28 West 36 Street
Manhattan, NY 10018BBL 1-00837-0062Map
Owner of record: 28 West 36th Holdings LLC
28 West 36 Street is an office building built in 1911 in Manhattan, 10018. The owner of record is 28 West 36th Holdings LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 67
- ECB violations
- 44
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 67
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 1, 2024
Dob violation - dismissed - Construction other optional
Emergency work order due to deteriorated fire escape located at rear facade south elevation exposure#3 remedy: owner to immediately retain nys pe+lic gc to repair fire escape under full time nys pe on site supervision .start work immediately and continue daily until repairs are complete.provide safety guaard 24 hours untill repair complete
Nov 17, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Aug 18, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2019
Dob violation - resolved - Elevator elevatorrequired
Cease use
Sep 5, 2018
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Jun 30, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2014
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 5, 2011
Dob violation - resolved - Construction other optional
Work w/out permit
May 8, 2010
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 2, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 44
- Class - 1
Failure to take required measures to secure public safety-unsafe facade.unsafe filing tr6-902191-9b-i1,dated 8/18/2023 found building to have unsafe conditions width required safety measure to be put in place.n
Sep 29, 2025
Resolve - Class - 2
A. c. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or mor
Jun 17, 2024 · Penalty $6,250
Active - Class - 2
Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #902191. remedy: file acceptable report.
Jan 16, 2024
Resolve - Class - 1
Failure to comply with commissioner's order. dob violation #111723fa0501mh date 11-17-2023 to retain nyspe and licensed gc to repair fire escape under full time nyspe onsite supervision. as today 12-07-2023, wo
Dec 7, 2023 · Penalty $12,500
Active - Class - 1
Failure to maintain exterior facade and appartenances. at south elevation, exposure #3 observed deteriorated fire escape, failing connections, severly deteriorated and falling landing members. also observed big
Nov 17, 2023 · Penalty $2,500
Resolve - Class - 2
As per fuel oil tank for boiler in cellar of 28 w 36th st. ny 10018; oil spilled on floor in tank rm.-oil tank and oil lines including piping to boiler room corroded-oil tank corroded and base of tank show sign
Jun 21, 2023
Resolve - Class - 1
At time of inspection observed existing fire escape on rear yard instate of disrepair conditions including rotten metal, holes, loose connections and leaning with unstable cellar to 2nd floor level. also observ
Jun 21, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed erected temporary inadequate adjustable screw jack shoring underneath fire escape balcony 2nd to cellar level. no permit for shoring in dob record., obtain all permits
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
As per one rockmills, mp -90 h'tg boiler. no belt guards at oil pumps-tube door gaskets not sealed-soot spilling from boiler-dawgs missing from tube doors-pressuretrol cover missing-no backflow drain-no body dr
Jun 21, 2023 · Penalty $312
Resolve - Class - 2
27-929.1 failure to complete installation of full system of automatic sprinklers & file final sprinkler report prepared by registered designprofessional in office bldg 100 ft or more in height in existence on
Feb 28, 2023 · Penalty $6,250
Active
Show 34 more ↓
- Class - 2
27-929.1 failure to complete installation of full system of automatic sprinklers and file final sprinkler report prepared by registered design professional in office building 100 feet or more in height in exist
Nov 1, 2021 · Penalty $3,125
Active - Class - 2
A.c. 27-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019 in an office building 10
Jul 13, 2020 · Penalty $3,125
Active - Class - 2
27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin
Nov 15, 2019 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#802191. remedy: file acceptable report
Aug 1, 2018 · Penalty $1,562
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:at time ofinspection i observed sidewalk shed on site with the following objections.damaged missplaced mudsills-damaged tamper proof light fixture dis
Jul 20, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. north elevation exp1, observed cracked water table decorative stone on 11th floor north west corner; west elevation exp4,observed spalled and loos
May 9, 2018 · Penalty $3,125
Resolve - Class - 2
Work without permit for temp.construction equipment.note:at time of inspection i observed sidewalk shed in place without valid permit.rem:comply with code provide permit.
Oct 2, 2017 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site.expd permit.note:at time of inspection i observed sidewalk shed on site w/an expd permit.permit expd as of date:7/25/17.rem:renew permit.
Aug 31, 2017
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note:at time of inspection i observed sidewalk shed in need of maintenance.objections include but are not limited to-damaged out of place mudsills.-expos
Aug 31, 2017
Resolve - Class - 2
Failure to file acceptable amended reprot indicating correction of unsafe conditions described in initial local law 11/98 report.rmdy: file acceptable amended report.
Nov 7, 2016 · Penalty $800
Resolve - Class - 1
Failure to provide safety measures such as sidewalk shed,fence etc to protect public from unsafe conditions as per 1rcny 103-04 and as per notification of unsafe conditions complaint #1400142 by ra/pe dated 6-
Sep 28, 2015 · Penalty $12,000
Resolve - Class - 2
Electrical work w/o a permit on 7/30/15 @ 12:20pm i observed: new branch circuit,fixtures,receptacles,switches 1st fl store style. an application for cert of electrical inspection is not on file. remedy: obtain
Jul 30, 2015 · Penalty $4,000
Active - Class - 2
Electrical work w/o a permit on 7/30/15 i observed: electrical sign. electrical sign had been installed prior to inspection. a electrical permit for such sign was not obtain. sign is 1ft x 10ft w/lettering.
Jul 30, 2015 · Penalty $4,000
Active - Class - 2
Work w/o a permit; installation of lavatory inspection time: 1:20 on 7-22-15, i observed in commercial space on ground level named "in style nyc" a small lavatory consisting of a water closet and basin.there
Jul 22, 2015 · Penalty $4,000
Active - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jul 14, 2014 · Penalty $4,000
Resolve - Class - 2
Failure to maintain building in code-compliant manner. failure to comply with law for drainage system per pc702.1;27-911.observed a cracked 4" drainage pipe in bathrm at 8th flr rm800.rmdy:obtain permit from do
Oct 10, 2012 · Penalty $250
Active - Class - 1
Work w/permit. noted: at roof: vertical extension of existing elevator bulkhead, installation of sky light and installation of 18"x18"x1 1/2" concrete pavers on entire roof deck without permit. appl #120233390
May 8, 2010
Resolve - Class - 3
76b7.76b7 provide proper length pull out on car safety tail rope 42" max
Feb 17, 2010 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. noted: 12 fl interior northwest column cracks in bricks and pulling away from wall. rem: repair and/or replace.
Dec 15, 2009 · Penalty $500
Resolve - Class - 1
97## unlawful acts failure tio comply w/commissioner's order set forth in oringinal nov 38207025l by continuing to use device after cease use order operating device under cease use order
Oct 26, 2009
Resolve - Class - 1
32h10 40p16.cu 17l11 hoistway door gibs are coming off teh 7 and 5th fl and 4 and 2nd fls and 1st fl they are also loose on the 4 and 5 and 8 and 10 fls before returning back to service call dob at 212 566-5542
Oct 23, 2009 · Penalty $1,000
Resolve - Class - 3
Failure to maintain bldg in code-compliant manner. noted: approx 84 sf6"x 6" x 3/8" wood floor tiles are dislodged in 2 areas of the floor, also there is no door saddle. remedy: repair/replace missing tiles &
Sep 4, 2008 · Penalty $500
Active - Class - 3
03d06.21h11.16b01.17b07.17d06.55bb12.54bb12.70o02.39o02.97o02.41m07.40o02.45o02.98o02.59o02.56y13. 03 secure safetuy plate on cab fl 21 replace worn door lock roller on fl #9 16 hoist way door not plumb on fl
Jul 2, 2008 · Penalty $500
Resolve - Non-hazardous
48b13,36o2,62o02, 48-reshackle cables clean car top,clean pit
Apr 29, 2003 · Penalty $180
Resolve - Non-hazardous
48b13,36o02,62o02, 48-reshackle cables, clean car top, clean pit
Apr 29, 2003 · Penalty $180
Resolve - Non-hazardous
33x11/74o02/74m07/09h11/16h11/15h10/62m07/20b11////33x11 overhead lighting inoperative repair provide guard 74o02 clean top of car 74m07 provide 4x4 box cover top of car 9h11 repair car door gibs 16h11 repair
Mar 26, 2002 · Penalty $180
Resolve - Non-hazardous
50d06/16l11/60m07/11q03/ 50-d-06 properly secure motor leads to motor 16-l-11 screw missing door gib 12 fl 60m07provide buffer spring pit missing 11q03 provide guard cab lighting
Mar 26, 2002 · Penalty $180
Resolve - Non-hazardous
14b07. provide location and time of managers or supers office as per section 27-1004 of building code.
Aug 22, 2001
Resolve - Non-hazardous
53x11,35y2,36w6,33w6,33o2,33x11,74m7, 33 x light, 74 fire service as per code
May 24, 2001 · Penalty $350
Resolve - Non-hazardous
22h7,74m7,10i11,15j1,36w6,53i11,33w6,33o2,33x11, 22-per code, 74 fire service as per code, 33 light
May 24, 2001 · Penalty $350
Resolve - Non-hazardous
75u, five year test.
Dec 28, 1998
Resolve - Non-hazardous
(74) file and obtain permit for dismantling or removal and have inspected by a member of this dept.
Apr 9, 1992
Resolve - Non-hazardous
Failure to provide adequate emergency power exit lights in tenant space throughout building. failure to provide adequate emergency power exit signs in tenant spaces throughout building. remedy:install emergency
Mar 10, 1992 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior building wall defects is a horizontal cracks at west sout side bricks cracks loose and bulging between 9 & 10 10 and 11 floor. remedy make all repairs to the satisfaction of this de
Nov 3, 1988
Resolve
Complaints
- General
Doors
Oct 19, 2004 · Apt 0
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Apr 16, 2026 | $15,700,000 | Office buildings | 1 |
Building details
- Building type
- Office building (O6)
- Year built
- 1911
- Floors
- 12
- Residential units
- —
- Building area
- 58,186 ft²
- Lot area
- 4,906 ft²
- Zoning
- M1-9A/R12
- Community board
- 105
- Council district
- 4
- Block / lot
- 837 / 62
- Assessed value
- $7,032,150
- Landmark / historic district
- No
Questions about 28 West 36 Street
Who owns 28 West 36 Street?
The owner of record in NYC Department of City Planning PLUTO data is 28 West 36th Holdings LLC.
Does 28 West 36 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 28 West 36 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 28 West 36 Street built?
City records list 1911 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.