roofy

4 West 37 Street

Manhattan, NY 10018BBL 1-00838-0054Map

Owner of record: 4 West 37th Street LLC

4 West 37 Street is a hotel built in 2017 in Manhattan, 10018. The owner of record is 4 West 37th Street LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
49
ECB violations
57
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 49

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 25, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 25, 2021

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 2, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2020

    Dob violation - dismissed
Show 39 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 10, 2018

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Aug 27, 2018

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Aug 27, 2018

    Vp*-violation unserved ecb- dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Plumbing none

    The borough commissioner has issued a notice of immediate stop work order due to applicant withdrawal of job #140368858 as of 01/11/18

    Jan 16, 2018

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 3, 2017

    Vp*-violation unserved ecb- dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 19, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 8, 2016

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jul 21, 2016

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jul 21, 2016

    Vpw*-violation unserved ecb-work without permit-dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 3, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 17, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 12, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 18, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 10, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 20, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 14, 2006

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 9, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    1p6114

    Aug 6, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p6114

    Aug 6, 2001

    Dob violation - resolved
  • Elevator elevatorrequired

    1p6114

    Mar 13, 2000

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Apr 17, 1997

    Vpw-violation unserved ecb-work without permit-active
  • Construction other optional

    C-construction other optional

    Apr 17, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 7, 1990

    Dob violation - resolved

ECB violations · 57

  • Class - 2

    Missing shut off valve at the tank as per 1307.1 missing fusible link valve in supply pipe at the wall of the generator room as per 1305.3.4 bottom of vertical shaft must be enclosed and drain into leak detecti

    Mar 10, 2021

    Resolve
  • Class - 1

    Failure to comply with manufacture specifications on an nb active job site i observed yodock barriers an the street was not y2 full as required by manufacturer specks.remedy:comply with specifications.

    Feb 27, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.at time of my inspection on an nb at 23 floor,i observed large amounts ofdebris on 1st floor at expo#1 creating a tripping hazard for person an

    Feb 27, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Bc33016-design,sizes,and capacity of materials,structures,temporary constructoin,and equipment.at the time of inspection of a propose 23 story new bulding,i observed at exposure one,erected steel beams with woo

    Jan 29, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc33141010-support devices(c-hooks)at time of inspection of a propose 23 story new building i observed on the roof of exposure 3,suspended scaffolds supported by c-hooks on the parapet walls the c-hooks had no

    Jan 29, 2020 · Penalty $6,250

    Resolve
  • Class - 2

    At time of inspecoitn of a propose 23 story new building,i observed when requested approve drawings with footing details,non were provided.drawings provided did not show step footing.remedy:provide approve draw

    Jan 29, 2020

    Resolve
  • Class - 1

    Failure to provide/miantain the required documents (no cd-5) at the tim eof inspection on an actiev jobsite of a 24 story building i observed on teh roof top level a set of outrigger beams supporting a suspende

    Nov 20, 2019 · Penalty $625

    Resolve
  • Class - 1

    Failure to fiel evidence of compliance with workers comp law and or disbility benefits law(expired disbiloty) at the time of my inspection on an active job site of a 24 story building i observed workers on site

    Nov 20, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Inadequate safety measures:open hoisting equipment in unsafe manner at the tim fo my inspection on an atciev jobsite 02 a 24 story building i observed 2 sets of suspended scaffold installed on the parapit walls

    Nov 20, 2019

    Resolve
  • Class - 1

    Work contrary to plan(heavy duty sidewalk shed)at the time of the inspection of an active job site for which a site safety manager is required,i observed that the sidewalk shed did not conform with the drawings

    Nov 13, 2019 · Penalty $2,500

    Resolve
Show 40 more ↓
  • Class - 2

    Storage of material on overhead protection.at the time of the inspection of an active job site for which a site safety manager is required,iobserved materials and cmu's on the overhead protection at exposure 3.

    Nov 13, 2019

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction-no guardrails. at time of my inspection of 24 sty blkdg i observed employee climing down from 2nd fl roof to top of 6' baker sca

    Oct 2, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. 3301.1.3 use of equipment not to manufactures specifications/ladders at time of my inspection of 24 sty bldg,i observed the following an employee straddle on top of step ladder reaching abovce his head ins

    Oct 2, 2019

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. at time of my inspection of 24 sty bldg i observed the following-debris pile 6'in some places,materials stock piled in numerous rooms-hazardou

    Oct 2, 2019 · Penalty $625

    Resolve
  • Class - 1

    Unsafe storage of materials during construction at time of my inspection of 24 sty bldg,i observed conduit wheels not checked to prevent rolling off bldg-loose materials stored closer than 5ft from edge of bldg

    Oct 2, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspectionof 24 sty bldg,i observed egress blocked by sheetrock,pipes & debris. creates the hazard at unobstructed exit of bldg in case of emergency

    Oct 2, 2019 · Penalty $312

    Resolve
  • Class - 1

    3307.6.5.8-periodic inspection.at the time of inspection of an active job site.i observed sidewalk shed erected at exposure one.upon requestfor periodic inspection report, non was provided sidewalk shed shall

    Aug 27, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    3301.2 failure to institute and maintain safety measures covering holes. at time of inspection on an active jobsite holes greater than 2" upto 2ft were not covered or covers were not fastened adequately through

    Aug 27, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    3318.3 no valid permit for material (hoist) at time of inspection on an active site. no valid inspection permit was present for personnel hoist at exp 3. failure to inspect hoist creates a hazard or mechanical

    Aug 27, 2018

    Resolve
  • Class - 2

    Bc3303.3.watchperson not present.at time of inspection i walked into the worksite,i observed generator running,site door was open/unlocked, i walked the perimeter and the first three stories of the site,no one,

    Jul 7, 2018

    Resolve
  • Class - 1

    Unsafe storage of materials during construction or demo as noted @ time of insp 21 story nb, active site observed different types of materials (wood,alum,construction materials,woods) are stored w/in 10ft (most

    May 30, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments. note: at the time of my inspection of a 23 story building at 16th floor level, i observed existing site condition does not re

    Apr 12, 2018 · Penalty $625

    Resolve
  • Class - 1

    Housekeeping. note: at time of my inspection of a 23 story building at 16th floor level, construction work in progress. i observed multiple areas at exposure 1 and 3 from 2nd to 13th floor consumed with debris

    Apr 12, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3305.3.6.1 reshores limitations. note: at the time of my inspection of a 23 story building at 16th floor level, construction work in progress. i observed reshores at exposure 1 and 3 from 11th to 13th floor w

    Apr 12, 2018 · Penalty $2,500

    Resolve
  • Class - 1

    Bc3309.10 protection of roofs. note: at the time of my inspection of a 23 story building at 16th floor level, construction work in progress. i observed that there was no protection provided for parapet at roof

    Apr 12, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to institute and maintain safety equipment measures and temporary construction. note: at the time of my inspection of a 23 story building at 16th floor level, construction work in progress. i observed t

    Apr 12, 2018 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3301.6 design, sizes and capacity of material, structures, temporary construction and equipment. note: at the time of my inspection of a 23 story building at 16th floor level, construction work in progress. i

    Apr 12, 2018 · Penalty $625

    Resolve
  • Class - 1

    Bc3307.4 warning signs, personnel and barriers. note: at the time of my inspection of a 23 story building at 16th floor level construction work in progress. i observed debris removal operation being conducted a

    Apr 12, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to provide approved(demo)plans.at time of inspection i observed that demolition work(removal of bricks)was ongoing at expo#4 site safely manager could not provide demo plans for the removal of bricks.re

    Aug 18, 2017 · Penalty $250

    Resolve
  • Class - 2

    Bc3309.9/failure to waterproof adjoining wall of building during construction or demolition operations.at the time of inspection i observed at expo#4 no water proofing was done on the wall against seep into adj

    Aug 18, 2017 · Penalty $400

    Resolve
  • Class - 2

    Failure to safeguard:@ time of inspection of an incident of a worker being injured during rebar delivery operations of a proposed 22 story new bldg @ cellar phase.i ask for a pre task rebar delivery operation i

    Aug 3, 2017 · Penalty $5,000

    Resolve
  • Class - 1

    Work does not conform to approved plans or approved documents.at the time of inspection i did observe that the excavation at exposure #3 is not in accordance to aproved plans.engineer need to provide shoring de

    Mar 21, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Work doesn't conform to approved construction documents or approved amendments @time of inspection noted that the basement of jobsite was locked w.debris approx 8'ht &approx 30long by 10'wide the plans show no

    Jul 21, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain safety equipment measures @(term property)construction no guardrail system.@time of inspection noted that there was no guard rail system @expo#3 &@ opening by the staircase.(pstewtial)for wo

    Jul 21, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain saftey equipment measures or temporary construction no guardrail system.@time of inspection noted that @3rd flr level ofjob work on going removal of flr joist there were workers @ unprotecte

    Jul 21, 2016 · Penalty $1,200

    Resolve
  • Class - 1

    3301.6.1 design whenever design is specifically required by provitionsof this chapter such design shall be in accordance w.the requirement of his code executed by a registered professional w. seal&signature.@ti

    Jul 21, 2016 · Penalty $250

    Resolve
  • Class - 1

    Work doesn't conform to approved construction documents or approved amendments @time of inspection noted@ basement level of job debris loaded approx 8'x30long &approx 10'wide the plans call to removal of debris

    Jul 21, 2016 · Penalty $1,000

    Resolve
  • Class - 1

    3309.1 protection required adjoining property public including person (theron sanel).be protected than damage &injury during construction ordemolition.@time of inspection noted @exp#2 of jobsite adjoining prope

    Jul 21, 2016

    Resolve
  • Class - 1

    Failure to safeguard all persons&property affected by construction operations.@time of inspection noted workers removing debris from a demolition site @exp#1 where demo continue was @the street,there was no pro

    Jul 21, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    3314.4.3.2.1 partial *swo* installation inspection report:not provided.note:active demo stie, 5th fl.demo in progress.@exp #1 and 3 there is a supported scaffold in place approx 50'h.obs material and equip on s

    Apr 21, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Sec. 3301.1.1 responsibility for safety: obstructed egress. note: active demolition site. at the ground floor the main in/egress for workerson site is obstructed by large room of bricks/debris equipment in/egre

    Apr 21, 2016

    Resolve
  • Class - 2

    3301.1.1 responsibility for safety:obstructed egress.note:activie demo site.@ground floor the main in/egress for workers on sit is obstructed by large amt of bricks/debris,equipment.in/egress shall be maintaine

    Apr 21, 2016

    Resolve
  • Class - 1

    3301.2 full *swo* safety measures and standards.note:active demo jobsite.demo in progress.5th fl.the adjoining property @exp #3 deos not have overhead protection in place as per approved demo plan causing immed

    Apr 21, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    (1 rcny 48) failure to adequately supervide work @ a const. site. so as to maintain a safe cont. site & ensure compliance w/ approved const.documents & chapter 33 (safeguard during const. & demo) the following

    Apr 21, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    3301.2 full *swo* safety measures and standards.note:active demo jobsit,demo in progress @6th flleading to 5th fl.the adjoining property @exp #3 deos not have overhead protection in place causing immediate haza

    Apr 21, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved const. documents and/or approved amendments.note:demo jobsit,demo in progress @6h fl.the chute that is being used is contrary to design/details in approved demo plans.chute is

    Apr 21, 2016 · Penalty $250

    Resolve
  • Class - 2

    Partial *swo* work does not conform to approved const. documents and/or approved amendments.note:demo jobsite,demo in progress @6th fl.the chute that is being used is contrary to plans.it is not sealed fl-ceili

    Apr 21, 2016 · Penalty $250

    Resolve
  • Class - 1

    3314.4.3.2.1 partial*swo*installation inspection report:not provided.note:active demo site @5th fl.demo in progress.@exp #1 and 3 there is a supportd scaffold in place approx 50'h.obs material equp on scaffold

    Apr 21, 2016 · Penalty $1,600

    Resolve
  • Class - 2

    3306.9.8.3 glass:not removed completely.note:active demo site,demo in progress @5th fl.@ex #3 there is galss that has not been removed prior to demo.glass in place @various floors 4-2.rem:remove all glass prior

    Apr 21, 2016

    Resolve
  • Class - 2

    Sec. 3306.9.8.3 glass: not removed complete. note: active demolition jobsite,(demo)in progress at 5th fl. at exp#3 there is glass that was not removed as per code prior to(demo). glass in place at exp#3 at vari

    Apr 21, 2016

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jan 28, 2026 · Apt HOTELR

    Close
  • Unsanitary condition

    Pests

    Nov 13, 2025 · Apt THEDRA

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H2)
Year built
2017
Floors
22
Residential units
—
Building area
56,572 ft²
Lot area
4,246 ft²
Zoning
M1-9A/R12
Community board
105
Council district
4
Block / lot
838 / 54
Assessed value
$12,290,850
Landmark / historic district
No

HPD registration #145157, last renewed Jul 14, 2025.

Questions about 4 West 37 Street

Who owns 4 West 37 Street?

The owner of record in NYC Department of City Planning PLUTO data is 4 West 37th Street LLC.

Does 4 West 37 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 4 West 37 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 4 West 37 Street built?

City records list 2017 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.