1568a Broadway is a condominium built in 1989 in Manhattan, 10036. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 34
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed
ECB violations · 34
- Class - 2
Failure to submit acceptable required cycle9a report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control903064.submit acceptable required technical report
Dec 9, 2022
Resolve - Class - 1
Failure to maintain safety equipment or temp construction(guardrails)at time of inspection at active alt#1 jobsite i observed inadquately maintained guardrails at all elevator shafts.failure to maintain guardra
Nov 19, 2021
Resolve - Class - 1
Bc 3308.5 vertical safety cables/netting at time of inspection at active alt#1 jobsite i observed vertical netting/zero cable inadequately maintained with large gaps and zero cable not properly secured to concr
Nov 19, 2021 · Penalty $2,500
Active - Class - 2
Housekeeping at time of inspection of active alt#1 jobsite i observed inadequately maintain eyebrows at leading edge from 16th floor and above coonsisting concrete residue and other related construction debris
Nov 19, 2021 · Penalty $1,250
Active - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35581926j issued on 10/11/21 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.no c/of/c on file.remedy:compl
Nov 13, 2021
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35581927l issued on 10/11/12 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.no c/of /c or fil remedy:compl
Nov 13, 2021
Resolve - Class - 1
Failure to institute and maintain safety equipment measures and temporary construction equipment.at time of inspection responding to incident where worker was injured using demolition robot on 7th floor.inspect
Oct 25, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to comply with manufacturers specifications.at time of inspection responding to incident where worker was injured when demolitoin robot hit worker's left foot. inspection revealed manufacturer specifica
Oct 25, 2021
Resolve - Class - 1
Failure to maintain adequate housekeeping.at time of inspection of 47 story alt 1,observed at exp#1 on 3th floor excessive debris by the leading edge.debris consisting of wood planks,plywood,steel rebar and oth
Oct 18, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3301.6.1 design drawings for temporary working platform.at time of inspection of 47 story alt 1 active jobsite,observed on 12th floor a working platform in use by worker performing a demo work upon request f
Oct 18, 2021
Resolve
Show 24 more ↓
- Class - 1
Bc 3301.2 safety measures.at time of inspection of 47 story alt 1,active jobsite observed on 12th floor working platform over floor opening with worker performing demo work with improper tie in.the used tie in
Oct 18, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3308.5 vertical safety netting system.at time of inspection of 47 alt 1 active jobsite,observed on 8th floor at exp#1,inadequate verticalsafety netting(1)missing zero calde.(2)loose and damage netting(3)cabl
Oct 18, 2021 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order.at the time of inspection to following up building under stop work order observed site was active and workers performing steel rebar fixing at roof
Oct 12, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to maintain adequate housekeeping per sec requirements atoi onactive jobsite observed large amts of debris on17,11,9fls create tripping hazard conditions.maintain adequate const housekeeping
Oct 6, 2021
Resolve - Class - 2
3314.3.3 drawings where design is required by this section.the drawings shall at minimum include 3 any structural modifications.note at 7th floor observed structural needle beams exp2(47 street)with steel rods
Sep 27, 2021 · Penalty $1,250
Active - Class - 2
Failure to maintain adequate housekeeping per section requirements.note observed at interior of building at construction floor 9 debris of woodstud,broken concrete,heavy wood timber on top of plywood with two w
Sep 27, 2021
Resolve - Class - 1
Work does not conform to approved construction documents.as noted:at time of inspection while responding to a concrete blow out where the adjacent property brick wall damaged and 6-8 cy of concrete spilled into
Apr 9, 2021 · Penalty $2,500
Resolve - Class - 1
1rcny 3310-02ce concrete safety manager failed to perform duties.as noted:while responding to a concrete blow out where the neighboring property at 1560 broadway was damaged and approx 6-8 c.y of concrete spill
Apr 9, 2021
Resolve - Class - 1
Failure to obtain registered design professional evaluation prior to using existing structure to support formwork loads.note:at time of inspection responding to an incident ssm reported that pouring concrete on
Apr 9, 2021
Resolve - Class - 1
Bc 3301.7 failure to provide pe approved design drawings as noted responding to a concrete blow out where the neighboring property was damaged observed stay form installed with cumber 2x4 branch between adjacen
Apr 9, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to institute and maintain safety equipment measures and temporary construction equipment note:at time of inspection responding to anincident ssm reported that pouring concrete on the 4th floor the form
Apr 9, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to institute and maintain safety equipment measures and temporary construction equipment.note:at time of inspection responding to anincident ssm reported that pouring concrete on the 4th floor the form
Apr 9, 2021 · Penalty $10,000
Resolve - Class - 1
The permit holder shall notify the department prior to the commencement of full or partial demolition operations.note:at the time of my inspection of a 45 story building an active jobsite demolition and new con
Mar 12, 2021 · Penalty $2,500
Resolve - Class - 1
3301.1.2.the requirements for construction and demolition operations shall be also be conducted in conformance with the new york city fire code.jobsite under demo operations and construction operations,i observ
Mar 12, 2021
Resolve - Class - 1
3301.2 safety measures and standards during construction/demolition operation shall institute and maintain all safety measures required by bis chapter and provided all equipment of temporary necessary to safegu
Mar 12, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to institute and maintain safety measures.note:at time of my inspection in response to an incident where one worker was carrying a form work(9x2 feet)long tripped and fell injured on his back and was ta
Mar 10, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to institute and maintain safety measures.note:at time of inspection in response to an incident where one worker fell and injured his back when carrying form work(9x2ft long)approx 80-100 pounds and was
Mar 10, 2021 · Penalty $10,000
Resolve - Class - 2
Prohibited business advertisingsign posted on the sidewalk shed.at the time of inspection,i observed advertising sing"tsxbroadway.com" posted on the parapet of the sidewalk shed at exp#1&2.rem:remove prohibited
Sep 30, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3301.1.1 failure to institute adequate safety measures.worker on 41st fl moving brick machine ran over pieces of concrete which made it fall over injuring worker.rem:stop all work using brick machines until
Feb 26, 2020
Resolve - Class - 1
Failure to notify the department of an accident or incident that resulted in a fatlity or injury a worker doingf demo in the elevator saft recieved a cut on his hand worker walked to urgent care as per a check
Jan 7, 2020
Resolve - Class - 1
Supported scaffold adjust repair maintenance at time of inspection on incidnet comp i observed supproted pipe scaffold iwthin the elevator shaft i observed missing guardraoils an dpplanking not complete this co
Nov 2, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure workers receive sit esafety orientation note at time of inspection respodning to a compliant where itwas reported a worker doing demo work in elevator shaft received a cut to his
Nov 2, 2019 · Penalty $5,000
Active - Class - 1
3314.4.3.5=pre shift inspection for supported scaffold at time of inspection on incident comp i observed supproted pipe scaffold erected within the elevator shaft upon request to see th edaily inspection log fo
Nov 2, 2019 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure workers receive site sfatey orinetation note at time of my inspecton to a complaint wjere it was reported a worker doing demo work in elevator shaft received a ct on his hand whee
Nov 2, 2019 · Penalty $5,000
Resolve
Complaints
- Unsanitary condition
Pests
Aug 16, 2024 · Apt 3216
Close - Plumbing
Water supply
Jan 3, 2023 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RC)
- Year built
- 1989
- Floors
- 47
- Residential units
- —
- Building area
- 498,782 ft²
- Lot area
- 21,758 ft²
- Zoning
- C6-7T
- Community board
- 105
- Council district
- 4
- Block / lot
- 999 / 7501
- Assessed value
- $302,308,344
- Landmark / historic district
- INTERIOR LANDMARK
Questions about 1568a Broadway
Who owns 1568a Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 1568a Broadway have violations?
NYC HPD has no housing violations on record for this property.
Is 1568a Broadway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1568a Broadway built?
City records list 1989 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.