East 32 Street
Manhattan, NY 10016BBL 1-00887-0084Map
Owner of record: The Consulate General Of The Republic Of Korea, NY
East 32 Street is a public assembly built in 2019 in Manhattan, 10016. The owner of record is The Consulate General Of The Republic Of Korea, NY. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 8
- ECB violations
- 55
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 15, 1989
Dob violation - dismissed
ECB violations · 55
- Class - 1
Bc3314 inadequate supported scaffold.at time of inspection of 7 story topped off nb under permit #121327484 observed supported scaffold aprox 80 ft at exp #1 interior multiple tullst installed throughout scaffo
Apr 29, 2022 · Penalty $2,500
Resolve - Class - 1
Bc3301.4 inspections-supported scaffold.at time of inspection of 7 story nb under permit #121327484 observed supported scaffold at exp #1 interior aprox 80 ft with multiple violating conditions referred to in o
Apr 29, 2022 · Penalty $2,500
Resolve - Class - 2
Sec. bc 3314.4.5.1 training for supported scaffold inspector. at the time of my inspection,i observed a scaffold that exceed 40'in height atexp#1. after reviewing the pre-shift inspection log observed smit chhe
Mar 18, 2022
Resolve - Class - 2
Sec. bc 3307.4.7 work or storage zone. at time of my inspection,i observed a work/storage zone missing the 18 gage wire mesh or equivalent synthethis netting in multiple araes of exp#1. the netting or mesh is
Mar 18, 2022
Resolve - Class - 1
Work does not conform to approved drawings/plans.at time of inspection of active 7 story building observed supported scaffolds installed on all exp #1 #2 #3 #4. supported scaffold at exp #1 16' opening and apro
Dec 9, 2021 · Penalty $3,125
Resolve - Class - 1
Guardrails missing/inadequate.at time of inspection on 7 story building observed at exp #3 concrete pit aprox 5 x 7 by 6 ft deep located right as soon as you set to the backyard on left side. pit did not have g
Dec 9, 2021 · Penalty $2,500
Resolve - Class - 1
28-110.2 phased site safety plan does not reflect most current construction operations.at time of inspection observed proposed 7 story nb work activity present observed contractor failed to update ssp mechanica
Oct 18, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.at time of inspection observed proposed 7 story new building with work activity present contractor failed to maintain adequate housekeeping and
Oct 18, 2021
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at time of inspection observed proposed 7 story new building complete to roof level with work activity present.observed contra
Oct 18, 2021 · Penalty $625
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection of 7 story nb observed at exp#1 construction fence installed not as per code.observed 8 ft high plywood fence missing vie
Oct 8, 2021
Resolve
Show 40 more ↓
- Class - 1
Bc 3301.6.1 no design drawings for temporary working platform.at time of inspection of a 7 story nb observed working platform installed and ready for use on the stairs between 7th floor and the roof upon reques
Oct 8, 2021 · Penalty $1,250
Resolve - Class - 1
Bc3314.4 supported scf not installed,maintained as per code.atoi of active job 7storynb observed supported scf installed&ready for use@exp1,3,4&inside bldg on 2fl by elevator shaft not as per code supported scf
Jun 9, 2021 · Penalty $625
Resolve - Class - 1
Work does not conform to approved plans.at the time of my inspection at a 7 story building under construction, i observed pipe scaffold in place at exposures 1,2,3&4.upon review of the approved plans for pipe s
May 11, 2021 · Penalty $625
Resolve - Class - 1
Work does not conform to approved plans.at the time of my inspection at 7 story building under construction,i observed pipe scaffold added on to the site safety plan and not on designed drawings.no specs,no det
May 11, 2021 · Penalty $625
Resolve - Class - 1
3314.4.3.5 daily preshift inspection of pipe scaffold.at the time of my inspection at a 7 story building under construction,i observed pipe scaffold at expo1,2,3&4 with violating conditions.upon reviewing the d
May 11, 2021 · Penalty $625
Resolve - Class - 2
Inspections-superintendent.at the time of my inspection at a 7 story building under construction,i observed mutliple unsafe conditions-unsafe site safety plan.generator unprotected on street level.unsafe pipe s
May 11, 2021 · Penalty $2,500
Resolve - Class - 1
3301.7 no design drawings for platforms.at the time of my inspection at a 7 story building under construction,i observed makeshift platformsat exp1 facade of the building for welding and bracing operations.upon
May 11, 2021 · Penalty $625
Resolve - Class - 1
28-110.2 phased site safety plan.at the time of my inspection at a 7 story building under construction,i observed construction operations throughout the jobsite.upon review of the site safety plan,i observed mu
May 11, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35444504z issued on 08/08/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01(d)(2). an acceptible certificate has not yet been fi
Sep 28, 2020 · Penalty $1,250
Resolve - Class - 2
Provision of law:bc3301.4.failure to provide safety strap installationinspection log.as noted:at time of inspection on an active constructi on site.observed safety strap installed from fl#3 to fl#6.yowever no i
Sep 17, 2020 · Penalty $625
Resolve - Class - 2
Failure to provide preapproved detail design drawings.as noted:at timeof inspection on an active construction site,formwork placement work at roof level and car block placement work at expo#2 mechanical room fl
Sep 17, 2020 · Penalty $625
Resolve - Class - 1
Unsafe storage of combustibel material land equipment noted at time of my inspection of a new 7 story building construction in progress at the 2nd/3rd floor level i observed a steel gasoline container approx 10
Mar 5, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3303.7.2-fire extinguishers not maintained as per nyc fire code.noted at time of my inspection of a new 7 story building construction in progress at the 2nd/3rd floor level during my inspection i observed num
Mar 5, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3309.1-failure to protect adjoining structures (general) noted at time of inspection of a new 7 floor level i observed the adjoining property at epxosure #2 had a parapet wall avac units and roof that were le
Mar 5, 2020 · Penalty $625
Resolve - Class - 2
Inspection reports (logs) to be maintained at site noted at time of my inspection of a new 7 story building construction in progress at the 2nd/3rd floor level i observed a sidewalk shed at exposure #1 upon req
Mar 5, 2020 · Penalty $625
Resolve - Class - 2
Construction superintendent failed to perform duties per code noted at time of inspection of a new 7 stroy buidling at 2nd/3rd floor lvele i observed the following violating conditions (1) no adjoining property
Mar 5, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to comply with manufacturers specifications noted at time of my inspection of a new 7s troy building construction in progress at the 2nd/3rd floro elvel i observed numerous jersey barriers at the stagin
Mar 5, 2020
Resolve - Class - 2
Work does not conformed to site safety plans.noted at time of inspection of an active jobsite observed site safety plans show at exp#1 section ssp 0008.00 show barricades with chain link fence on top however ob
Feb 12, 2020 · Penalty $2,500
Resolve - Class - 2
Bc3303.2.3.1/temporary lighting for construction site.noted:at time ofinspection of an active jobsite observed at cellar and sub celalr no temporary lighting which created or hazardous condition for the workers
Feb 12, 2020 · Penalty $1,250
Resolve - Class - 1
Bc3303.9/required means of egress.noted:at time of inspection of an active jobsite.observed at sub cellar cellar and 1 floor from street work site is compromised by materials and debris creating an unclear path
Feb 12, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3305.3.1/safe support at load.noted at time of inspection of an active jobiste.observed at ub cellar and cellar construction material leaning on the shoring.construction material leaning on the shoring can af
Feb 12, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3303.7.2/fire extinguisher;noted:at time of inspection of an active jobsite.observed fire extinguishers missing tags and monthly inspection reports also place on the floor and not as per code.rem:comply with
Feb 12, 2020 · Penalty $2,500
Resolve - Class - 1
Failure to maintain display on site documents required by bc chapter 33.noted:at time of inspection of an active jobsite upon request to seethe crack monitoring report it was dated 1/31/20 and no was provided f
Feb 12, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.noted:at time of inspection of an active jobsite.observed at cellar levelinadequate housekeeping which made up of garabage bags filled with con
Feb 12, 2020 · Penalty $1,250
Resolve - Class - 1
Bc 3314.5 platform not fully planked.note: @the time of my inspection of a 7 sty proposed mew building @the excavation pahse, i observed workers working on supported pipe scaffold @exp 2 & 4 @the rear. i also
Aug 15, 2019 · Penalty $2,500
Resolve - Class - 1
3314.13.1 missing crossbracing on supported pipe scaffold note: @the time of my inspection of a 7 sty proposed new bldg @the excavation phase, i observed worker working on supported pipe scaffold @exp2(rear)
Aug 15, 2019 · Penalty $2,500
Resolve - Class - 1
3314.8.1 missing guardrails. note: @the time of my inpsection of a proposed 7 sty new building under const @the excavation phase, i observed a workers using supported pipe scaffold @exp2 & 3. i also observed
Aug 15, 2019 · Penalty $2,500
Resolve - Class - 2
Sec. 3301.02(d) logs. note: at the time of my indspection at a 7 sty new bldg at the excavation phase w/construction activity upon request to competent person,none was provided. remedy: provide & maintain logs
Aug 8, 2019 · Penalty $620
Resolve - Class - 2
Failure to perform proper concrete washout procedures at site.collection of containment.as noted:at time of inspection active site.foundation level i observed concrete wash out water was allowed to enter 1 each
Jun 5, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to perform duties.lateral support adjoing bldg exp#4 not on a set of approved drawings.support completed before approval.provide approved set of drawings for lateral support.no work exp#4 10ft leading e
Apr 2, 2019
Resolve - Class - 2
Failed to provide approved drawings.at time of inspection observed a lateral support to adjacent building @ exp #4 according to p.e. andrew b renfroe vibration monitors were showing lateral and vertical movemen
Apr 2, 2019 · Penalty $312
Resolve - Class - 1
Failure to ensure each worker has successfully completed required training.at time of inspection permit holder failed to ensure each construction or demo worker successfully completed required training under bc
Mar 18, 2019
Resolve - Class - 1
Failure to ensure each under worker has successfully completed required training.at time of inspection permit holder failed to ensure each construction or demo worker successfully completed training under bc 33
Mar 18, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to ensure each worker has successfully completed required training.at time of inspection permit holder failed to ensure each construction or demo worker successfully completed training under bc 3321.1.i
Mar 18, 2019
Resolve - Class - 1
Failure to ensure each worker has successfully copleted required training.at time of inspection permot holder failed to ensure each construction or demo worker successfully completed training under bc 3321.1.i
Mar 18, 2019
Resolve - Class - 1
Failure to produce the daily log for inspection at time of inspection permot holder wh is currently working on nb permit #12127484 failed to procude for inspection the daily log that is required bc bc3321.2 ite
Mar 18, 2019 · Penalty $2,500
Resolve - Class - 1
Failue to ensure each worker has successfully completed required training.at time of inspection owner failed to ensure each construction or down worker successfully compelted required training under bc 3321.1.i
Mar 18, 2019
Resolve - Class - 1
Failure to ensure each worker has successfully completed required training.at time of inspection owner failed to ensure each construction or demo bc 3321.1.i observed worker elson pilgrim at this building site
Mar 18, 2019
Resolve - Class - 1
Failure to ensure each worker has successfully completed required training.at time of inspection owner failed to ensure each construction or demo worker successfully completed required training under bc 3321.1
Mar 18, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to ensure each worker has successfully completed required training.at time of inspection owner failed to ensure each construction or new worker successfully completed required training under bc 3321.1.i
Mar 18, 2019
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Public assembly (P9)
- Year built
- 2019
- Floors
- 7
- Residential units
- —
- Building area
- 29,117 ft²
- Lot area
- 6,419 ft²
- Zoning
- C6-2A
- Community board
- 105
- Council district
- 2
- Block / lot
- 887 / 84
- Assessed value
- $6,294,600
- Landmark / historic district
- No
Questions about East 32 Street
Who owns East 32 Street?
The owner of record in NYC Department of City Planning PLUTO data is The Consulate General Of The Republic Of Korea, NY.
Does East 32 Street have violations?
NYC HPD has no housing violations on record for this property.
Is East 32 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was East 32 Street built?
City records list 2019 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.