16 West 40 Street
Manhattan, NY 10018BBL 1-00841-7501Map
Owner of record: Unavailable Owner
16 West 40 Street is a condominium built in 2015 in Manhattan, 10018. It has 57 residential units across 33 floors. The owner of record is Unavailable Owner. HPD has recorded 5 housing violations here, most recently on June 16, 2023. 3 of the 5 most recent violations are still open.
- HPD violations
- 5
- DOB violations
- 21
- ECB violations
- 31
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- BHazardous
Replace the broken or defective basin sink in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east
Jun 16, 2023 · Apt 22A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective east wall in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east
Jun 16, 2023 · Apt 22A
Open — Nov sent out - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east
Jun 16, 2023 · Apt 22A
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet ... in the bathroom located at apt 22a, 21st story, 1st apartment from west at north
May 16, 2022 · Apt 22A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 21
- Construction other optional
Department of buildings intend to revoke all work and jobs under application #m01290309-i1 unless master rigger obtained required insurance.
Feb 10, 2026
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2021
Dob violation - resolved - Construction other optional
Borough commissioner has issued a stop work order under application #121184486 due to site safety manager withdrawal. 95% of work completed. stop all work immediately and make the site safe.
Jan 4, 2021
Dob violation - dismissed
Show 11 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2020
Dob violation - active - Construction other optional
Borough commissioner has issued a stop work order under for job #121184486 due to contractor withdrawal.
Feb 18, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 3, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 13, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed
ECB violations · 31
- Class - 1
Altered changed bldg occupied without valid c of o - at time of inspection noted job #100730498 to supercede c/o #11791 dated 11/27/1926 expired on 07/28/2021.remedy:comply with code.
Sep 13, 2021
Resolve - Class - 1
No roeboards at the time of inapection i observed a pipe scaffold in place at roof level at exposure 2 with no toe board as all working platform stage provide/institute safe means of working on all scaffold
Aug 22, 2019 · Penalty $5,000
Resolve - Class - 1
3314.5.5:platform tiedown at the time of inspection i observed pipe scaffold at roof level exposure 2 if proposed new building not fully plank proposed new building not fully plank not tiedown and no adequate g
Aug 22, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard/failure to maintain saftey operation at the time of inspection i observed on 32 floor of propose new building a portable machine unattended with the cutting edge no covered and as well con
Aug 22, 2019 · Penalty $5,000
Resolve - Class - 1
Specific design drawing on scaffold on site at the time of inspection i observe special scaffold at exposure 2 at roof level upon required for design drawings i observe work done on existing scaffold in place
Aug 22, 2019 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved tpp-observe 2x2 and plywood at 033 terrace platform where on tpp it calls for 2 hrs fire rated partition.observed stair c not fire rated and is open to tenants (not as per app
Aug 9, 2018 · Penalty $2,500
Resolve - Class - 1
3301.8.1 use and tampering. at the time of my inspection in response to an incident that occurred where a worker cut into his forehead witha grinder a half inch deep. the workers tampered with the scene of the
Jul 13, 2018 · Penalty $1,250
Resolve - Class - 1
3301.2 failure to maintain & institute safe ops.@the time of my insp response to an incident that occured where a laborer was using a (grinder) to an cut marble injured himself when the grinder (came) back & cu
Jul 13, 2018 · Penalty $2,500
Resolve - Class - 2
98hp,99mp. 98m7-five year tag missing provide; 99m7 one year tag missing provide.
May 3, 2018
Resolve - Class - 2
3301.2.holes not convered @ time of inspection of new 33 story building on active jobsite.building tapped off & fully enclosed with windows fully installed.i observed construction activity going on with interio
Mar 26, 2018
Resolve
Show 21 more ↓
- Class - 1
1rcny3319-01(g)(2)(i)(a)crane plans do not show pertinent features andactual site conditions required to be shown on the documents for craneuse.manhole not shown on plan.at time of inspection mobile crane cd#45
Oct 27, 2017 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measures.operation of crane/dorrick hoisting equipment in an unsafe manner.at time of inspection it was found that mobile crane (co)#4597 (n#86017)was installed in the street in an unsafe mann
Oct 27, 2017
Resolve - Class - 1
Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 33 sty bldg at bulkhead level,construction work in progress. i observed storage & work
Oct 17, 2017 · Penalty $1,000
Resolve - Class - 1
Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 33 sty bldg at bulkhead level,construction work in progress. i observed construction are
Oct 17, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain adequate houskeeping. @ time of insp. of active const. site nb 33 stories observed the houskeeping was inadequate throughout various locations consisting of bldg material,debris,ext. cords,t
Aug 16, 2017
Resolve - Class - 1
Failure to safeguard all persons & property affected by constructed operation: hard hat fallen front north elevation of above structure, & said hat fallen across the street & struck a pedestrian walking on the
May 2, 2017 · Penalty $10,000
Resolve - Class - 2
2x7 repair or provide in car communication to outside service.
Jan 23, 2017 · Penalty $500
Resolve - Class - 2
Work does not conform to approved construction documents/or approved amendments. at time of performing a 3 month extension inspection on cd 3253, cn658/14, i observed a required bolt missing from the top collar
Oct 4, 2016
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. at time of inspection cd 3253 was being used to hoist pre-cast forms by e.e. marr, a contractor who is not listed on approve
Aug 30, 2016
Resolve - Class - 1
Housekeeping. at time of inspection i observe active const-site,several upper floors from 20th to stripping floor need to be cleared & debri removed from site,plywood,plastic bottles,chipped concrete & nails.
Jul 12, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to maintain in code compliant manner-lack of temporary lighting. at time of inspection numerous floor missing light bulbs working. stairwell missing temporary lighting on numerous landings. temporary
Jul 12, 2016 · Penalty $1,000
Resolve - Class - 2
Illegal signs. at time of inspection i observed 2 signs posted on sidewalk shed & construction fence advertising architectural firm & t.o. nickel safety progream. remedy: remove illegal signs advertisement and
Jul 12, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard control access zone. at time of inspection elevator crew was installing rails. while cart was on upper floors past 1st fl shaftway was left open. no control access zone. on upper floor shee
Jul 12, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation. at time of inspection responding to an incident observed a new concrete bldg up to 28 floors.also found that a worker fell from a
May 6, 2016
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.note:at time of my inspection of a 33story bldg at 28 flr level, construction work in progress.i observed workers working at peri
Apr 30, 2016 · Penalty $25,000
Resolve - Class - 1
Bc3301.4 inspection: note: at time of my inspection of a 33story bldg at 28 floor level, construction work in progress. i observed workers working at perimeter edge performing facade work,using safety embedded
Apr 30, 2016 · Penalty $1,630
Resolve - Class - 1
(bs3310.9) failure to maintain concrete safety log as required by code@ the time of my inspection new bldg structure up to 26 story, i observed concrete work / operations in progress, a review of the concrete
Apr 19, 2016 · Penalty $1,600
Resolve - Class - 1
Sec. 3301.2 failure to safeguard-no guardrails. at time of inspection,observed crane jumped,missing guardrails around climber. remedy: provide guardrails around crane climber on all floor as per bldg code-guard
Jan 4, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard. at time of inspection,i was responding to a piece of emt pipe that fell from bldg onto street level(outside of const bldg)immediate danger of hitting pedestrian. concrete operations on 13
Jan 4, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirement. note at time of inspection observed accumulation of combustible debris/materials from stripping operation consist of various sizes of wood/plyw
Nov 23, 2015 · Penalty $4,000
Resolve - Class - 2
3310.6 failure to have designated concrete safety manager as indicatedon pw-z on site at a minimum of once every two weeks.examinator of da ily concrete logs for date 8/17/15 to 10/16/17 indicates that csm #228
Oct 16, 2015 · Penalty $830
Resolve
Complaints
- Plumbing
Basin/sink
Nov 5, 2022 · Apt 22A
Close - Plumbing
Basin/sink
Aug 22, 2022 · Apt 22A
Close - Plumbing
Water supply
Aug 22, 2022 · Apt 22A
Close - Paint/plaster
Wall
Aug 22, 2022 · Apt 22A
Close - General
Ventilation system
May 16, 2022 · Apt 18A
Close - Unsanitary condition
Sewage
Apr 27, 2022 · Apt 22A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2015
- Floors
- 33
- Residential units
- 57
- Building area
- 184,712 ft²
- Lot area
- 12,178 ft²
- Zoning
- C5-3
- Community board
- 105
- Council district
- 4
- Block / lot
- 841 / 7501
- Assessed value
- $42,769,576
- Landmark / historic district
- No
HPD registration #144650, last renewed Aug 29, 2025.
Questions about 16 West 40 Street
Who owns 16 West 40 Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 16 West 40 Street have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 16 West 40 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 16 West 40 Street built?
City records list 2015 as the year it was built.
How many apartments are in 16 West 40 Street?
It has 57 residential units and 58 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.