150 East 39 Street
Manhattan, NY 10016BBL 1-00894-0052Map
Owner of record: Dryden Hotel Associates,llc .
150 East 39 Street is an elevator apartment building built in 1928 in Manhattan, 10016. It has 135 residential units across 16 floors. The owner of record is Dryden Hotel Associates,llc .. HPD has recorded 4 housing violations here, most recently on February 15, 2022. 2 of the 4 most recent violations are still open.
- HPD violations
- 4
- DOB violations
- 39
- ECB violations
- 18
- HPD complaints
- 25
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
D26-10.01 adm code & 309 m/d law abate the nuisance consisting of drop ceiling cellar passageway.
Jul 25, 1990
Open — Nov certified late - BHazardous
D26-10.01 adm code replace with new the missing fire proof doors pub halls to east service hall & extension halls all stys.
Jul 25, 1990
Open — Not complied with
DOB building violations · 39
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 18, 2022
Dob violation - dismissed - Failure to correct swarmp conditions (facade) facade required
Cycle 9a failure to correct swarmp conditions
Feb 18, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2019
Dob violation - resolved
Show 29 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 1, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2005
Dob violation - resolved - Elevator elevatorrequired
1p36714
Mar 13, 2003
Dob violation - resolved - Elevator elevatorrequired
1p36713
Oct 21, 2002
Dob violation - resolved - Elevator elevatorrequired
1p36714
Nov 22, 2000
Dob violation - resolved - Elevator elevatorrequired
1p36713
Nov 22, 2000
Dob violation - resolved - Elevator elevatorrequired
1p36713
Jan 24, 2000
Dob violation - resolved - Elevator elevatorrequired
1p36714
Jan 24, 2000
Dob violation - resolved - Elevator elevatorrequired
1p36713
Jan 8, 1999
Dob violation - resolved - Elevator elevatorrequired
1p36714
Jan 8, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
51)ristor to proper service safety egle
Oct 12, 1988
Dob violation - resolved
ECB violations · 18
- Class - 2
Time of inspection of 16 story facade work alteration site observed sws at exposure. upon review on sws drawing determine that sidewalk shed installation is contrary to plan, drawing shows only 12' height maint
Jan 25, 2023
Resolve - Class - 2
Time of inspection observed suspended scaffold and materials grounded on sws and super confirmed gc started work and used scaffold. upon further i observed windows/ac not protected as per code. pswo- stop use
Jan 25, 2023
Resolve - Class - 2
Time of inspection of 16 story facade repair alteration site observed close site suspended scaffold grounded on sws. building super confirmed gc started working and used suspended scaffold. upon review on dob
Jan 25, 2023 · Penalty $2,530
Resolve - Class - 2
Time of inspection observed sws in front of building and sws deck was loaded materials such as wood, bricks and prohibited sign.no item shall be stored or placed upon a sidewalk shed unless such shed has been d
Jan 25, 2023
Resolve - Class - 2
2x10 phone inoperative.
Jul 11, 2019 · Penalty $625
Resolve - Class - 2
2x10 phone inoperative.
Jul 11, 2019 · Penalty $625
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #802744.rem:submit required technical report.
May 18, 2018 · Penalty $625
Resolve - Class - 1
Bc3314.15.5:roped and cable protection.all ropes and cable are reqd to be protected from sharp edges.note:at time of inspection i observed suspended scaffold on outrigger beam installed on exp#3 w/installed cab
Oct 17, 2017 · Penalty $1,630
Resolve - Class - 2
Drawings.failure to provide approved/accepted plans construction docs at jobsite at time of inspection.noted:at time of inspection i observed sidewalk shed in place of exp31 w/no approved/accepted plan availabl
Oct 17, 2017 · Penalty $530
Resolve - Class - 2
21i11.31i11 21i rollers release various fls 50m mg covers 35m cover missing 42d timer secure 31i bottom normal limit switch 21m covers interlocks 2nd lobby bsmt
Jun 29, 2009 · Penalty $250
Resolve
Show 8 more ↓
- Class - 2
56y13.58y13.42g09.42b09.28o02.34o02.70o02 42 improperr fuses remove & replace with rated on controller alligator jumper used to place cal;ls#31 remove 28 clean car door track & hangers
Aug 4, 2008
Resolve - Non-hazardous
Failrue to provide 10"x12" elevator landing sighns on allfloors at borht elevator landing. failure to provide 3" elevator ic ssigns on all floors at both elevator landings. remedy: provide signage as per local
Oct 11, 2002 · Penalty $5,000
Resolve - Non-hazardous
22d06-50y14
Aug 15, 2001 · Penalty $350
Resolve - Non-hazardous
46k12-44l11-37g07-50y14-08v01-74x11 46k-replace rusted & oversized hoist ropes.44l-gen arcing at brushes 37g-provide proper size fuses 08v-adjust lev 74x-repair top of car inspection station.
Aug 14, 2001 · Penalty $350
Resolve - Non-hazardous
46m 50y 37b 74o 31q 47o 40 m 14 missing govenor ceal propely seal 50y 14 sealoil ligh 37 b 06 proeprly mount door rimer onto contoroller 74 oo2 dirty car top properly coela 31 q 12 electrical fan wires unquarde
Jul 7, 1999 · Penalty $2,500
Resolve - Non-hazardous
20l, 21l, 50y, 50y, 74o. 20&21-repair hall buttons and indicator lights where necessary. 74--clean top of cab.
Jan 25, 1995 · Penalty $200
Resolve - Non-hazardous
Construction: air conditioning equipment(bld: deyden east) note: air conditioning unit(carrier)(2)water tower system (3)air conditioner & duct system erected in rear area contrary to department rules & regulati
Jul 19, 1994 · Penalty $350
Resolve - Non-hazardous
07x,73#. 73 provide electric eye.(missing)
Dec 16, 1991 · Penalty $75
Resolve
Complaints
- Unsanitary condition
Mold
Sep 18, 2026 · Apt 205
Close - Unsanitary condition
Mold
Jun 19, 2026 · Apt 205
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 604
Close - Plumbing
Basin/sink
Aug 11, 2023 · Apt 710
Close - Plumbing
Toilet
Aug 11, 2023 · Apt 710
Close - Plumbing
Toilet
Jun 4, 2023 · Apt 710
Close - Plumbing
Basin/sink
Jun 4, 2023 · Apt 710
Close - Plumbing
Bathtub/shower
Jun 4, 2023 · Apt 710
Close - Heat/hot water
Apartment only
Dec 27, 2022 · Apt 604
Close - Heat/hot water
Apartment only
Feb 25, 2020 · Apt 203
Close
Show 15 more ↓
- Heat/hot water
Apartment only
Feb 23, 2020 · Apt 203
Close - Heat/hot water
Entire building
Dec 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2016 · Apt 401
Close - Heat/hot water
Apartment only
Jan 5, 2016 · Apt 811
Close - Heat/hot water
Apartment only
Jan 5, 2016 · Apt 811
Close - Heat/hot water
Entire building
Nov 14, 2015 · Apt 501
Close - Unsanitary condition
Pests
Jun 18, 2015 · Apt 203
Close - Nonconst
Vermin
Apr 6, 2011 · Apt 1001
Close - Nonconst
Vermin
Apr 6, 2011 · Apt 1001
Close - Plumbing
Water-leaks
May 6, 2009 · Apt 806
Close - General
Mold
May 6, 2009 · Apt 806
Close - Heating
Heat related
Feb 8, 2007 · Apt 1703
Close - Nonconst
Odor
May 19, 2005 · Apt 207
Close - Heating
Heat related
Oct 22, 2004 · Apt NA
Close - Heating
Heat related
Oct 20, 2004 · Apt S
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1928
- Floors
- 16
- Residential units
- 135
- Building area
- 90,871 ft²
- Lot area
- 7,483 ft²
- Zoning
- R8B
- Community board
- 106
- Council district
- 4
- Block / lot
- 894 / 52
- Assessed value
- $11,259,450
- Landmark / historic district
- No
HPD registration #101635, last renewed Sep 23, 2025.
Questions about 150 East 39 Street
Who owns 150 East 39 Street?
The owner of record in NYC Department of City Planning PLUTO data is Dryden Hotel Associates,llc ..
Does 150 East 39 Street have violations?
Yes. NYC HPD has recorded 4 housing violations at this property.
Is 150 East 39 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 150 East 39 Street built?
City records list 1928 as the year it was built.
How many apartments are in 150 East 39 Street?
It has 135 residential units and 137 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.