Owner of record: Unavailable Owner

16 West 40 Street is a condominium built in 2015 in Manhattan, 10018. It has 57 residential units across 33 floors. The owner of record is Unavailable Owner. HPD has recorded 5 housing violations here, most recently on June 16, 2023. 3 of the 5 most recent violations are still open.

HPD violations
5
DOB violations
21
ECB violations
31
HPD complaints
6

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 16, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 5

  • B

    Replace the broken or defective basin sink in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east

    Jun 16, 2023 · Apt 22A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective east wall in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east

    Jun 16, 2023 · Apt 22A

    Open — Nov sent out
  • B

    Replace the broken or defective water closet in the bathroom located at apt 22a, 22nd story, 1st apartment from north at east

    Jun 16, 2023 · Apt 22A

    Open — Nov sent out
  • C

    Remove all obstructions from water closet ... in the bathroom located at apt 22a, 21st story, 1st apartment from west at north

    May 16, 2022 · Apt 22A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 20, 2021

    Closed — Violation dismissed

DOB building violations · 21

  • Construction other optional

    Department of buildings intend to revoke all work and jobs under application #m01290309-i1 unless master rigger obtained required insurance.

    Feb 10, 2026

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 22, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - resolved
  • Construction other optional

    Borough commissioner has issued a stop work order under application #121184486 due to site safety manager withdrawal. 95% of work completed. stop all work immediately and make the site safe.

    Jan 4, 2021

    Dob violation - dismissed
Show 11 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 18, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 18, 2020

    Dob violation - active
  • Construction other optional

    Borough commissioner has issued a stop work order under for job #121184486 due to contractor withdrawal.

    Feb 18, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 5, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 3, 2018

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 13, 2018

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 11, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - dismissed

ECB violations · 31

  • Class - 1

    Altered changed bldg occupied without valid c of o - at time of inspection noted job #100730498 to supercede c/o #11791 dated 11/27/1926 expired on 07/28/2021.remedy:comply with code.

    Sep 13, 2021

    Resolve
  • Class - 1

    No roeboards at the time of inapection i observed a pipe scaffold in place at roof level at exposure 2 with no toe board as all working platform stage provide/institute safe means of working on all scaffold

    Aug 22, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    3314.5.5:platform tiedown at the time of inspection i observed pipe scaffold at roof level exposure 2 if proposed new building not fully plank proposed new building not fully plank not tiedown and no adequate g

    Aug 22, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard/failure to maintain saftey operation at the time of inspection i observed on 32 floor of propose new building a portable machine unattended with the cutting edge no covered and as well con

    Aug 22, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Specific design drawing on scaffold on site at the time of inspection i observe special scaffold at exposure 2 at roof level upon required for design drawings i observe work done on existing scaffold in place

    Aug 22, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved tpp-observe 2x2 and plywood at 033 terrace platform where on tpp it calls for 2 hrs fire rated partition.observed stair c not fire rated and is open to tenants (not as per app

    Aug 9, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    3301.8.1 use and tampering. at the time of my inspection in response to an incident that occurred where a worker cut into his forehead witha grinder a half inch deep. the workers tampered with the scene of the

    Jul 13, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    3301.2 failure to maintain & institute safe ops.@the time of my insp response to an incident that occured where a laborer was using a (grinder) to an cut marble injured himself when the grinder (came) back & cu

    Jul 13, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    98hp,99mp. 98m7-five year tag missing provide; 99m7 one year tag missing provide.

    May 3, 2018

    Resolve
  • Class - 2

    3301.2.holes not convered @ time of inspection of new 33 story building on active jobsite.building tapped off & fully enclosed with windows fully installed.i observed construction activity going on with interio

    Mar 26, 2018

    Resolve
Show 21 more ↓
  • Class - 1

    1rcny3319-01(g)(2)(i)(a)crane plans do not show pertinent features andactual site conditions required to be shown on the documents for craneuse.manhole not shown on plan.at time of inspection mobile crane cd#45

    Oct 27, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Inadequate safety measures.operation of crane/dorrick hoisting equipment in an unsafe manner.at time of inspection it was found that mobile crane (co)#4597 (n#86017)was installed in the street in an unsafe mann

    Oct 27, 2017

    Resolve
  • Class - 1

    Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 33 sty bldg at bulkhead level,construction work in progress. i observed storage & work

    Oct 17, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 33 sty bldg at bulkhead level,construction work in progress. i observed construction are

    Oct 17, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to maintain adequate houskeeping. @ time of insp. of active const. site nb 33 stories observed the houskeeping was inadequate throughout various locations consisting of bldg material,debris,ext. cords,t

    Aug 16, 2017

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by constructed operation: hard hat fallen front north elevation of above structure, & said hat fallen across the street & struck a pedestrian walking on the

    May 2, 2017 · Penalty $10,000

    Resolve
  • Class - 2

    2x7 repair or provide in car communication to outside service.

    Jan 23, 2017 · Penalty $500

    Resolve
  • Class - 2

    Work does not conform to approved construction documents/or approved amendments. at time of performing a 3 month extension inspection on cd 3253, cn658/14, i observed a required bolt missing from the top collar

    Oct 4, 2016

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. at time of inspection cd 3253 was being used to hoist pre-cast forms by e.e. marr, a contractor who is not listed on approve

    Aug 30, 2016

    Resolve
  • Class - 1

    Housekeeping. at time of inspection i observe active const-site,several upper floors from 20th to stripping floor need to be cleared & debri removed from site,plywood,plastic bottles,chipped concrete & nails.

    Jul 12, 2016 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain in code compliant manner-lack of temporary lighting. at time of inspection numerous floor missing light bulbs working. stairwell missing temporary lighting on numerous landings. temporary

    Jul 12, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    Illegal signs. at time of inspection i observed 2 signs posted on sidewalk shed & construction fence advertising architectural firm & t.o. nickel safety progream. remedy: remove illegal signs advertisement and

    Jul 12, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard control access zone. at time of inspection elevator crew was installing rails. while cart was on upper floors past 1st fl shaftway was left open. no control access zone. on upper floor shee

    Jul 12, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation. at time of inspection responding to an incident observed a new concrete bldg up to 28 floors.also found that a worker fell from a

    May 6, 2016

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperations.note:at time of my inspection of a 33story bldg at 28 flr level, construction work in progress.i observed workers working at peri

    Apr 30, 2016 · Penalty $25,000

    Resolve
  • Class - 1

    Bc3301.4 inspection: note: at time of my inspection of a 33story bldg at 28 floor level, construction work in progress. i observed workers working at perimeter edge performing facade work,using safety embedded

    Apr 30, 2016 · Penalty $1,630

    Resolve
  • Class - 1

    (bs3310.9) failure to maintain concrete safety log as required by code@ the time of my inspection new bldg structure up to 26 story, i observed concrete work / operations in progress, a review of the concrete

    Apr 19, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3301.2 failure to safeguard-no guardrails. at time of inspection,observed crane jumped,missing guardrails around climber. remedy: provide guardrails around crane climber on all floor as per bldg code-guard

    Jan 4, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard. at time of inspection,i was responding to a piece of emt pipe that fell from bldg onto street level(outside of const bldg)immediate danger of hitting pedestrian. concrete operations on 13

    Jan 4, 2016 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirement. note at time of inspection observed accumulation of combustible debris/materials from stripping operation consist of various sizes of wood/plyw

    Nov 23, 2015 · Penalty $4,000

    Resolve
  • Class - 2

    3310.6 failure to have designated concrete safety manager as indicatedon pw-z on site at a minimum of once every two weeks.examinator of da ily concrete logs for date 8/17/15 to 10/16/17 indicates that csm #228

    Oct 16, 2015 · Penalty $830

    Resolve

Complaints

  • Plumbing

    Basin/sink

    Nov 5, 2022 · Apt 22A

    Close
  • Plumbing

    Basin/sink

    Aug 22, 2022 · Apt 22A

    Close
  • Plumbing

    Water supply

    Aug 22, 2022 · Apt 22A

    Close
  • Paint/plaster

    Wall

    Aug 22, 2022 · Apt 22A

    Close
  • General

    Ventilation system

    May 16, 2022 · Apt 18A

    Close
  • Unsanitary condition

    Sewage

    Apr 27, 2022 · Apt 22A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
2015
Floors
33
Residential units
57
Building area
184,712 ft²
Lot area
12,178 ft²
Zoning
C5-3
Community board
105
Council district
4
Block / lot
841 / 7501
Assessed value
$42,769,576
Landmark / historic district
No

HPD registration #144650, last renewed Aug 29, 2025.

Questions about 16 West 40 Street

Who owns 16 West 40 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 16 West 40 Street have violations?

Yes. NYC HPD has recorded 5 housing violations at this property.

Is 16 West 40 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 16 West 40 Street built?

City records list 2015 as the year it was built.

How many apartments are in 16 West 40 Street?

It has 57 residential units and 58 units in total.