80 Madison Avenue
Manhattan, NY 10016BBL 1-00858-0014Map
Owner of record: 80 Madison Avenue, LLC
80 Madison Avenue is an elevator apartment building built in 1923 in Manhattan, 10016. It has 56 residential units across 8 floors. The owner of record is 80 Madison Avenue, LLC. HPD has recorded 15 housing violations here, most recently on April 29, 2026. 8 of the 15 most recent violations are still open.
- HPD violations
- 15
- DOB violations
- 34
- ECB violations
- 18
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4h, 4th story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4H
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 4h, 4th story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4H
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature exceeding 130 degrees at wash/basin in the bathroom located at apt 4h, 4th story, 2nd apartment from south at west
Feb 6, 2026 · Apt 4H
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to boiler room at west at cellar
Feb 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stop at door leading to laundry room at south at cellar
Feb 6, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of discarted refrigerator with doors intact at cellar
Feb 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door leading to recycing room at north at cellar
Feb 6, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Refit west 2nd lower sash window in the 2nd room from north at west located at apt 7g, 7th story, 1st apartment from west at north , section at south
Nov 19, 2012 · Apt 7G
Open — Nov sent out
Show 5 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 7g, 7th story, 1st apartment from west at north , section at south
Nov 19, 2012 · Apt 7G
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 7g, 7th story, 1st apartment from west at north , section at south
Nov 19, 2012 · Apt 7G
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system public hall at 1sty
Jan 25, 2005
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system b01ler room door locked at cellar
Jan 25, 2005
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of moisture penetrating through door top room 8 sty penthouse a from terrance.
Jun 17, 1993
Open — Nov sent out
DOB building violations · 34
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 27, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2013
Dob violation - resolved
Show 24 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 18, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - dismissed - Zoning none
Z-zoning none
May 7, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 7, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 28, 1994
Dob violation - active - Construction other optional
C-construction other optional
Feb 28, 1994
Vp-violation unserved ecb-active - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed
ECB violations · 18
- Class - 1
28-201.1 inadequate tenant protection plan. note:at time of inspectionobserved work has begun under the aforementioned job #. the submitted tpp lacks specific means and methods of protecting tenants on health r
Oct 28, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute safe construction bill of rights. note:at time of inspection observed work has begun under the aforementioned job #. by code it is required that the scbofr should be posted or dist
Oct 28, 2020 · Penalty $1,250
Resolve - Class - 2
(failure to post/distribute scb of rights)at time of inspection,observed work being performed under the aforementioed job #,by code it required that the scb of r should be posted &/or distributed.no scb of r
Mar 26, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute tpp.at time of inspection,observed work being done under the aforementioned job #.by code it is required that the tpp should be posted &/or distributed,no tpps were posted or distr
Mar 26, 2020 · Penalty $1,250
Resolve - Class - 2
Sec. 3303.10.2 failure to provide 72hrs notification. note: at time ofinspection observed work being performed under the aforementioned job #. 72hrs notification is required to be provided to the dept prior to
Mar 19, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to post or distribute tenant protection plan. note: at time ofinspection observed work being performed under aforementioned job #. by code it is required that the tpp should be posted & or distributed.
Mar 19, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to provide approved/accepted construction documents at jobsiteat time of inspection. note: at time of inspection observed work being performed under performed jb #. no approved plans on site at time of
Mar 19, 2020 · Penalty $312
Resolve - Class - 2
Failure to post or distribute safe construction bill of rights. note: at time of inspection observed work being performed under the aforementioned job #. by code it is required the(scbfr)should be posted & or
Mar 19, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building walls & appurtenances. vertical crack wasobserved at stonework at exposure 4 (north elevn) between floors 8 & 9bynortheast corner.rmdy:maintain bldg exteriors.repair defects;provide
Jan 22, 2013
Resolve - Class - 2
Failure to maintain building walls & appurtenances. step cracks were observed at east elevn of bulkhead. step cracks were found at 9/f ph window corner at west elevn. vertical crack was observed at stonework at
Apr 16, 2012 · Penalty $250
Resolve
Show 8 more ↓
- Class - 2
Failure to maintain exterior bldg. * west elevation observed vertical cracks reopening in parapet setback on the 10th flr; step cracks reopening in masonry brick facade at the base of parapet (north end).cracks
Apr 7, 2010 · Penalty $500
Resolve - Class - 2
34o2.42g11.42i9.56y13.70o2 42g fuses 42i alligator jumper on ogx relay
Jun 24, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Nov 28, 2008
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupacny. tco #102321863 issued and expires: 12-27-2001 alt 102321863 remedy: renew certificate of occupancy.
Dec 1, 2004 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior bldg wall.piece of limestone facade dislodged from 6th flr east elevation south corner.pedestrain injured.remedy:provide overhead protection and stability report from p.r or r.a
Sep 27, 2003 · Penalty $800
Resolve - Non-hazardous
56,b,09 60,b,09 55,0,02 41,g,11 41,0,02 51,b,07 16,0,02 3 66,0,02 28,q,11 56+60b09 devices bearing no 12087 is incorrect remove tags and maintain tag bearing 1p31876 as the correct number 55002 property clean
Sep 22, 2003
Resolve - Non-hazardous
73a05. 73-device no:1s2342 has been removed.
Oct 20, 2000 · Penalty $1,000
Resolve - Non-hazardous
38m,79l, (38) restore to proper operation (74) restore electric control cable to proper operation; cease praonce of of operating car by manally holding in relzys
Feb 26, 1992
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 31, 2026 · Apt 4H
Close - Plumbing
Water supply
Jul 16, 2025 · Apt 6C
Close - Heat/hot water
Apartment only
May 31, 2024 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 8, 2021 · Apt PHE
Close - Heat/hot water
Entire building
Feb 8, 2021 · Apt PHE
Close - Heat/hot water
Apartment only
Jan 29, 2021 · Apt PHE
Close - Plumbing
Water supply
Jul 11, 2020 · Apt 6F
Close - Plumbing
Water supply
Jul 11, 2020 · Apt BLDG
Close - Plumbing
Water supply
Jul 11, 2020 · Apt 2D
Close - Plumbing
Water supply
Jul 11, 2020 · Apt BLDG
Close
Show 17 more ↓
- Water leak
Heavy flow
Jun 11, 2018 · Apt APT4C
Close - Water leak
Heavy flow
Jun 11, 2018 · Apt APT4C
Close - Water leak
Heavy flow
Jun 11, 2018 · Apt 4C
Close - Water leak
Heavy flow
Jun 11, 2018 · Apt 4C
Close - Heat/hot water
Entire building
May 10, 2017 · Apt 23
Close - Appliance
Electric/gas range
May 10, 2017 · Apt 23
Close - Heat/hot water
Apartment only
Feb 20, 2015 · Apt 3C
Close - General
Windows
Nov 3, 2012 · Apt 7G
Close - General
Windows
Jan 11, 2011 · Apt 7G
Close - Nonconst
Carbon monoxide
Jul 8, 2010 · Apt 2C
Close - Heating
Heat related
Oct 16, 2009 · Apt 7
Close - Plumbing
Water supply
Feb 6, 2007 · Apt PHB
Close - Heating
Heat related
Feb 19, 2006 · Apt 2F
Close - Heating
Heat related
Jan 21, 2005 · Apt 3G
Close - Plumbing
Water-leaks
Oct 4, 2004 · Apt PHA
Close - Plumbing
Water-leaks
Oct 4, 2004 · Apt PHA
Close - General
Floor
Oct 4, 2004 · Apt PHA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1923
- Floors
- 8
- Residential units
- 56
- Building area
- 60,110 ft²
- Lot area
- 7,038 ft²
- Zoning
- C5-2
- Community board
- 105
- Council district
- 2
- Block / lot
- 858 / 14
- Assessed value
- $9,153,450
- Landmark / historic district
- No
HPD registration #139979, last renewed Aug 28, 2025.
Questions about 80 Madison Avenue
Who owns 80 Madison Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 80 Madison Avenue, LLC.
Does 80 Madison Avenue have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 80 Madison Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 80 Madison Avenue built?
City records list 1923 as the year it was built.
How many apartments are in 80 Madison Avenue?
It has 56 residential units and 61 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.