120 West 57 Street
Manhattan, NY 10019BBL 1-01009-0044Map
Owner of record: Ricland LLC
120 West 57 Street is a hotel built in 2012 in Manhattan, 10019. The owner of record is Ricland LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 54
- ECB violations
- 43
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 54
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Apr 12, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 31, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2019
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2019
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 9, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 9, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 5, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Emergency power none
Ll2604e-emergency power none
Mar 31, 2008
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Photoluminescent none
Ll2604-photoluminescent none
Nov 1, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 2, 2005
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2003
Dob violation - resolved
ECB violations · 43
- Class - 2
Observed two power vt gas fired water heater model 1400 inoperable, with parts taken off, and not providing hot water. correct all violating conditions and submit a certificate of corrections, maintain boiler
Apr 23, 2026 · Penalty $1,250
Resolve - Class - 2
Observed three gas fired aerco bmx1.5 1290000 btu hot water heating boiler not providing heat. correct all violating conditions and submit a certificate of corrections.
Apr 23, 2026 · Penalty $1,250
Active - Class - 2
Removal of public protection from unsafe facade without approval from the department.as of today time of inspection 01-20-2023 observed there is no public protection along the exterior facade that filed unsafe.
Jan 20, 2023 · Penalty $625
Resolve - Class - 1
Unlawful acts failure to comply with commissioner's order.note:respondent failed to comply with previous issued violations #35651485y issued 7/28/22 & #35651217m issued 6/10/22 which requied respondent to provi
Oct 6, 2022
Resolve - Class - 1
Failure to provide/take required safety measures such as sidewalk shed,nettings,fence,etc where required.note:at time of inspection respondent had not complied to previous violation #35651485y issued 7/28/22 al
Oct 6, 2022
Resolve - Class - 1
Failure to provide/take required safety measures such as sidewalkshed,nettings,fence,etc where required to secure public safety.note:atoi respondent dont complied w/prev vio35651217h issued5/10/22:"qewi filed u
Jul 28, 2022 · Penalty $25,000
Resolve - Class - 1
Failure to provide/take required safety measures such as sidewalkshed,nettings,fence,etc where required to secure public safety.note:qewi filed unsafe filing9182969a001 issued4/12/22 as of today5/10/22,no safet
May 10, 2022 · Penalty $10,000
Resolve - Class - 2
2x10/2-x-10 alarm bell inoperative repair.
Nov 1, 2017 · Penalty $500
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000002592 hasbeen inspected,tested,and disinfected,and that a maintenance plan has been development and implemented,by november 1,2016.rem:file annual ce
Jun 20, 2017
Resolve - Class - 1
Sec. 3301.1.2 failure to provide fdny permit for use of combustible gases oxygen,actylene,propain etc at time of inspection,no fdny permit for use of combustible gases as described on site (when) ask of contruc
Jul 18, 2013 · Penalty $1,600
Resolve
Show 33 more ↓
- Class - 1
Failure to safeguard all persons & property affected by construction operations - unsafe storage of gas filed combustible tank stored in plumbers metal (gas) box - worker used lighter to fire key hole & metal
Jul 18, 2013 · Penalty $2,400
Resolve - Class - 2
Failed to notify dept/obtain permit prior to use/installation off outrigger beans in connection w/suspended scaffold. noted: no outrigger beam notification filed for suspended scaffold on exp #3.
Jun 12, 2013 · Penalty $400
Resolve - Class - 2
Expired notification #1067040 on 10/12/12 for outriggers beams installations on the roof & 29th floor. stop all work at all exposures on suspended scaffolds (except 1 platform at exposure #1 belonging to a&b
Nov 30, 2012 · Penalty $400
Resolve - Class - 1
Sec. 3308.1.1 vertical safety netting not provided - at time of inspection,observed no vertical nets on 21st fl at north east corner sectionapprox 16' section. remedy: provide netting as per dob.
Aug 23, 2012 · Penalty $1,000
Resolve - Class - 1
3301.2 partial stop work order issued pursuant to 28-207.2 and posted at premises-no overhead protection.at time of insp observed working area on newly erected sidewalk shed.horizontal nets above are only for s
May 31, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to maintain hydrostatic pressure & flow test.at time of insp observed standpipe installed & pressurized with compressor & valve-building over 75' in height-no hydrostatic test was performed-no docs prov
May 31, 2012 · Penalty $2,400
Resolve - Class - 1
3301.2 holes/openings not covered. at time of insp observed opening on 5th fl to 2nd floor - open areas east & west sides of bldgs approx 4" in width.remedy:cover all openings on decks.
May 31, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to provide guard rails-at time of inspection observed no guard rails at 2nd floor stair landings & 3rd floor (cooridors).workers working below these areas.rem:provide guard rails as per code.
May 31, 2012 · Penalty $1,000
Resolve - Class - 1
3303.8.2 failure to provide red light for siamese connection & sign:at time of inspection observed siamese connection installed on 57th st-no red light or sign to indicate location as pre code.rem:provide red l
May 31, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to provide toe boards:at time of inspection observed toe boards missing in various locations, from sub-cellar to 4th fl. remedy:provide toe boards as per 33 code.
May 31, 2012 · Penalty $1,000
Resolve - Class - 2
Smoking refuse, evidence observed - at time of inspectin observed smoking refuse on 2nd floor. remedy:comply w/fdny fire code.
May 31, 2012 · Penalty $1,200
Resolve - Class - 1
1906.6.6.1.2 failure to secure reshores in proximity noted:@ time of inspection on an active const on site.reshores @ a 3rd flr north & shore elevation are not secured to prevent from fallin,reshores instsalle
Apr 18, 2012 · Penalty $1,600
Resolve - Class - 1
3310.02:failure of the concrete safety manager to perform required duties. at time of inspection at an active construction site form work isobserved following concrete placement & failure that is not constructe
Apr 18, 2012 · Penalty $1,600
Resolve - Class - 1
On active const site,concrete placement @ fl #4 to #5 shear wall @ exp#2,observed missing row of wall tier on 2 side from work 3 inches fromtop of finish slab,failure to conform to approved const document.foamw
Apr 18, 2012 · Penalty $1,000
Resolve - Class - 2
Sec. bc 3301.7.failure to provide pe approved design drawings.@ time of insp on an active const site,observed @ fl #1,double sack foamwork @fl#1 to mezz level to fl#2 for support of structual concrete stairs fo
Apr 18, 2012
Resolve - Class - 1
An incident occurred during concrete operations.during concrete pour on exp 2-south wall.the form work section gave way & approx 12 yards ofconcrete went through 118 west 57 hotel lobby wall causing damage to t
Apr 18, 2012 · Penalty $2,400
Resolve - Class - 1
Failure to provide (guard rail) system. at time of inspection during incident, observed no guard rails around hoist (pit-on) 1st flr exp 3.remedy: provide guard rail system.
Apr 18, 2012 · Penalty $2,400
Resolve - Class - 1
Sec.3301.2. holes/openings not covered at time of inspection.observed openings on deck flr on 3 & 4th flrs. remedy: cover all hole opening s on deck flrs.
Apr 18, 2012 · Penalty $1,600
Resolve - Class - 1
Supervision of use of power-operated hoisting machine without a hoisting machine operators license expired 3/31/12.cd3709 cn221-12.rem:obtain license/comply w/ code.
Apr 17, 2012 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations-at time of inspections observed job site fence sections,missing during construction operations-job site was open to pedestrians &
Feb 16, 2012 · Penalty $2,400
Resolve - Class - 1
Sec. 3303.8.1.4.2 partial stop work order (all work except repairing the standpipe w/activation of alarm system - issued pursuant to 28-207.2 & posted at premises. failure to comply w/the requirement of standpi
Mar 28, 2011 · Penalty $1,600
Resolve - Class - 1
Failure to provide standard guardrail upon inspection demolition work in progress on 6th fl. at time of inspection noted approx 20ft x 10ft floor opening made on 6th fl,workers walking & working rear by,guardra
Mar 28, 2011 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping - upon inspection,demolitionwork in progress on 6th floor. at time of inspection noted large quantily of debris of demolition accumulated on 5th fl. debris also observe
Mar 28, 2011 · Penalty $800
Resolve - Class - 1
Dismantled,modified or removed supported scaffold w/o a scaffold certificate. observed a worker dismantling/modifying a scaffold on 7th fl w/o a 32hr training certification. remedy: discontinue working. comply
Mar 15, 2011 · Penalty $2,400
Resolve - Class - 1
(misc)bc3303.8failure to maintain standpipe free from obstruction uponinspection,12 story bldg under demolition.demolition in progress on 10th flr slab.@ time of inspection noted the standpipe of the bldg in th
Feb 22, 2011
Resolve - Class - 3
(misc)bc3310.8failure to monitor compliance with the site safety requirements-upon inspection noted 12 story bldg under demolition.demolition of 10th flr slab in progress.@ time of inspection noted that approx
Feb 22, 2011 · Penalty $150
Resolve - Class - 2
Failure to post d.o.t. permit to occupying sidewalk. a construction fence & hoist installed on the sidewalk. no dot permit posted. remedy: post d.o.t. permits.
Dec 9, 2010 · Penalty $250
Resolve - Class - 1
Failure to have site safety manager or coordinator present as requiredobserved external hoist erection in progress for 12 story demo job. site safety plan has been approved. no so coordinator present during con
Nov 29, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to carry out demolitions operations as required by section.noted:work in progress to install exterior scaffolding by way of supports anchored inside structure w/ no record of stand pipe operational stat
Oct 21, 2010 · Penalty $2,400
Resolve - Class - 1
Bc3303.12 no elevator in readiness partial swo @ time of inspection observed active site all (elevator) flring removed no elevator svc @ site partial stop work order issued pursuant to 28-207.2 & posted @ premi
Sep 13, 2010 · Penalty $1,600
Resolve - Class - 2
Failure to file an architect/engineer report certifying exit/directional signs are connected to emergency power source/storage battery equipment.rem:file arhitect/engineer report.
Jan 27, 2010 · Penalty $800
Resolve - Non-hazardous
35#,36w,55m,57o,(35)remove all non elevator equipment and boxes from motor room.(74)provide locks for overhead doors.
Aug 5, 1992
Resolve - Non-hazardous
08v,36w,53m,73t, 08. level car at top flooe. 73.perform 5 yr test and properly tag governor.
May 7, 1992 · Penalty $75
Resolve
Complaints
- Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2012
- Floors
- 29
- Residential units
- —
- Building area
- 128,433 ft²
- Lot area
- 6,025 ft²
- Zoning
- C5-3
- Community board
- 105
- Council district
- 6
- Block / lot
- 1009 / 44
- Assessed value
- $31,803,750
- Landmark / historic district
- No
Questions about 120 West 57 Street
Who owns 120 West 57 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ricland LLC.
Does 120 West 57 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 120 West 57 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 120 West 57 Street built?
City records list 2012 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.