47 East 30 Street
Manhattan, NY 10016BBL 1-00860-0034Map
Owner of record: NYC Tower 2619 Holdings LLC
47 East 30 Street is a mixed residential and retail building built in 1915 in Manhattan, 10016. It has 5 residential units across 4 floors. The owner of record is NYC Tower 2619 Holdings LLC. HPD has recorded 35 housing violations here, most recently on May 8, 2023. 21 of the 35 most recent violations are still open.
- HPD violations
- 35
- DOB violations
- 13
- ECB violations
- 4
- HPD complaints
- 131
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- BHazardous
Remove all encumbrances consisting of household items and rubbish at public hall, 3rd story
May 8, 2023
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items and rubbish at public hall, 4th story
May 8, 2023
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall stairs, 2nd story
Feb 10, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, south and west walls at public hall stairs, 2nd story
Feb 10, 2022
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall stairs, 1st story
Feb 10, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, west and north walls at public hall stairs, 1st story
Feb 10, 2022
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at east wall at public hall, 2nd story
Feb 10, 2022
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceeding 130 degrees farenheit at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south
Nov 21, 2021 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Sep 28, 2021 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Sep 28, 2021 · Apt 3
Open — Nov sent out
Show 25 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Sep 28, 2021 · Apt 3
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent material at south and west walls at public hall, 2nd story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south and west walls at public hall, 2nd story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling, north and west walls at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north and west walls at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Sep 28, 2021
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Jun 3, 2021 · Apt 3
Closed — Violation closed - BHazardous
Replace with new the broken or defective broken glass at ceiling skylight in the 3rd room from north located at apt 5, 4th story, 1st apartment from north at east
Mar 18, 2021 · Apt 5
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and east wall in the kitchen located at apt 5, 4th story, 1st apartment from north at east
Mar 18, 2021 · Apt 5
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5, 4th story, 1st apartment from north at east
Mar 18, 2021 · Apt 5
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5, 4th story, 1st apartment from north at east
Mar 18, 2021 · Apt 5
Open — Nov sent out - BHazardous
Properly repair the broken or defective ceiling light fixture in the private hallway located at apt 5, 4th story, 1st apartment from north at east
Mar 18, 2021 · Apt 5
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Mar 16, 2021 · Apt 3
Open — Nov sent out - BHazardous
Replace with new the missing wood baluster at at public hall stairs, 3rd story
Oct 24, 2016
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective painted sprinkler head at public hall stairs, 3rd story
Oct 24, 2016
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective painted sprinkler head at public hall stairs, 1st story
Oct 24, 2016
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Oct 24, 2016
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective marble saddle in the bathroom located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the kitchen located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed - BHazardous
Properly secure the loose light switch at west wall in the 1st room from north at west located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 4th story
Oct 24, 2016
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective handrail at public hall stairs, 1st story
Oct 24, 2016
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5, 4th story, 1st apartment from south at west
Oct 24, 2016 · Apt 5
Closed — Violation dismissed
DOB building violations · 13
- Construction other optional
At time of inspection observed approx. 12" hole and cracks on sidewalk concrete through front vault. also observed i-beams & metal decking for sidewalk concrete rotted, section missing, deteriorated and severely damaged inside the vault & structural stability compromised.
Oct 11, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Construction other optional
Due to drill bit penetrating wall during tie back at the east wall of apt. 4, the following damage has occurred. broken plaster and molding damage between the ceiling and the wall adjacent to the kitchen
Nov 24, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 4
- Class - 1
At time of inspection observed active demolition site. upon inspecting site observed inadequate housekeeping on entire site. accumulating debris were blocking egress paths and creating tripping hazards. also o
Sep 2, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection observed approx. 12" hole and cracks on sidewalk concrete through front vault. also observed i-beams & metal decking for sidewalk concrete rotted, section missing, deteriorated and severel
Oct 11, 2023 · Penalty $25,000
Active - Class - 3
Failure to maintain building code compliant. noted: at the front, there is masonry step cracking under the windows of the third and fourth floors on the right side., repair and or replace; comply with code. rep
Jul 3, 2023 · Penalty $500
Active - Non-hazardous
B4a/32a/44a/50/50a/50b/50c/50d/50e/50f/.50-storage in boiler room.50a-dedicated fresh air to boiler room only,missing also fire damper missing.50b-both pressure control piped to boiler on one 1/4 pipe.
Mar 7, 2007 · Penalty $180
Active
Complaints
- Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Safety
Fire escape
Nov 10, 2023 · Apt 3
Close
Show 40 more ↓
- Plumbing
Basin/sink
Nov 10, 2023 · Apt 3
Close - Unsanitary condition
Mold
Nov 10, 2023 · Apt 3
Close - Safety
Carbon monoxide detector
Nov 10, 2023 · Apt 3
Close - Electric
No lighting
Nov 10, 2023 · Apt 3
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt 3
Close - General
Ventilation system
Nov 10, 2023 · Apt 3
Close - Door/window
Window frame
Nov 10, 2023 · Apt 3
Close - General
Cabinet
Nov 10, 2023 · Apt 3
Close - Paint/plaster
Radiator
Nov 10, 2023 · Apt 3
Close - General
Bell/buzzer/intercom
Nov 10, 2023 · Apt 3
Close - Paint/plaster
Cabinet
Nov 10, 2023 · Apt 3
Close - Unsanitary condition
Pests
Nov 10, 2023 · Apt 3
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2023 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Dec 9, 2025 | Non-market transfer | Rentals - 4-10 unit | 6 |
| Sep 18, 2025 | $4,100,000 | Rentals - 4-10 unit | 6 |
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1915
- Floors
- 4
- Residential units
- 5
- Building area
- 5,320 ft²
- Lot area
- 2,067 ft²
- Zoning
- C6-4A
- Community board
- 105
- Council district
- 2
- Block / lot
- 860 / 34
- Assessed value
- $1,676,700
- Landmark / historic district
- No
Questions about 47 East 30 Street
Who owns 47 East 30 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Tower 2619 Holdings LLC.
Does 47 East 30 Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 47 East 30 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 47 East 30 Street built?
City records list 1915 as the year it was built.
How many apartments are in 47 East 30 Street?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.