roofy

259 5 Avenue

Manhattan, NY 10016BBL 1-00858-0078Map

Owner of record: 261 Fifth Avenue Tic

259 5 Avenue is an office building built in 1929 in Manhattan, 10016. The owner of record is 261 Fifth Avenue Tic. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
162
ECB violations
61
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 162

  • Construction other optional

    Ftm bldg. observed at exp 1 w.elev 5th floor spandrel erroded mortar joints. exp 3 erroded mortar joints. exp 4 s.elev loose metal flashing on chimney crack in chimney brickwork, damaged mortar joints. remedy: repair and/or replace defective conditions

    Feb 27, 2026

    Dob violation - active
  • Construction other optional

    Ftm bldg.at the time of inspection observed on exp 2, cracks in lintel at 2nd fl: open mortar joints and cracks in water table masonary. exp 3; damaged spalled stone above head height to the right of rear entrance. remedy: repair and/or replace

    Feb 19, 2026

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Failure to correct swarmp conditions

    Aug 1, 2024

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    May 30, 2024

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 3, 2021

    Dob violation - resolved
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Nov 12, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2018

    Dob violation - resolved
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 26, 2018

    Dob violation - resolved
  • Landmark none

    Landmk-landmark none

    Apr 9, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 7, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 31, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 30, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 5, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 5, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2011

    Dob violation - resolved

ECB violations · 61

  • Class - 2

    Failure to maintain exterior building facade and appurtenances.note:attime of inspection i observed inadequate repairs on cracked terra cotta at exposure#2 north elevation approx.10th floor as well as cracked s

    Feb 19, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Incident occurred while hoisting materials off sidewalk shed to street level, the worker on street level injured for lack of communication between both workers. no materials hoisting operation mentioned on pre-

    Jun 16, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #902408. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more in he

    Mar 30, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Sec. 27-929.1 failure to complete the installation of a full system ofautomatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in heig

    Sep 29, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to file a final inspection for completed work within 1 year ofpermit expiration.premises under p.c alt 2#120330784 which permits expired 10/29/10 application filed for interior renovations @ 14th level

    Mar 29, 2018

    Resolve
  • Class - 2

    Failure to safeguard all persons & property affected by construction operation. note: observed sidewalk shed is in progress at installation at exp#1(5 ave)sidewalk shed is installing in full width of the sidewa

    Mar 30, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Daily construction report does not include scaffold inspection. no complete maintenance log-book. rem: maintain daily inspection records/ comply with code.

    Nov 17, 2008 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide signage. no contractors sign. remedy: comply with code.

    Oct 27, 2008 · Penalty $400

    Resolve
  • Class - 2

    Failed to notify the department prior to use/installation of 'c' hooks. remedy: comply with code.

    Oct 27, 2008 · Penalty $400

    Resolve
Show 40 more ↓
  • Class - 2

    Failure to safeguard persons property. effected by construction operations. contractor working on (work) elevation not adequate sidewalk sh ed protection. extend shed 20ft past bldg structure. remedy: comply w/

    Oct 27, 2008 · Penalty $1,200

    Resolve
  • Class - 3

    52b11.100i10 5b replace undersized hoist ropes 100i repair damaged secondary ladders

    Aug 29, 2008

    Resolve
  • Hazardous

    Sec 26-127. dangerous bldg places & things. noted: excavating & drilling (casous) @ site. excavation @ emergency street approx 10 deep no design drawing for shoring. workers inside & outside of shored area &

    Sep 27, 2007 · Penalty $2,500

    Resolve
  • Hazardous

    Using rigging equipment w/o proper danger signs.

    May 5, 2006 · Penalty $500

    Resolve
  • Non-hazardous

    58y11/44m7/ (58y11) reline break shoes oil soaked(44-m-7)provide sialon governor.

    Jan 5, 2004 · Penalty $350

    Resolve
  • Non-hazardous

    83x10. 83- restore to service.

    May 5, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    33p07,38p07,39q07,36o06,36m07,66o02,64m07. 33-provide access at top terminal landing. 38- provide access. 39- provide covers for electrical equipment. 36- secure cable guard in secondary. 36- provide sufficient

    May 5, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    05e01,33p07,36b07,36o02,38p07,44o02,66o02,64l11,70i11,84##,84##. 05- car door clips door cams, upper floors, 33 provide access at top terminal landing 36-provide lighting 36- cleaning 38-provide 44 clean 66- cl

    May 5, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    83x10-83- restore to service.

    May 5, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    33p07,30q07,36d06,38p07,39m07,55q07,64l11,66o02,69j01,69m07,72e09,73j01, 33- provide access at top terminal landing 30-provide cover in pit 36- secure cable guards in secondary 38- provide. 39- provide communic

    May 5, 2003 · Penalty $350

    Resolve
  • Non-hazardous

    Having installed an awaing without a permit remedy: remove illegal work

    Jan 29, 2003 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work does not conform to approved plans non conforming work noted:permit #102743329 states sidewalls to be erected at a height of 42 & upon inspection of above address side3walls were approx.4'to 7 high

    Sep 10, 2001 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. rem:file an amen

    May 25, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an am

    Apr 20, 2001 · Penalty $400

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.rem:file an amended repo

    Mar 16, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy;file an ame

    Feb 2, 2001 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an am

    Dec 8, 2000

    Resolve
  • Hazardous

    Failure to file amended round 5 report acceptable to this dept. pursuant to rule rcny 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 reprt. remedy: file amended report fol

    Oct 30, 2000 · Penalty $400

    Resolve
  • Non-hazardous

    03k11,30o02,32k11,34d06,46k12,57z09,58k12,62k12,74##,73x#, 74-remove city id tags mark 1904 and replace with tag reading 1s2340. 73x- restore to working order so a complete inspection can be made.

    Jul 24, 1998

    Resolve
  • Non-hazardous

    46q,74d,74m,74i,74o,30o, 46q- install rope guards 74d- secure secondary rope guards 74m- provide railing secondary 74i- replace damaged shackle springs counterweight 74o- clean car top 30o- clean down hoistway

    Jul 8, 1998

    Resolve
  • Non-hazardous

    46q,74d,74d,74x,74o,30o,74i, 46q- install rope guards 74d- decure ladder in secondary 74d- and secure rope guards in secondary 74x- repair secondary lights 74o- clean car top 74i- replace damaged shackle spring

    Jul 8, 1998

    Resolve
  • Non-hazardous

    50y,74o,74d,74o,61b, 50y-seal machine 74o- secondary sheave sheave dirty 74d-secure secondary rope guards 74o- clean car top 61b-adjust safety rope.

    Jul 8, 1998

    Resolve
  • Non-hazardous

    46q,74d,74o,30o,74o, 46q-install rope guards 74d-secure guard in secondary 74o- clean car top 30o- clean down hoistway 74o-excessive grease governor sheave (tension)

    Jul 8, 1998

    Resolve
  • Non-hazardous

    50o,74o,74d,74m,74i,61b, 50- main machine clean 74o- secondary sheave clean 74d- secure secondary ladder 74m- provide rail in secondary 74i- replace busted counterweight shackle springs 61b- adjust safety rope.

    Jul 8, 1998

    Resolve
  • Hazardous

    15x,21x,02m,05l,15t,11q,11b,30o,57d,19l,14m,15q,57t, 15-hoist doors can be pushed open-adj all doors to operate as required. 21-repair me chanical indicators 15-remove all private locks & patch all holes in

    Aug 29, 1997 · Penalty $500

    Resolve
  • Hazardous

    1d,30o,15t,11q,15q,15x,02m,59e,19l,14m,52y, 61-replace cover for safety hole in car 15q-provide special hole for special key for opening hatch doors 15x-hoistway doors can be pushed open-adjust all doors to

    Aug 29, 1997 · Penalty $500

    Resolve
  • Hazardous

    15x11,11b7,11q7,19l10,15t7,61d6,14m7,55i10,30o2,47e1,74t7,5i11. hoistway doors can be pushed open-adjust all doors to operate as required. replace cover for safety in car.

    Aug 29, 1997 · Penalty $500

    Resolve
  • Non-hazardous

    F75m50t54q15m28h22d03o15ah09h30o37o55l57at 75-perform & file 5 yr test 50-label machine with city # 54-cover disconnect 15-install sight guard 17 floor 28- adjust car shoes 22- secure top exit 03-clean top of c

    Aug 22, 1997

    Resolve
  • Non-hazardous

    54q74m53o30o74i74d15t57o 74 hand rails in secondary provide 74 d lable and secure pit doors.

    Aug 6, 1997 · Penalty $200

    Resolve
  • Non-hazardous

    57o30o23u74o52o15t

    Aug 6, 1997 · Penalty $200

    Resolve
  • Non-hazardous

    74i74o55l74d15l06l 74 label and secure pit doors 74 d provide cable guard 15 make self closing 06 free algate roller.

    Aug 6, 1997 · Penalty $100

    Resolve
  • Non-hazardous

    74i74d01l02l 74-lable and secure pti doors make alarm ring.

    Aug 6, 1997 · Penalty $100

    Resolve
  • Hazardous

    15l21l74m02m05l15t11q11b15i20l30o30o74t57o19l14m 13-l repair interlocks 74-t capacity plate provide 11 b provide more adequate lighting 15 i patch boxen in doors 74 t provide lable on pit door 57-clean pit 30

    Aug 5, 1997 · Penalty $500

    Resolve
  • Hazardous

    03q74m57o30o15t11q15l15d02m74e20l19l14m52o35b 74-remedy: counter wright guard hitting cab 03q repair safety keyhole in cab 74m provide capacity plate 15l repair hoistway interlocks make self closing. 53-remedy:

    Aug 5, 1997 · Penalty $500

    Resolve
  • Non-hazardous

    60m57o74m15l30o02m03i22d11q15i20l11b19l14m74e40o 60 m provide buffer spring 74 provide capacity plate 15 l make hoist doors self closing 03 i remedy car enclosing 74 e remedy: counter weight guard rubbing ba

    Aug 5, 1997 · Penalty $200

    Resolve
  • Hazardous

    11b11q19l15t20l74m14m15l55i30o74i47e05i74m 74-repair safety hole coveron platform 15 l make self closing 74 m provide capacity plate 74 t pit door 47 e remedy: cable rubbing near top floors.

    Aug 5, 1997 · Penalty $500

    Resolve
  • Non-hazardous

    75t.

    Apr 28, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    75t.

    Apr 28, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    75t, 19l, 74l, 15l. 74--repair annunciator. 15-second floor.

    Apr 26, 1995 · Penalty $100

    Resolve
  • Non-hazardous

    75t, 19l, 74l, 5l, 6l. 74-repair annunciator.

    Apr 26, 1995 · Penalty $100

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O4)
Year built
1929
Floors
25
Residential units
—
Building area
444,716 ft²
Lot area
15,849 ft²
Zoning
C5-2
Community board
105
Council district
2
Block / lot
858 / 78
Assessed value
$54,279,000
Landmark / historic district
Madison Square North Historic District

Questions about 259 5 Avenue

Who owns 259 5 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 261 Fifth Avenue Tic.

Does 259 5 Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 259 5 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 259 5 Avenue built?

City records list 1929 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.