10 East 40 Street
Manhattan, NY 10016BBL 1-00869-0066Map
Owner of record: Robnet 40th Street .
10 East 40 Street is an office building built in 1928 in Manhattan, 10016. The owner of record is Robnet 40th Street .. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 251
- ECB violations
- 56
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 251
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 7, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Apr 6, 2021
Dob violation - dismissed
Show 40 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Feb 21, 2019
Dob violation - dismissed - Construction other optional
The borough commissioner has issued a stop work order for permit #1230 48572 due to applicant of records withdrawal
Nov 5, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2018
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed
ECB violations · 56
- Class - 2
A.c. 27.929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by aregistered design professional in an office building 100 feet or more
Jun 17, 2024 · Penalty $6,250
Active - Class - 2
27-929.1 failure to complete installation of full system of automatic sprinklers & file final sprinkler report prepared by registered designprofessional in office bldg 100 ft or more in height in existence on
Feb 28, 2023 · Penalty $3,125
Active - Class - 1
Failed to notify the dept of an accident or incident that resulted in a fatality or injury.note two workers using a baker when both workers fell from the scaffold.workers were sent to hospital.as per check of t
Feb 24, 2023 · Penalty $5,000
Resolve - Class - 1
Observed a broken & a ready baker scaffold on 25th floor without guard rail in place. fdny reported 2-workers fell from scaffold & injured while installing drop ceiling sheetrock which heights approx. 7'-0" fro
Jan 17, 2023 · Penalty $6,250
Resolve - Class - 2
Sec. ac 27-929.1 failure to complete the installation of a full systemof automatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in
Nov 1, 2021 · Penalty $3,125
Active - Class - 2
Failure to maintain/display onsite documents required by bc chapter 33noted:at the time of my inspection at a 47 story active facade restoration jobsite i observed 2 c-hook suspended scaffolds up in use.upon re
Aug 24, 2021 · Penalty $625
Resolve - Class - 1
Bc 3314.15.2 stirups/hangers noted:at the time of my inspection of active 47 story facade restoration jobsite i observed stirups moved about2 feet to 3 feet from the end of platform.(code states min ginch max 1
Aug 24, 2021 · Penalty $625
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at time of inspection of an active 47 story facade restoration project observed the following conditions contrary to site safe
Aug 3, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain onsite documents required by bc chapter 33.at timeof inspection of an active 47 story facade restoration project;on request to review the occupant protection plan-none was provided.rem:maint
Aug 3, 2021 · Penalty $625
Resolve - Class - 2
Failure to to maintain/display on site documents required by bc chapter 33.noted:at time of inspection of an active jobsite.upon request to see the site specific orientation for each work at the jobsite,tools
May 7, 2021 · Penalty $625
Resolve
Show 40 more ↓
- Class - 2
Responsibility for maintenance & use note:at time of inspection observed a sidewalk shed in place @expo.#1,upon observation viewed the parapet out of plumb & not secure & damage.the vertical columns that suppor
May 7, 2021 · Penalty $620
Resolve - Class - 2
27-929.1 ac27-929.1,failure to complete installation of full system ofautomatic sprinklers&file final sprinkler report prepared by registered design professional in office bldg 100' or more in ht in existence o
Mar 30, 2021 · Penalty $10,000
Active - Class - 1
Failure to maintain display on site documents required by chapter 33. noted at the time of my inspection 1 no c hook design for suspended scaffold 2 no design for the tieback points of () and location three no
Dec 23, 2020
Resolve - Class - 2
Sec. 27-929.1 ac 27-929.1 failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg
Mar 30, 2020 · Penalty $3,125
Active - Class - 2
Sec. a.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg 100 feet
Nov 15, 2019 · Penalty $1,250
Active - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control #802538.rem:submit required technical report.
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
56y13 2m7 68b7 56y13-hoist machine oil leak. 2m7-elevator phone missing 68b7-maintenance log not up to date
Sep 26, 2017 · Penalty $500
Resolve - Class - 1
Cu- 56i10 - heavy working on commutator while on motions. repair.
Jun 10, 2016 · Penalty $1,000
Resolve - Class - 2
52k11 hoistway ropes rusted, replace
Jun 10, 2016
Resolve - Class - 2
Work does not conform to approved const docs-site safety plan.note:contrary to site safety plan,site safety mgr does not have osha card on him(nor a copy)as required.rem:stop all exterior work.comply w/site saf
Sep 19, 2014 · Penalty $250
Resolve - Class - 1
3310.3 fail to have site safety plan & program as req.obs 5 workers on site.note:full set of site safety plan is not available upon req:only 2 pages out of 5 on site.pswo issued/posted @premises.rem:stop all ex
Sep 16, 2014 · Penalty $1,600
Resolve - Class - 1
Fail to have site safety mgr as req.obs 5 workers on site.note:removal of bricks:exposing metal beams in stairwell in prog.no ssm on site.sign in sheet shows ssm left @1pm.no ccd-1 avail(for p/t ssm)pswo issued
Sep 16, 2014 · Penalty $1,200
Resolve - Class - 1
3310.8.3 fail to comply site safety rule stated by commisioner-site safety mgr log book.note:log book on site is not as per code,illegible.pswo issued/posted on premises.rem:stop all ext. work.comply w/code to
Sep 16, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations-partial swo issued pursuant to 28-207.2 and posted at premises @ time of inspection,an incident occurred during facade operations
Jun 20, 2012 · Penalty $2,400
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required noted michael a hearty #382 license expired 8/7/11 stop all exterior work rem: work all exterior work provide site safety manager call best
Nov 22, 2011 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved site safety plans. as noted: at time of inspection at above active facade alteration site observed facade work in progress at east elevation w/suspended scaffold. site safety
Jun 1, 2011 · Penalty $1,000
Resolve - Class - 1
Failure to have safe safety manager or coordinator present as requiredat time of insp appx 15workers active in removing lintels and installing bricks at various floors 40th 36th 12th & 43rd no site safety mana
Apr 28, 2011 · Penalty $2,400
Resolve - Class - 1
3310.3 failure to have site safety plan and program as required noted no site safety plan and programs at site appx 15workers doing facade work at the 40th fl rem: stop all exterior work obtain site safety plan
Apr 28, 2011
Resolve - Class - 2
05m7.29d6.71x10.07d6.79o2.05 2 speed car door eccentric missing provide 29d cover secure 79o compensation ropes
Jun 16, 2009
Resolve - Class - 2
50aa02.11l11.50aa02 clean carbon bld-up on generator 11l11 replace all missing lights both indicators and car station ans direction arrows
Jun 3, 2009 · Penalty $500
Resolve - Class - 2
42l09.11x10 42l remove jumpwer wire from controller green relay 57i09 remove wire nuts from brushes both on hoist motor and generator 50aa02 clean carbon bld-up 11x10 replace light on indicator and car buttons
Jun 3, 2009 · Penalty $500
Resolve - Class - 1
Failure to comply with an order to stop work by the dept stop work order 022409c05vp01+02 issued for flrs basement 001 002 partical lift to do safety work at time of inspection new windows lovers being
Mar 5, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation. noted: no fire separation between classrooms & construction site at basement level. no exit signs for staircase (p) between basem
Feb 24, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at basement level exit passageway obstructed by construction material & tools. remedy: remove obstruction.
Feb 24, 2009 · Penalty $1,200
Resolve - Class - 2
100bb05.79h11.39x10.39o02 100bb05 2yr test tag expired 79h11 replaced worn compensation ropes 39x10 top of car light not working 39o02 clean car top
Nov 17, 2008
Resolve - Class - 1
Failure to file affidavits and/or comply w/other requirements set forth for photoluminescent exit path marking.remedy:comply w/requirements of reference standards (rs) 6-1.
Sep 25, 2008
Resolve - Non-hazardous
84b01,86bb05,03b10.84-car switch is not self-centering adjust.86-2yr tag expired.03-annunciator not working for all floors,repair.
Oct 1, 2007 · Penalty $180
Resolve - Non-hazardous
81bb05. 81)current five year test tag is missing-expired tag
Apr 7, 2003
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in intial ll11/98 report. remedy : file an
May 3, 2002
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an
Mar 4, 2002
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Jan 31, 2002
Resolve - Hazardous
Failure to file an amended round four report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Dec 7, 2001
Resolve - Hazardous
Failure to maintain exterior building wall(hazardous)defect is:air conditioners mounted in windows improperly at north and east elevations in various areas.remedy:provide all required protection and permits and
Aug 23, 2001
Resolve - Hazardous
Work without permit noted at nw corner 11th floor.parapet being repaired.bricks removed,covered with tarp.remedy:obtain permit or restore to prior legal condition.stop all work immediately.
Apr 11, 2001 · Penalty $800
Resolve - Hazardous
Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.rem:file an amended repo
Mar 16, 2001
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indication correction of hazardous conditions described in initial ll10/80 report.remedy:file an a
Feb 2, 2001
Resolve - Hazardous
Failure to file amended round 5 report aceptable to this dept. pursuant to rule rcny 32-03b(5) indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file amended report foll
Oct 30, 2000 · Penalty $400
Resolve - Non-hazardous
74x, restore to full service or dis mantle untill a full inspection can be made.
Jan 7, 1999
Resolve - Non-hazardous
Occupancy contrary to that allowed by certificate of occupancy # 72324/1972, 6 floor use at present is an assembly plant/ manufacture co. old use was library. remedy: discontinue illegal occupancy.
Jun 12, 1997 · Penalty $800
Resolve - Non-hazardous
Failure to obtain equipment use permit for a/c unit ceiling mount remedy: obtain equipment use permit from department of buildings or remove unit.
Feb 13, 1997
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1928
- Floors
- 48
- Residential units
- —
- Building area
- 442,042 ft²
- Lot area
- 14,714 ft²
- Zoning
- C5-2.5
- Community board
- 105
- Council district
- 4
- Block / lot
- 869 / 66
- Assessed value
- $41,774,400
- Landmark / historic district
- No
Questions about 10 East 40 Street
Who owns 10 East 40 Street?
The owner of record in NYC Department of City Planning PLUTO data is Robnet 40th Street ..
Does 10 East 40 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 10 East 40 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 10 East 40 Street built?
City records list 1928 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.