423 3 Avenue
Manhattan, NY 10016BBL 1-00910-0064Map
Owner of record: 419-423 Third Avenue, LLC
423 3 Avenue is a walk-up apartment building built in 1910 in Manhattan, 10016. It has 8 residential units across 5 floors. The owner of record is 419-423 Third Avenue, LLC. HPD has recorded 24 housing violations here, most recently on June 2, 2023.
- HPD violations
- 24
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 57
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 24
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective entrance door to building , 1 story , 1st story
Jun 2, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule door , 1st story
Jun 2, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building entrance door , 1st story
Jun 2, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Apr 2, 2023 · Apt 2
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 2, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening unacceptable electromagnetic locking device installed at front entrance door to building at public hall, 1st story
Jul 11, 2022
Closed — Violation dismissed - BHazardous
Provide an acceptable heavy lock and latch set at entrance door to building at public hall, 1st story
Jul 11, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand doorstop at front building entrance door at public hall, 1st story
Jul 11, 2022
Closed — Violation dismissed - BHazardous
Provide security in the event of power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door at public hall, 1st story
Feb 11, 2016
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Feb 11, 2016
Closed — Violation dismissed
Show 14 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 11, 2016
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required (light fixtures present)
Jan 5, 2014
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling throughout in the entire apartment located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture in the 2nd room from north at west located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective door ,made of plywood in the entrance located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective exposed electric wire at ceiling in the 1st room from north at west located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective exposed electric wire at ceiling in the 2nd room from north at west located at apt 3, 3rd story, 1st apartment from north at east
Jun 24, 2010 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked at boiler room
Nov 19, 2005
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Nov 19, 2005
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage cans & bags at public hall, 1st story
Nov 10, 2005
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at 1 sty public hall.
Jun 11, 1997
Closed — Violation dismissed - CImmediately hazardous
D26-17.10 adm code provide ready access to building's heating system door 1st sty public hall to cellar locked. \ublic hall.
Aug 6, 1987
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration seal entrance 1 story public hall north center and northeast.
Aug 6, 1987
Closed — Violation dismissed
DOB building violations · 4
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
Flue pipe not properly connected or supported exposed wires chimney base improperly sealed improper support on water piping correct violating conditions and submit certificate of correction
Jul 9, 2019 · Penalty $312
Active - Class - 1
51,3b,15,25a&b,32a,39,40,50a,50b;50a)jump pump must piped and not obstruct boiler rm door;50b)oil burner not running properly causing 500t-fumes to leak intoldg sealed boiler-do not operate boiler until all haz
Nov 28, 2016 · Penalty $1,000
Resolve - Non-hazardous
36. {
Jan 16, 1991 · Penalty $85
Resolve
Complaints
- Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Apr 7, 2025 · Apt 1
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 20, 2024 · Apt 8
Close - Unsanitary condition
Garbage/recycling storage
Aug 22, 2024 · Apt BLDG
Close - Door/window
Door
Sep 12, 2023 · Apt 2
Close - Unsanitary condition
Pests
Mar 20, 2023 · Apt 2
Close - Unsanitary condition
Pests
Mar 13, 2023 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Mar 13, 2023 · Apt BLDG
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Oct 5, 2022 · Apt 3
Close - Heat/hot water
Entire building
Oct 5, 2022 · Apt 3
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt 3
Close - Heat/hot water
Entire building
Apr 24, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2017 · Apt 4
Close - Heat/hot water
Entire building
Dec 5, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2016 · Apt 4
Close - Heat/hot water
Entire building
Dec 5, 2016 · Apt 5
Close - Heat/hot water
Apartment only
Feb 2, 2016 · Apt 2
Close - General
Ventilation system
Feb 2, 2016 · Apt 2
Close - Door/window
Door
Feb 2, 2016 · Apt 2
Close - Nonconst
Vermin
Jul 18, 2011 · Apt 5
Close - Nonconst
Vermin
Jul 18, 2011 · Apt 5
Close - Paint/plaster
Ceiling
Jun 17, 2010 · Apt 3
Close - Paint/plaster
Wall
Jun 17, 2010 · Apt 3
Close - Plumbing
Radiator
Jun 17, 2010 · Apt 3
Close - General
Mold
Jun 17, 2010 · Apt 3
Close - Plumbing
Water-leaks
Jun 17, 2010 · Apt 3
Close - Electric
Wiring
Jun 17, 2010 · Apt 3
Close - Electric
Lighting
Jun 17, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Jun 17, 2010 · Apt 3
Close - Paint/plaster
Wall
Jun 17, 2010 · Apt 3
Close - Paint/plaster
Wall
Jun 17, 2010 · Apt 3
Close - General
Floor
Jun 17, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Jun 17, 2010 · Apt 3
Close - Heating
Heat related
Dec 15, 2007 · Apt 3
Close - Electric
Wiring
Aug 4, 2006 · Apt 3
Close - Electric
Electric-supply
Aug 3, 2006 · Apt 3
Close - Heating
Heat related
Nov 17, 2005 · Apt 5
Close - Heating
Heat related
Nov 17, 2005 · Apt 3
Close - Heating
Heat related
Nov 10, 2005 · Apt 5
Close - Heating
Heat related
Nov 10, 2005 · Apt 5
Close - Heating
Heat related
Nov 8, 2005 · Apt BLDG
Close - Heating
Heat related
Nov 3, 2005 · Apt 6
Close - Heating
Heat related
Oct 29, 2005 · Apt 6
Close - Heating
Heat related
Oct 28, 2005 · Apt 3
Close - Heating
Heat related
Oct 28, 2005 · Apt 7
Close - Heating
Heat related
Oct 27, 2005 · Apt 3
Close - Heating
Heat related
Oct 27, 2005 · Apt 7
Close - Heating
Heat related
Oct 26, 2005 · Apt BLSG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 8
- Building area
- 9,358 ft²
- Lot area
- 2,716 ft²
- Zoning
- C2-8
- Community board
- 106
- Council district
- 2
- Block / lot
- 910 / 64
- Assessed value
- $3,259,350
- Landmark / historic district
- No
HPD registration #136892, last renewed Jul 30, 2026.
Questions about 423 3 Avenue
Who owns 423 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 419-423 Third Avenue, LLC.
Does 423 3 Avenue have violations?
Yes. NYC HPD has recorded 24 housing violations at this property.
Is 423 3 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 423 3 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 423 3 Avenue?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.