roofy

152 Madison Avenue

Manhattan, NY 10016BBL 1-00862-0016Map

Owner of record: Heskel's Paramount, LLC

152 Madison Avenue is an office building built in 1929 in Manhattan, 10016. The owner of record is Heskel's Paramount, LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
83
ECB violations
43
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 83

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner. note: observed at view area exposure 1 east elevation defect at window lintel and sill. 38th floor. exposure 2 defected window lintels. exposure4 bulging at parapet & vertical crack north east corner. roof: bulging, cracks, spalling erroded joints. remedy: repair and/or replace

    Apr 24, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner large verticle crack at the corner of exposure#4 spalled stone on expo#1@ground level spalled/spalling brick work building brick work damaged masonry at all exposuresdamaged mortar joints and bulging brick at roof level step crack andspalled brick remedy maintain bldge fix or replace

    Dec 19, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order due to large verticle corner of expo#4 spalling coating on stone work&spalling stone on exp#1grd levelspalling/spalled brick work.bulging brick work,damaged @ firestair on exp##3 all expo damaged mortar joints& bldge brick on exp#4 bulging brick@ roof remedy immed.repair/take down any loose material under direct supervlic prof

    Dec 19, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.observe large verticle crack@corner of exposures/and 4 spalling coating on stone work&spalled stone on exp#1 @ground level.spalled/spallingbrick work building brick work,damaged masonry @fire stairs all @ exp#3damage mortar joints&bulging on exp#4 remedy:maintain building fix or replace

    Aug 24, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
Show 40 more ↓
  • Construction other optional

    Failure to maintain building in code compliant manner:exposure 1 east elevation damage at 1 flr corner and 2ndcrack window pane at lower flr exposure#2spall at lower window sills and at 3 flr damaged at lintel expposure damaged masonry@ emergency fire stairs.bulging 4 flr corner of 1&4.remedy:maintain building repair and or replace

    May 19, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 8c unsafe report filed

    May 11, 2021

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9c unsafe report filed

    May 11, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 31, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 31, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 31, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 31, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 26, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    Cease use

    Jul 26, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 16, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2014

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 6, 2014

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7c technical report by 02/21/2013

    Dec 31, 2013

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed

ECB violations · 43

  • Class - 2

    At time of inspection, observed unlawful commercial sign installed on sidewalk shed parapet at the corner of exp#1 & 2, contrary to code specifications.

    May 9, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 8c and 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #902456. agg1: prior nov 37026113m under

    Apr 20, 2026 · Penalty $3,125

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8c and 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#902456.agg1:prior nov 37022118n under 28

    Jan 16, 2024 · Penalty $3,125

    Active
  • Class - 2

    Failure to maintain building wall(s)or appurtenances.note:at the time of inspection observed 1 crack window glass panel at 3rd floor level above the sidewalk shed at expo#2 south elevation.2 expo#2 south elev.v

    Jun 8, 2023 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain exterior building facade & appurtenances.observed on exp #2 of bulkhead deteriorated mortar joints exp #3 has bulging & displaced stones & deteriorated mortar joints.exp #4 there is loose &

    Mar 7, 2023 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain exterior building facade & appurtenances.observed on exp #2 of bulkhead deteriorated mortar joints exp #3 has bulging & displaced stones & deteriorated mortar joints.exp #4 loose & cracked b

    Mar 7, 2023 · Penalty $1,250

    Active
  • Class - 1

    Failue to maintain exterior bldg facade & appurtenances. 1)at south elevation,exp#2 observed cracked bricks & deteriorated mortar joints at bulkhead facing stret(e. 32 st). 2)at west elevation exp#3 observed

    Mar 5, 2022 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain building in code compliant matter. noted: commercial space on ground floor "florim"has two broken and cracked store front windows along madison ave., repair and/or replace

    Jan 5, 2022 · Penalty $312

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle8c report indicating correction of unsafe conditions described in initial facades report required by28-302.5 for control#802456.file acceptable report

    Oct 8, 2021 · Penalty $1,250

    Active
  • Class - 1

    Perform brake maintenance and provide brake tag with full date entered mm/dd/year., provide up to date elevator maintenance log book ( last entry was 3/25/21 and enter brake date in full mm/dd/year )., cease us

    Sep 15, 2021 · Penalty $1,250

    Resolve
Show 33 more ↓
  • Class - 2

    Failure to comply w/ commissioner's order contained in summons/vio#35365870n,issued on 9-26-19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissioners order

    Mar 17, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. at time of inspection observed exposure#1 by the exposure#4 corner joint degraded mortar joint vertically also by the front entrance door wall bea

    Mar 17, 2021 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35365870n issued on 09/26/19 & to file a cert of correction pursuant to 28-2011 & 1rcny 102-01(d)(2). remedy: file a cert of correction.

    Jun 29, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35365388p issued on 02/16/19 & to file a cert of correction pursuant to 28-2011 & 1rcny 102-01(d)(2). remedy: file a cert of correction.

    Jun 29, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Sec. 27-929.1 ac 27-929.1 failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg

    Mar 30, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#802118. remedy: submit acceptable require

    Feb 13, 2020 · Penalty $1,250

    Active
  • Class - 2

    Sec. a.c.27-929.1,failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg 100 feet

    Nov 15, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to take immediate safety measures where required to protect and secure public safety,from documented unsafe facade as per 1rncy-103-04.observed on exposure 3 facing west concrete beams on each floor wit

    Sep 26, 2019 · Penalty $10,000

    Active
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observe exposure 1 east elevation (madison av) crack/missing brick at 14 floor and crack/loose/damage masonry fac

    Feb 16, 2019 · Penalty $2,500

    Active
  • Class - 2

    98bb05,69m07,56b10,74o02.(56b10)eliminate hoist machine knocking noise.(74o02)clean cwt rails in pit area.

    Nov 1, 2010

    Resolve
  • Class - 2

    98bb05,69m07,74o02.(74o02)clean cut rails in pit area.

    Nov 1, 2010

    Resolve
  • Non-hazardous

    83x10,63t15.83x10-repair elevator & return to service so that proper inspection can be made.

    Apr 23, 2007 · Penalty $2,500

    Resolve
  • Non-hazardous

    83x10 83-repair elevator & return to service for proper inspection to be made.

    Jul 21, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    83x10 83-repair elevator & return to service for proper inspection to be made.

    Jul 21, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    Noted: failure to post contractor's sign. remedy: provide contractor'ssign.

    Feb 2, 2006 · Penalty $500

    Resolve
  • Hazardous

    Noted: upper sidewalk shed side panels erected to 12 ft height contrary to approved plans under 103966139 alt 3, issued 07/21/05 approved 11-15-04, expired 12/31/05. remedy: conform to plan or amend plan.

    Feb 2, 2006 · Penalty $500

    Resolve
  • Non-hazardous

    Noted: failure to post permit holder sign as required by admin. code- noted permit # 103932997 & expiration date 07-15-05 information does not pertain to this site. remedy: post sign as required.

    Feb 2, 2006 · Penalty $200

    Resolve
  • Non-hazardous

    Failure to obtain permit for temp. constr. a - sidewalk shed permit #103946239 issued & expires 12/31/05. remedy: obtain permit.

    Jan 20, 2006 · Penalty $250

    Resolve
  • Non-hazardous

    Outdoor sign is contrary to approved plan. note: approximately 1700 sqft of advertising sign observed on the sidewalk shed contrary to the approved plan. remedy: remove illegal sign.

    Sep 6, 2005

    Resolve
  • Non-hazardous

    Having installed prohibited advertising sign. note: approximately 1700sq ft of advertising sign was observed on the sidewalk shed at this address. remedy: remove illegal sign.

    Sep 6, 2005

    Resolve
  • Non-hazardous

    Having installed an advertising sign without a permit. note: advertis-ing sign of approximately 1700 sq ft has bee installed on the sidewalkshed without a permit. remedy: obtain permit or remove sign.

    Sep 6, 2005 · Penalty $800

    Resolve
  • Non-hazardous

    Work contrary to approved plan and application. wall of the sidewalk shed has been erected to an height of 12' contrary to the approved plan. remedy: conform to plan.

    Sep 6, 2005

    Resolve
  • Hazardous

    Licensed rigger designed an unqualified foreman.

    Aug 8, 2005 · Penalty $500

    Resolve
  • Hazardous

    Using rigging equipment w/o a special rigger's license.

    Aug 8, 2005

    Resolve
  • Non-hazardous

    Failure to maintain building. noted: at 21st floor south-water penet- ration & leaking causing failure of suspended ceiling tiles, wiring exposed, paint of sub floor peeling & chipping. several ceiling tiles

    Aug 31, 1999

    Resolve
  • Non-hazardous

    Dangerous places & things-razor wire. noted: razor wire attached to side enclosure panels of sidewalk shed erected on east & south facadesdisplaced & fallen loose in various locations throughout.

    Jul 13, 1999 · Penalty $500

    Resolve
  • Hazardous

    No permit for sidewalk shed. noted: sidewalk shed erected along east & south facades of premises. remedy: obtain all proper permits or remove shed immediately.

    Jul 13, 1999

    Resolve
  • Non-hazardous

    Work w/o permit. noted: sidewalk shed erected along east & south facades of bldg w/o permit. remedy: obtain all proper permits & approvals from this dept or remove sidewalk shed immediately!

    May 6, 1999 · Penalty $250

    Resolve
  • Hazardous

    Side walk shed unsafe. noted at north eand of shed on madison ave end panel displaced and hanging away from main frame approx 18", ply-wood shows signs of decay throughout, razor ribbon not secure throughout va

    Feb 23, 1999

    Resolve
  • Non-hazardous

    Work without a permit, expired. noted side walk shed erected and 152 madison ave and along 32 st under permit number 101559831 expired 4-1-98. obtain proper permits or remove shed.

    Feb 23, 1999

    Resolve
  • Non-hazardous

    Work w/o a permit. expired sidewalk shed permit #101559831 expired 1-13-98. remedy: renew permit.

    Dec 3, 1998

    Resolve
  • Non-hazardous

    Failure to maintain. at the 17 floor the sill and slate windoow masonery loose and defective. remedy: repair window in safe and lawful manner.

    Oct 31, 1997 · Penalty $1,000

    Resolve
  • Non-hazardous

    46h

    May 30, 1991 · Penalty $75

    Resolve

Complaints

  • Safety

    Fire escape

    Mar 15, 2017 · Apt BLDG

    Close
  • Safety

    Fire escape

    Mar 15, 2017 · Apt REAR

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O4)
Year built
1929
Floors
22
Residential units
—
Building area
98,847 ft²
Lot area
4,686 ft²
Zoning
C5-2
Community board
105
Council district
4
Block / lot
862 / 16
Assessed value
$11,020,050
Landmark / historic district
No

Questions about 152 Madison Avenue

Who owns 152 Madison Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Heskel's Paramount, LLC.

Does 152 Madison Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 152 Madison Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 152 Madison Avenue built?

City records list 1929 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.