980 Avenue Of The Americas

Manhattan, NY 10018BBL 1-00838-0001Map

Owner of record: Vbg 990 Aoa LLC

980 Avenue Of The Americas is an elevator apartment building built in 1986 in Manhattan, 10018. It has 380 residential units across 24 floors. The owner of record is Vbg 990 Aoa LLC. HPD has recorded 22 housing violations here, most recently on April 29, 2026. 2 of the 22 most recent violations are still open.

HPD violations
22
DOB violations
80
ECB violations
70
HPD complaints
216

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 22

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 1114, 11th story, 1st apartment from west at north

    Mar 9, 2026 · Apt 1114

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1114, 11th story, 1st apartment from west at north

    Mar 21, 2024 · Apt 1114

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 809, 8th story, 2nd apartment from south at west

    Nov 9, 2022 · Apt 809

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 809, 8th story, 2nd apartment from south at west

    Nov 9, 2022 · Apt 809

    Closed — Violation dismissed
  • C

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story, section at north

    Jan 30, 2022

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1008, 10th story, 3rd apartment from south at west

    Oct 22, 2019 · Apt 1008

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
Show 12 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • A

    Replace with new the missing electrical outlets cover at east wall at public hall, 1st story

    Jun 27, 2019

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Jan 9, 2019

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 5, 2018

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 13, 2015

    Closed — Violation dismissed
  • B

    Properly secure the loose wood floor tiles, in the 2nd room from east located at apt 5m, 5th story, 2nd apartment from west at north

    Feb 22, 2012 · Apt 5M

    Closed — Violation dismissed
  • B

    Provide adequate supply of cold water for the fixtures at the sink, in the kitchen located at apt 5m, 5th story, 2nd apartment from west at north

    Feb 22, 2012 · Apt 5M

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures in the sink, in the kitchen located at apt 5m, 5th story, 2nd apartment from west at north

    Feb 22, 2012 · Apt 5M

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 5m, 5th story, 2nd apartment from west at north

    Aug 4, 2011 · Apt 5M

    Closed — Violation dismissed

DOB building violations · 80

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 29, 2024

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 11, 2021

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 11, 2020

    Dob violation - dismissed
Show 40 more ↓
  • Construction other optional

    The permit holder on record, has informed the department that he/she has withdrawn from the project under application #123508962, work 50% completed.

    Aug 14, 2020

    Dob violation - dismissed
  • Construction other optional

    The permit holder of record, has informed the department that he/she has withdrawn from the project under application #123579387, work (50%) completed.

    Aug 14, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 19, 2019

    Dob violation - dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 9, 2019

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jun 28, 2019

    Vp*-violation unserved ecb- dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 21, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building due to vehicle striking sidewalk

    Aug 23, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 12, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 27, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 13, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 13, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 18, 2008

    Dob violation - resolved

ECB violations · 70

  • Class - 1

    Class 1: failure to report an elevator accident promptly. accident occurred on 4/22/2025 at 4:15pm.

    Apr 30, 2025

    Resolve
  • Class - 2

    At the time of my inspection observed active work on exp#2 -supported scaffold removal installed on shed extended 5 feet only-upon revie of ssp it reflects that shed shall be extended 20 feet to adj property

    Oct 3, 2024

    Resolve
  • Class - 2

    Observed sidewalk shed installed at exp#2 and #4-extended to adj property aprox 5-6 feet with supported scaffold installed on top(5-6 feet from end of sws)- active work supported scaffold removal-as per bc3307.

    Oct 3, 2024 · Penalty $2,400

    Resolve
  • Class - 1

    Atoi on an active jobsite, observed electrical work being done throughout the entire premises. doing a search on bis reveal to me that no permit was issued for electrical work for that jobsite., obtain permit

    Feb 6, 2024 · Penalty $1,630

    Resolve
  • Class - 1

    Atoi i observed worker actively performing electrical work on the first floor of the site. worker unqualified/ holds no license for electrical work, comply with ec code

    Feb 6, 2024 · Penalty $4,830

    Resolve
  • Class - 1

    Atoi, of an active jobsite, observed unsafe & unsuitable electrical conditions creating a potential electrical hazard. exposed live wires, non-gfci protected wiring, open covers, make-shift extension cords/plug

    Feb 6, 2024 · Penalty $1,630

    Resolve
  • Class - 1

    ? atoi on an active jobsite, observed workers on a working platform installed at the center of store, upon request for logs& dd for load capacity, installation none were provided. stop all work of temp platform

    Feb 6, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Atoi on an active jobsite, observed inadequate housekeeping on 1st floor and up. housekeeping consisting of building materials, debris and equipment laying on floors hindering egress, creating a trip and fall h

    Feb 6, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain exterior building walls and appurtenances.as notedat time of inspection i observed on exposure#3 & 4:damaged defective balcony(rail)balusters on the top balconies at these exposures.rem:main

    Oct 19, 2021 · Penalty $625

    Resolve
  • Class - 2

    27-929.1 failure to complete installation of full system of automatic sprinklers and file final sprinkler report prepared by registered design professional by july 1, 2019 in an office building 100 feet or more

    Aug 17, 2021 · Penalty $3,125

    Resolve
Show 40 more ↓
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. note:observed roof level-water tower roof damaged/collapsed. remedy:maintainexterior bldg facade and appurtenances. provide safety measures and re

    Feb 8, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Sec. 3314.10.2 supports(c-hook & parapet). at the time of inspection of an active jobsite observeed,suspended scaffold at exp#1 w/support if c-hook was hanging on parapet wall,when i asked to see the engineer

    Nov 18, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at the time of inspection of an active jobsite observed,at the roof level exp#1,there were workers performing work on the top of

    Nov 18, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3314.4.3.2 suspended scaffold installation inspection. at the time of inspection of an active jobsite observed,suspended scaffold being installed at exposure#1 and workers were performing work on it,when i a

    Nov 18, 2020

    Resolve
  • Class - 2

    Sec. 3314.4.3.1 inspection prior to the installation of suspended scaffold. at the time of inspection of an active jobsite observed,suspended scaffold at exp#1,upon request for prior inspection of installation

    Nov 18, 2020

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35407537m issued on 08/15/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work contrry to stop work order. remedy: comply w/c

    Oct 13, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain exterior bldg facade & appurtenances.exposure 3,south elevation courtyard:observed defective brick work at 2 different locations to accommodate duct.remedy:maintain exterior bldg facade,rep

    Oct 6, 2020 · Penalty $1,280

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at time of inspection on a 24 stry alt job site,observed side walk shed.observed missing caps from the bolts that can create hazardous condition for

    Oct 1, 2020

    Resolve
  • Class - 2

    Project information panel sidewalk shed parapet panel/construction sign not provided or not in compliance with section.note:at time of my inspection on a 24 story alt bldg jobsite observed sidewalk shed in plac

    Oct 1, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Work w/o permit. at time of inspection on a 24 story building,observedsidewalk shed installed at exp#1,2&4. found business signs "hollingsworth" installed on the parapet of the sws. no permit found on dob recor

    Sep 29, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Work contrary to stop work order at time of my inspection in response to compliant i observed delivery of construction material in progress.upon review of dept records swo for all work under permit#123579387 is

    Aug 15, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Housekeeping at time of my inspection i observed 6 pile of construction debris and material at 1st floor.also at various locations on 1st floor not placed in code compliant bins/containers as required by code.r

    Aug 15, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    A.c. 27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019 in an office building 10

    Jul 13, 2020

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.at time of my inspection of an active site w/facade repair construciton activities for 24 story bldg,upon review of suspended

    Jul 1, 2020

    Resolve
  • Class - 2

    27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin

    Nov 15, 2019 · Penalty $3,125

    Resolve
  • Class - 1

    Work without a permit.-note at time of inspection observed concrete oprations in progress,pumping of concrete to pour 1st floor slab after reviewing permits observed no concrete work allowed under alt 2 permits

    Oct 9, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water procedures at construction site.note:at time of inspection observed concrete operations in progress at 1st floor of a 24story building.observed contractor using

    Oct 9, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents or approved amendments ssp and tpp at time of inspection of an exitsing 24 story residential building under facade restroration i observed suspended scaf

    Jun 28, 2019

    Resolve
  • Class - 1

    3314.1:unsafe rigging/suspeneded scaffold not built as per code.at time of inspection of an existing 24 story story building under restoration i observed several suspended scaffold tie backs and lifelinge attac

    Jun 28, 2019

    Resolve
  • Class - 1

    Sec. 3307.4.6 prohibited outdoor ad co sign on sidewalk shed. at the time of inspection of an active jobsite i observed commercial advertisement on the sws parapet. parapet was fully wrapped w/advertisement con

    Jun 27, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Bc 3303.10.1 no tenant protection plan. at time of inspection on an active job site of a 24 story building i observed that building is occupied by tenants and i observed tenants secondary means of egress is lea

    Mar 30, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 802195. remedy: submit required technical report.

    Oct 15, 2018 · Penalty $625

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification. note: at time of inspection i observed sidewalk shed w/the following objections: vertical post around driveway not secured to ground as per code 3307.6.4.

    Jun 26, 2018 · Penalty $2,400

    Resolve
  • Class - 1

    Work w/out a permit noted:plumbing work propose under job #12304246 shown on plan & schedule 13 (3 new (outlets),3 new lavatory 2 new non residential sink ,sanitary & water piping) have been done w/out plumbing

    Mar 2, 2018

    Resolve
  • Class - 2

    Work without a permit.work noted:in apt.#20l having erected full height partitions to create 2 additional bedrooms with a key locked door.rem:obtain permit.

    Nov 6, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.lack of a system of automatic sprinklers where is required as per bc 903.2 and 27-954 for sro use for apt#20l.previous violation #35220330p,35157413y.rem:discon

    Nov 6, 2017 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain bldg in code-compliant manner.failure to provide number of required means of egress for every fl.per bc1018.1 and 27-366for sro use for apt#20l.rem:discontinue illegal occupancy.

    Nov 6, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Multiplies dwelling converted maintaining or occupied with 3 or more additional dwelling units than legally authorized by the certificate of occupancy #92770.now apt#20l illegally converted into 4 sro units.rem

    Nov 6, 2017 · Penalty $8,000

    Resolve
  • Class - 1

    Bc907.2.8 failure to provide fire alarm system for sro use for apt.#20l.previous violation #35221331r.rem:discontinue illegal occupancy.

    Nov 6, 2017 · Penalty $4,000

    Resolve
  • Class - 2

    Permanent dwelling used/converted for other than permanent residentialpurposes.c/o #92770 indicates bldg to be legally approved as a class "a" m.p now apt #8p illegally used/converted for transient use w. 3 fur

    Jan 13, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.lack of a system of automatic sprinklers where required per bc 903.2 &27-954 for transientuse.rem:discontinue illegal occupancy.

    Jan 13, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner.failure to comply w.maximum flr area requirements per occupant local as per m.p.l sec #31 hmc 27-2075. having 3 furnished rooms w. up to 4 beds housing guest fo

    Jan 13, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    907.2.8 failure to provide fire alarm system for transient use.rem:discontinue illegal occupancy.

    Jan 13, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the cofo #92770.illegal occupancy noted: apt#15l converted for total 4 sros where c/o indicates class a apt. rmdy: discontinue illegal occupancy.

    Jan 13, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. lack of a system of automatic sprinklers where required per bc 903.2; 27-954.noted: apt15l converted into 4 sro's w/o providing sprinklers.rmdy:discontinue

    Jan 13, 2015

    Resolve
  • Class - 3

    Work w/o a permit.noted:erected two walls,each 12"from ceiling to create two bedrooms.noted location:apt #15l.note:walls are studded sheetrock & entry doors are folding.rem:obtain permit or restore premises to

    Oct 9, 2014

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: at garage 1)spalling concrete ceiling adjacent to b3.2,b3.1,b10.9. 2)spalling & crumbling concrete floor slab w/exposed rebars adjacent to a17. 3)exit

    Nov 10, 2013 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain in code compliant manner per bc712.3;27-345 no fire stopping. noted: at garage,missing fire stopping in cmu block fire wall adjacent to b4.3 w/pipe penetration. remedy: provide/maintain fire

    Nov 10, 2013

    Resolve
  • Class - 2

    Work w/o permit. noted: at garage entry,installed illuminated businesssign w/wording "icon 24hr. parking". no permit has been issued for theilluminated wall sign. remedy: obtain a permit.

    Nov 10, 2013

    Resolve
  • Class - 2

    Misleading job site sign. noted: job sign w/o permit # & expiration date. picture filed. remedy: comply w/dob code requirements.

    Sep 12, 2013 · Penalty $400

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Feb 5, 2026 · Apt STORE

    Close
  • Electric

    No lighting

    Jan 29, 2026 · Apt 319

    Close
  • Electric

    Power outage

    Jan 29, 2026 · Apt 319

    Close
  • Plumbing

    Bathtub/shower

    Jan 29, 2026 · Apt 319

    Close
  • Plumbing

    Basin/sink

    Jan 29, 2026 · Apt 319

    Close
  • Appliance

    Refrigerator

    Jan 29, 2026 · Apt 319

    Close
  • Appliance

    Electric/gas range

    Jan 29, 2026 · Apt 319

    Close
  • Heat/hot water

    Entire building

    May 6, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 6, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 22, 2024 · Apt 619

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Mar 21, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 16, 2024 · Apt 1114

    Close
  • Heat/hot water

    Apartment only

    Mar 14, 2024 · Apt 1114

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2023 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Dec 3, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 3, 2023 · Apt PH05

    Close
  • Unsanitary condition

    Pests

    Nov 1, 2023 · Apt 708

    Close
  • Unsanitary condition

    Pests

    Aug 16, 2023 · Apt 509

    Close
  • Unsanitary condition

    Pests

    Aug 1, 2023 · Apt 708

    Close
  • Unsanitary condition

    Pests

    May 29, 2023 · Apt 708

    Close
  • Unsanitary condition

    Pests

    Oct 30, 2022 · Apt 809

    Close
  • Heat/hot water

    Apartment only

    Oct 30, 2022 · Apt 809

    Close
  • General

    Signage missing

    Jun 17, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 16, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 16, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 16, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 16, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 22, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2022 · Apt 515

    Close
  • Safety

    Fire escape

    Feb 18, 2022 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 18, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 16, 2022 · Apt BLDG

    Close
  • Elevator

    Maintenance

    Feb 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 2, 2022 · Apt 18K

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2022 · Apt 18K

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
1986
Floors
24
Residential units
380
Building area
386,382 ft²
Lot area
21,825 ft²
Zoning
C6-6
Community board
105
Council district
4
Block / lot
838 / 1
Assessed value
$64,465,650
Landmark / historic district
No

HPD registration #140464, last renewed Jul 9, 2025.

Questions about 980 Avenue Of The Americas

Who owns 980 Avenue Of The Americas?

The owner of record in NYC Department of City Planning PLUTO data is Vbg 990 Aoa LLC.

Does 980 Avenue Of The Americas have violations?

Yes. NYC HPD has recorded 22 housing violations at this property.

Is 980 Avenue Of The Americas rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 980 Avenue Of The Americas built?

City records list 1986 as the year it was built.

How many apartments are in 980 Avenue Of The Americas?

It has 380 residential units and 395 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.