495 3 Avenue
Manhattan, NY 10016BBL 1-00914-0004Map
Owner of record: 33rd Street Investors Vi LLC
495 3 Avenue is a walk-up apartment building built in 1910 in Manhattan, 10016. It has 12 residential units across 5 floors. The owner of record is 33rd Street Investors Vi LLC. HPD has recorded 20 housing violations here, most recently on February 27, 2022. 5 of the 20 most recent violations are still open.
- HPD violations
- 20
- DOB violations
- 13
- ECB violations
- 16
- HPD complaints
- 73
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from east located at apt 4b, 4th story, 1st apartment from west at north
Feb 27, 2022 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system at cellar at boiler room
Feb 27, 2022
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 2b, 2nd story, 1st apartment from west at north
Feb 10, 2022 · Apt 2B
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes discarded cable wires at 5th sty and 3rd sty balconies at front stack
Jan 18, 2022
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 26, 2018
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Jun 6, 2017
Open — Not complied with - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum required 100 watts (light fixture present) at front areaway, 1st story
Mar 25, 2017
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jan 17, 2017
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of installed flat surface roof skylight glass for the apts on the top floor
Feb 21, 2015
Open — Not complied with - CImmediately hazardous
§ 231 m/d law provide legal second means of egress and file application for approval before doing the work at 3rd sty west 1 apt 3a
Feb 21, 2015
Closed — Violation dismissed
Show 10 more ↓
- CImmediately hazardous
§ 231 m/d law provide legal second means of egress and file application for approval before doing the work at 5th sty west 1 apt 5a
Feb 21, 2015
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 25, 2014
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
May 21, 2014 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure 8th tread up at fire escape, 2nd story
May 21, 2014
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the north wall at public hall, 2nd story
Apr 7, 2014
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration , wood paneling at the ceiling and south wall at public hall, 1st story
Apr 7, 2014
Open — Not complied with - CImmediately hazardous
Fire escape defective. properly secure loose & hanging 8th metal tread from bottom up,2nd story balcony.front west fire escape.
Mar 12, 2014
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Dec 31, 2012 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system , , 1st story
Dec 31, 2012
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room in cellar
Dec 31, 2012
Closed — Violation closed
DOB building violations · 13
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 4, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 3, 2015
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 18, 1996
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 18, 1996
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Dec 18, 1996
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jul 30, 1992
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 24, 1989
Dob violation - active
ECB violations · 16
- Class - 2
Failure to comply with commissioner's order contained in summons#39057865j issued on 3/11/2022,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certifica
Aug 26, 2024 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code complaint manner i observed in mazu restaurant in the basement installed pvc piping on waste line under three compartment sink and in boiler room installed pvc pipng and fer
May 11, 2022 · Penalty $625
Active - Class - 1
Found safety relief valve still capped off, failure to correct all hazardous violation on cease use summons #39057866l issued on 3/11/2022, correct all hazardous condition immediately call dob to re inspect in
Apr 22, 2022 · Penalty $1,250
Active - Class - 1
Upon re inspection of a cease use boiler i found it operating w/o correcting hazardous conditions; i cease use boiler again do not put it back into service until all hazardous conditions are corrected+dob is ca
Apr 8, 2022 · Penalty $1,250
Active - Class - 2
Boiler is leaking/spill switch is incorrect/no boiler rating plate/heating circulators defective/debris in boiler room/light defective/incorrect chimney termination cap;correct violation+submit the certificate
Mar 11, 2022 · Penalty $625
Active - Class - 1
Hazardous;boiler safety valve caped/spill switch incorrect/draft inducer not interlocked w/boiler+hwh/draft proving switch interlocked w/boiler+hwh missing/expansion tank defect/feed valve defect;correct all ha
Mar 11, 2022 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in nov #35117416k issued on 3/2/15 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. noted: no c of c filed. remedy: comply w/comm's order &/or fil
Oct 25, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#3517416k issued on 3/2/15 and file a certificate of correction pursuant to 28-201.1,28-204.4 and 1rcny 102-01.rem:comply with the commissioner's
Sep 10, 2015 · Penalty $800
Resolve - Class - 2
Failure to have new or altered plumbing system tested. under appl #102494212 no inspection performed sprinkler application observed on 8/12/15 @9:30am. remedy: have new or altered plumbing system tested.
Aug 12, 2015 · Penalty $500
Resolve - Class - 1
Failure to maintain building in code compliant manner.noted:at front fire escape is obstructed with ac units creating a tripping hazard.building exit door has a key locking device and public exit hallway is fin
Aug 12, 2015 · Penalty $1,000
Resolve
Show 6 more ↓
- Class - 2
Work without a permit.noted:at roof level.installed five skylights forapartments below and apartment 5c has been completely renovated with new ful height partition walls,plumbing and electrical fixtures.rem:obt
Aug 12, 2015 · Penalty $800
Active - Class - 2
Electrical work w/o permit.observed at 9:00 am outlets switches fixtures panels,hvac system on roof in apt.3a,4a,5c,5a,and 2c also highhat fixtures throughout hallways.no application on file for electrical work
Aug 12, 2015 · Penalty $400
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dob for notice of vio#35117416k issued on 3/2/15 pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.
May 20, 2015 · Penalty $800
Resolve - Class - 1
Occupancy contrary to that allowed by the bldg dept records.noted:premises is a five story mixed use bldg w/ newly created "a" line.said "a"line apartment do not have a second means of (egress),no access to fir
Mar 2, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain building in code compliant manner.failure to provide number of required means of egress for every floor per bc 1018.1 and 27.366. noted: "a"line prsent on said premises with only occupancy
Mar 2, 2015 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved const docs or approved amendmentd inthat job#121625679 indicated work in only apts 5a&2c @time of insp work being performed on 3rd,4th & 5th flrs,new inerior partitions, plumbi
Jul 12, 2014 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Apr 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt 2B
Close - Plumbing
Water supply
Jul 2, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Feb 24, 2022 · Apt 4B
Close - Heat/hot water
Entire building
Feb 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 16, 2022 · Apt 4B
Close - Heat/hot water
Apartment only
Feb 14, 2022 · Apt 4B
Close - Heat/hot water
Apartment only
Feb 8, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 11, 2022 · Apt 3C
Close
Show 40 more ↓
- Door/window
Door
Dec 9, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Nov 16, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Dec 18, 2019 · Apt 5A
Close - Heat/hot water
Entire building
Dec 10, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2019 · Apt 5B
Close - Door/window
Window frame
Nov 16, 2019 · Apt 4A
Close - Heat/hot water
Entire building
Nov 16, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 24, 2015 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 23, 2015 · Apt 2B
Close - Safety
Sprinkler
Feb 22, 2015 · Apt 3A
Close - Flooring/stairs
Floor
Sep 13, 2014 · Apt 4C
Close - Flooring/stairs
Floor
Sep 13, 2014 · Apt 4C
Close - Door/window
Door
Aug 30, 2014 · Apt 4C
Close - Paint/plaster
Ceiling
Jul 9, 2014 · Apt 4C
Close - Plumbing
Water supply
Jul 8, 2014 · Apt 4C
Close - General
Mailbox
Jun 17, 2014 · Apt 4C
Close - General
Bell/buzzer/intercom
Jun 17, 2014 · Apt 4C
Close - General
Signage missing
Jun 17, 2014 · Apt 4C
Close - Paint/plaster
Wall
Jun 17, 2014 · Apt 4C
Close - Electric
Wiring
Jun 17, 2014 · Apt 4C
Close - General
Mailbox
Jun 13, 2014 · Apt 4C
Close - Door/window
Door
Jun 13, 2014 · Apt 4C
Close - Door/window
Door
Jun 13, 2014 · Apt 4C
Close - Door/window
Door
Jun 13, 2014 · Apt 4C
Close - General
Bell/buzzer/intercom
Jun 13, 2014 · Apt 4C
Close - Door/window
Door
Jun 13, 2014 · Apt 4C
Close - Electric
Wiring
Jun 13, 2014 · Apt 4C
Close - General
Signage missing
Jun 13, 2014 · Apt 4C
Close - General
Bell/buzzer/intercom
Jun 13, 2014 · Apt 4C
Close - Electric
Wiring
Jun 13, 2014 · Apt 4C
Close - Door/window
Door
May 14, 2014 · Apt 4C
Close - General
Signage missing
May 14, 2014 · Apt 4C
Close - General
Bell/buzzer/intercom
May 14, 2014 · Apt 4C
Close - Door/window
Door
May 14, 2014 · Apt 4C
Close - Heat/hot water
Entire building
Apr 7, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2014 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2014 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 12
- Building area
- 8,425 ft²
- Lot area
- 2,007 ft²
- Zoning
- C1-9
- Community board
- 106
- Council district
- 4
- Block / lot
- 914 / 4
- Assessed value
- $2,096,550
- Landmark / historic district
- No
HPD registration #136062, last renewed Sep 10, 2025.
Questions about 495 3 Avenue
Who owns 495 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 33rd Street Investors Vi LLC.
Does 495 3 Avenue have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 495 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 495 3 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 495 3 Avenue?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.