/distr. notic

    Oct 29, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Ecb violation issued for failure to post active permits for apartment 1703 file with the d.o.b for construction work to be done observed at time of inspection permit not posted for public verification at the pr

    Oct 29, 2024

    Resolve
  • Class - 3

    Work without permit 4 signs , 3 signs facing 58 street ,size approx. 9'x9' and one sign facing 59street size7'x10' mention painting & make merry nordstrom 58 street& broadway., obtain permit or restore premises

    Dec 9, 2022 · Penalty $250

    Resolve
  • Class - 2

    Draft inducer and fresh air fan details not reflected on plans, fgc 106.5 #3 evidence of leak on water column and open valves need to be capped or plugged fgc 102.3; pc-misc.,

    Jan 26, 2021

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#803134. remedy: submit acceptable require

    Feb 13, 2020 · Penalty $625

    Resolve
  • Class - 1

    Bc330113-failure to provide manufacture spec for suspended scaffold platforms & betamax.note:at time of inspection on a active job site of a40 story building,observed suspended scaffold platform readely availab

    Oct 21, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    No site safety manager or site safety coordinator present atsite as required.note:at time of inspection ofa 40 story building at interior expo#3 facade work in progress up on request for site safety manager/coo

    Oct 21, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments(s/w shed)note:at time of inspection of a 40 story builing with facade work on going,i observed sw sheds in place at exp#1&#3

    Oct 21, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.note:at time of inspection on alt 2 facade work in progress,i observed the following none comfing to ssp(1)stair tower;edges f

    Oct 21, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Prohibited signs and unlawful posting on protective structures.note:attime of inspection of a 40 story bldg w ongoing facade work,i observed sw sheds at expo#1 & #3.other than the specified information requir

    Oct 21, 2019 · Penalty $1,250

    Resolve
Show 40 more ↓
  • Class - 1

    Failure to protect lifelines from sharp edges and abrasion causing a hazardous condition for workers on suspended scaffold.note:at time of inspection on a alt 2 job 40 story scaffold that were readely available

    Oct 21, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to maintain/display on site documents.note:at time of inspection of a 40 story bldg of ongoing facade work,i observed various required documents and drawings not on site.upon request for approved dob dr

    Oct 21, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    36.rockmills ftsh,lp steam ber,mp 350,oil/gas,2005.(36)referenced boiler was found in active service with a temporary jurisdictional number issued on 12/10/12.the boiler would require an inspection and signoff

    Aug 22, 2016 · Penalty $1,250

    Resolve
  • Class - 2

    36.rockmills ftsh,lp steam,ber,mp350,oil/gas,2005(36)referenced boilerwas found in active service with a temporary jurisdictional number issued on 12/10/2012.the boiler would require an inspection and sign off

    Aug 22, 2016 · Penalty $1,250

    Resolve
  • Class - 2

    36.rockmills ftsm,lp steam ber,mp 350 0il/gas,2005(36)referenced boiler was found in active service with a temporary jurisdictional number issued on 12/10/2012.boiler would require an inspection and signoff on

    Aug 22, 2016 · Penalty $1,250

    Resolve
  • Class - 1

    Fail to safeguard all persons/property affected by const operations. noted: no protection of setbacks & terraces provided eg. no caution tape, no controlled access etc to terraces. violation written sue to pers

    Oct 18, 2010 · Penalty $12,000

    Resolve
  • Class - 2

    Obscure lawful signs.@ the time of my insp existing bldg structure up to 45 story .approx 11 worker on site.i observed a sdwlk shed erected infront of 160 central park south approx 80ft shed parapet wall is ere

    Sep 15, 2010

    Resolve
  • Class - 1

    3301.2.fail to provide & maintain adequate means of egress & ingress:upon insp as noted on active construction site on the 42nd fl the entrance & exit to the work area was blocked w/disguarded garage bags & bld

    Jun 9, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved const documents and/or approved amendments:upon inspection as noted on active construction site the roof protection on all the set backs terraces,rooftops is not provided/insta

    Jun 9, 2010 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to have site safety manager presents as required. as noted: attime of inspection at above active construction site observed workers were working on 2nd flr setback and site safety manager is not present

    Apr 5, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Sec. 28-105.11. failure to post work permitted on construction or demolition site in a conspicuous location. noted at time of inspection observed work site w/erected sidewalk shed, 2 separate supported pipe

    Jan 7, 2010

    Resolve
  • Class - 2

    Sec. 3301.9. failure to provide required signage on const. site as percode requirements. noted at time of inspection observed all sign on work site scaffold (shed), contractor & anonymously report sign posted

    Jan 7, 2010

    Resolve
  • Class - 1

    Site safety plans & program facade work under way approx 5 workers from roof level & 2nd fl. erecting(brackets) for suspended scaffolding,roof work at 2nd fl no site safety manager/coordinator,special rigger pe

    Nov 9, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Expired shed permit. noted: shed permit# 104791646 was expired on 4/1/09. remedy: renew permit.

    Apr 6, 2009 · Penalty $400

    Resolve
  • Class - 2

    02l10.40b07.45d00.02 repair alarm bell in hoistway at designated landing 40 indicate on all disconnect switches which ones don't controll elevator 45 properly secure governor access ladder at top of landing

    Mar 2, 2009 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain sidewalk shed. the underside of sidewalk shed shall be lighted at all times. no lights on at 5:40 pm permit #104791646. remedy: comply w/code

    Feb 21, 2009 · Penalty $10,000

    Resolve
  • Class - 2

    Work w/o permit work noted: at 19th flr terrace court yard area erected steel frame & glass structure to create room/space. work 100% complete note: terrace because enclosed. remedy: obtain permit or restore to

    Jan 30, 2009 · Penalty $800

    Resolve
  • Class - 2

    Sec. zr54-31 prohibits the enlargement or any application which would increase the degree of non-compliance of a building or any portions the(roof). noted: at 19th flr terrace increases the pre-existing non-com

    Jan 30, 2009

    Resolve
  • Class - 3

    Occupancy contrary to that allowed by c of o #10322242t024 illegal occupancy noted: at 19th flr of premises. terrace (enclosed) used as part of class 'a' apt #1901 (habitable room). remedy: discontinue illegal

    Jan 30, 2009

    Resolve
  • Non-hazardous

    "stop all work". failure to provide contractors sign.

    Jun 27, 2008 · Penalty $500

    Resolve
  • Hazardous

    "stop all work". sec.27-1046. stirrups not placed at appropriate distace from end of platform of 2pt suspended scaffold.1 stir up is in 6ft other 4ft from the ends of platform.2-licensed rigger failed to ensure

    Jun 27, 2008 · Penalty $2,000

    Resolve
  • Hazardous

    Work w/o a permit.work noted:bldg having erected on 19fl set back roof terrace appr 19' x 14' green housing for apt #1901 w/o first obtaining permit from dob work 100% completed.remedy:obtain a permit legalize

    Apr 25, 2008

    Resolve
  • Non-hazardous

    73h11.73k11.16m11 73 h & k 11 replace comp ropes 16m11 replace missingrestrictor brackets

    Feb 15, 2008 · Penalty $350

    Resolve
  • Non-hazardous

    50a,b,c,d,36.fulton vertical electric blr 150kw,nb 100457 2005.50a-referenced boiler was installed as an emergency replacement unit no signoff exist on the dob database for the new boiler.36-boiler not register

    Dec 28, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    40t07,36t07.40t07-provide label (sign) on machine room door.36t07-provide sign overhead door.

    Jul 3, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    55e10,51k10,38p16. 55/e- motor noise. 51/k- hoist ropes rusted monitor

    Aug 8, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    62z14/ 62o02/ 62 - remove water from pit; seal leak 62 - clean all pit devices

    Apr 9, 2003

    Resolve
  • Non-hazardous

    62m07/ 62o02/ 62z14/ 54b07/ 62 - provide sump cover remove water seal leak 54 - use proper cotter pins on brake pivot points

    Apr 9, 2003

    Resolve
  • Non-hazardous

    Use or installation of plumbing materials or equipment which do not comply with rs-16. remedy: remove non-complying material or equipment. location: room 2605 waste piping for room 2705 pvc piping installed.

    Jan 2, 2003 · Penalty $200

    Resolve
  • Non-hazardous

    73x11- restore to proper working order call for reinspection at 1646-248-8738.

    May 10, 2002

    Resolve
  • Non-hazardous

    57z09,74m07,03m07. 57z remove water from pit. 74m provide cover for direction box inside car. 03m provide missing rating in car.

    Jan 30, 2001

    Resolve
  • Non-hazardous

    50e, make necessary repairs to main machine to remove loud rubbing noise.

    Apr 12, 1999 · Penalty $180

    Resolve
  • Non-hazardous

    35o2, 37i11, 2x11, 75b5. 2-make ring 75b-perform test properly tag same date.

    May 20, 1998

    Resolve
  • Non-hazardous

    35o2, 46h12, 64h12, 30o2 46-renew hoist cable (rusty)

    May 20, 1998

    Resolve
  • Non-hazardous

    46h12, 64h12, 57o2

    May 20, 1998

    Resolve
  • Non-hazardous

    73t,35o,37w,44q,40q, (74a) blow out hoist motor & generator armatures fields, housing (74b) clean secondary (74c) clean car tops.

    May 12, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    73t,35o,37w,44q,40q, (74a) blow out hoist motor & generator armatures fields, housing (74b) clean secondary (74c) clean car tops

    May 12, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    73t,35o,37w,44q,40q,46h, (74a) blow-out hoist motor & generator armatures fields housing (74b) clean secondary (74c) clean car tops

    May 12, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    73t, 35o, 37w, 44q, 40q, 46h. (74a) blow out hoist motor & generator armatures fields, housing (74b) clean secondary (74c) clean car toys

    May 12, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    73t,35o,37w,44q,40q,

    May 12, 1993

    Resolve

Complaints

  • Unsanitary condition

    Mold

    May 2, 2017 · Apt 3007

    Close
  • Unsanitary condition

    Mold

    May 1, 2017 · Apt 3007

    Close
  • Unsanitary condition

    Mold

    May 1, 2017 · Apt 3007

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2017 · Apt 3007

    Close
  • Unsanitary condition

    Mold

    Sep 18, 2016 · Apt 33F

    Close
  • Heat/hot water

    Apartment only

    May 9, 2014 · Apt 1132

    Close
  • Paint/plaster

    Wall

    May 9, 2014 · Apt 1132

    Close
  • Plumbing

    Radiator

    Apr 25, 2014 · Apt 1132

    Close
  • Plumbing

    Radiator

    Apr 3, 2014 · Apt 1132

    Close
  • Nonconst

    Vermin

    Sep 6, 2011 · Apt 535

    Close
Show 1 more ↓
  • Appliance

    Sprinker cert

    Jul 26, 2004

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1930
Floors
42
Residential units
180
Building area
497,528 ft²
Lot area
41,437 ft²
Zoning
C5-1
Community board
105
Council district
6
Block / lot
1011 / 7501
Assessed value
$123,293,193
Landmark / historic district
No

HPD registration #100050, last renewed Jul 31, 2026.

Questions about 160 Central Park South

Who owns 160 Central Park South?

The owner of record in NYC Department of City Planning PLUTO data is Dig Eh Hotel LLC.

Does 160 Central Park South have violations?

Yes. NYC HPD has recorded 13 housing violations at this property.

Is 160 Central Park South rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 160 Central Park South built?

City records list 1930 as the year it was built.

How many apartments are in 160 Central Park South?

It has 180 residential units and 183 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.