960 Avenue Of The Americas is a hotel built in 1954 in Manhattan, 10001. The owner of record is Atlantic 960 Corp. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
115
ECB violations
52
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 115

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 14, 2021

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2020

    Dob violation - active
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 8, 2020

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 1, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Mar 17, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    Cease use

    Sep 6, 2018

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jun 24, 2018

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2016

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 30, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 28, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 23, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2013

    Dob violation - resolved

ECB violations · 52

  • Class - 1

    Class 1: restore to service & call nycdob for inspection.

    Nov 29, 2022 · Penalty $6,250

    Active
  • Class - 2

    Failure to maintain exterior building facade and appurtenances.*south elvation exp#1 observed defective glass panel at parapet of rooflevel.* east elevation exp#4 observed cracked stucco facade on various floor

    Jan 26, 2019

    Resolve
  • Class - 2

    Removal of safety measures/sidewalk shed without department approval.a note:at time of inspection building facade was still designated as unsafe,the amended report (trg)filed on 1/22/2019 has not been accepted

    Jan 26, 2019

    Resolve
  • Class - 1

    Cu - 88i11. right handrail damaged repalce. call 1212-566-5542.

    Oct 6, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    28-317.3 failure to register cooling tower.rem comply w/ code.

    Sep 21, 2015

    Resolve
  • Class - 1

    Sec. 28-105.1. work w/o an after variance permit. at approx 8:20 am, observed workers at site remov(ing) construction debris in black bags from lobby and throwing them in dumpster at front of bldg at 4th flr

    Dec 15, 2012

    Resolve
  • Class - 1

    Failure to have site safety manager present as required. note at time of inspection work in progress under alt permit #120520542. observed worker removing accumulated amount of construction debris in blackbags

    Dec 15, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Missing vandal proof fixtures at exposure #1 by entry gates. exposure #1 by entry gates. exposed electrical wires at exposure #4. pictures dated. remedy: comply w/dob code requirements.

    Nov 20, 2012

    Resolve
  • Class - 1

    Sec. 3301.1.2 failure to comply w/nyc fire code. general - no permit for oxygen,acetylene,prepair tar kettle,diesel,kerosene etc. noted: at 18 story building under alteration #120520542 for conversion existing

    Aug 7, 2012 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations.noted:during installation of suspended scaffolds at exp #3, 18 fl level, window was broken at adjusted property.pictures dated.

    Jun 5, 2012 · Penalty $2,400

    Resolve
Show 40 more ↓
  • Class - 2

    Sidewalk shed does not comply to dob code requirements. noted: exp #4 shed not (tight) to facade and not (sealed). pictures dated 5.9.12. remedy: comply w/dob code requirements. seal(ed) facade.

    May 9, 2012 · Penalty $2,400

    Resolve
  • Class - 2

    Sec. 3308.3 vertical safety netting not per code & inadequate. at time of inspection observed safety netting installed at bulk head extension below the required height of 60",& at some area missing & unsecure.

    May 1, 2012 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3301.2 failure to provide adequate means of egress. at time of inspection observed metal stair fron main roof leading to bulkhead. extension inadequate & not as per code a portion of the stair is approx 18

    May 1, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved construction documents. at time of inspection observed roof protection partially installed not according to site safety plan that show 20' up to building ( ) of adjacent

    May 1, 2012 · Penalty $250

    Resolve
  • Class - 1

    95x10,95j10,69m07,97o02,68m07,42b07. *cease use items* 95x- provide working missing step switches prior to the gap as per 805.1(r) 95j- properly align demarcation strip switches for proper operation.67m-provide

    Mar 27, 2012 · Penalty $1,000

    Resolve
  • Class - 1

    95x10,95j01,68m07,69m07,97o02. *cease use items 95x- provide working missing step switches prior to the gap as per 805.1(r) 95j- property align demarcation stop switches for proper operation.*

    Mar 27, 2012 · Penalty $1,000

    Resolve
  • Class - 2

    3301.2.: failure to maintain safety measures. note: at time of inspection building under alteration. observed hole penetration for duct workunsecured and not shot down as required by code. holes are approximate

    Dec 19, 2011 · Penalty $400

    Resolve
  • Class - 1

    Failure to maintain essential required elements of building alteration work to existing building. contractor has disconnected siamese connection from wet system that is functioning & has connected it to a temp

    Nov 4, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Sprinker system removed on fl 3-17 w/o a permit stop all work on fls 3-17 except to make safe rem: obtain permit or restore premises to prior legal condition

    Oct 3, 2011 · Penalty $800

    Resolve
  • Class - 2

    Sprinkler system being installed on 7fl w/o a permit stop all sprinkler work on 7fl rem: obtain permit or restore premises to prior legal condition

    Oct 3, 2011

    Resolve
  • Class - 1

    Note: pursuant to section 28-207.2.1 of a/c n.y.c. you are here by ordered to immediately stop all work at above premises. stop all work. work w/o permit.at time of inspection i did observe at all working floor

    Oct 3, 2011 · Penalty $800

    Resolve
  • Class - 1

    Sec. 3301.2 failure to provide 3'ft 6"inch guardrail or equivalent around all floor & perimeter openings. at time of inspection i did observe at all working floors (approx) 12 levels. holes not covered or holes

    Oct 3, 2011 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3309.10 failure to protect adjoining (rocks),sky lights,chimneys & outlets affected by construction or demo operations. at time of inspection i did observe plans w/no roof protection plan for adjoining

    Oct 3, 2011 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to safeguard all persons affected by construction operations. at time of inspection i did observe at the street level floor a fire extinguisher that was discharged making it ( ) while in

    Oct 3, 2011

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvalamendments. at time of inspection i did observe at all working floors inadequate floor covers,step tread( ) & platform & a partition

    Oct 3, 2011 · Penalty $250

    Resolve
  • Class - 2

    Sec. 1704.1 failure to file a special inspection statement of responsibility prior to permit issuance & prior to start of work under specialinspection requirement. at time of inspection i did observe at several

    Oct 3, 2011

    Resolve
  • Class - 2

    Failure to file an architect / engineer report certifying exit / directional signs are connected to emergency power source / storage batteryequipment. remedy : file architect / engineer report

    Jan 27, 2010 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to file affidavits and/or comply w/ other requirements set forth for photoluminescent exit path marking remedy: comply w/ requirements of reference standards (rs)6-1

    Sep 25, 2008

    Resolve
  • Non-hazardous

    84l10. #84-l-10 communications defective no signal. repeat of violation #38/62431k. cure dates & hearing date changed.

    Oct 24, 2006 · Penalty $180

    Resolve
  • Non-hazardous

    84l10: repair communications and signal emergency.

    Oct 24, 2006

    Resolve
  • Non-hazardous

    58-b-02/84-l-10/58-b-02-oil an brake lining/84-l-10-intercom defective no signal or communication repair

    Oct 24, 2006

    Resolve
  • Non-hazardous

    85bb05/42o07/74b14/64l10/66o02/38o02/33o02

    Oct 2, 2006

    Resolve
  • Non-hazardous

    86-m-05,80-i-11,78-d-06,84-j-01,m-07,58-b-01/86-no 2 yr test, perform & file test/80-demeretion strips damaged on some steps;replace/78-loose combplate @ top end of unit, tighten/84-check alignment of bottom

    Jul 14, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    86-m-05,80-i-11,78-d-06,-m-07,84-i-11/86-no 2 yr test tag;perform & file test/80-demarestion strips damaged on some steps;replace/78-loose combplate @ bottom of unit;tighten deck barricades missing provide

    Jul 14, 2006 · Penalty $350

    Resolve
  • Non-hazardous

    83x10. (83)demareation lights inoperative,repair.

    Jun 29, 2005

    Resolve
  • Non-hazardous

    23b10 #23-b-10- 1st fl.

    May 6, 2005

    Resolve
  • Non-hazardous

    36o02/66o02/67o02/68o02/38x10/39o02/64x10 (38-x-10)repair light & guard car top (39-o-02)clean machine room of paint chips

    May 14, 2004

    Resolve
  • Non-hazardous

    44m07,69m07,38m07,66o02,38o02,67e07,51m07,52m07,44m07,39b10,44d06,59x10,34b09. (44-m-07) provide 5 year test tag on governor (69-m-07) provide 5 year tag on buffer (38-m-07) provide 5 year tag top of car (67-e

    Jan 9, 2004

    Resolve
  • Non-hazardous

    44m7/38m7/69m7/66o2/38o2/51m7/52m7/38m7/39m7/44d6/39o2/39d6/73m7.44m7=5yr tag provide.38m7=provide 5 yr tag.69m7=provide 5yr tag.51m7=cable data tag.52m7=cable data tag.38m7=light guard top of car.39m7=provide

    Jan 9, 2004 · Penalty $350

    Resolve
  • Non-hazardous

    56y10/44m7/38m7/69m7/38o2/66o2/56a10/39m7/34i10/44m7/71m7/51m7/52m7.56y10=oil leak shaft bearing.44m7=provide 5yr tag.38m7=provide 5yr tag.69m7=provide 5yr tag.56a10= encoder altered remove string.39m7=provide

    Jan 9, 2004

    Resolve
  • Hazardous

    80m11/84l10/84m7/84d6/83p16/77m11 80m11-(missing one broken one)step tread plastic end piece 54l10-shut off switch for missing tread is bypassed 84m7-barricades between devices missing 84d6-loose decking screw

    Nov 12, 2003 · Penalty $500

    Resolve
  • Non-hazardous

    80i11/84m7/83p16 80i11-plastic & read ends,replaced any damaged or chipped pieces.84m7-missing barricades between escalators 83p16-call within 10 days to schedule full inspection as per elv-24 form.

    Nov 12, 2003

    Resolve
  • Non-hazardous

    86,u,05 39,x,07 86 perform and file 5yrs test 39 provide lighting in secondary elevator equipment room

    Oct 22, 2003

    Resolve
  • Hazardous

    73## operating elevator without an equipment use permit (certificate): remedy call 312-8738 t oarrange for appointment to test device ea or ebn.

    Jun 29, 2001

    Resolve
  • Non-hazardous

    14 b 07, 14-b-07, provide location of managers office as per code r:s-18 section 27-1004

    May 31, 2001

    Resolve
  • Non-hazardous

    14b07 14-b-07 provide location of managers office as per code section 27-1004 r.s18

    May 31, 2001

    Resolve
  • Non-hazardous

    35d06-35i11-36x11-35d06-53x11-53x11-53x09 (35-d-06)properly secure ventilation m/r seal,provide grill(35-i-11)repair railing to secondary(36-x-11)provide m/r door to code(35-d-06)provide safe access to secondar

    May 16, 2001

    Resolve
  • Non-hazardous

    36/m/07 74/d/06 73/0/02 57/0/02 53/x/11 74/p/17 35/#/# 35/#/09 (74-0-02) clean entire device (53-x-11) repair lighting secondary (74-p-17) provide repair access to secondary (35/#/#) provide safe acces to m/r t

    Apr 23, 2001

    Resolve
  • Non-hazardous

    Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems remedy file report

    Jul 25, 1996

    Resolve
  • Non-hazardous

    46k.

    Apr 4, 1996

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H3)
Year built
1954
Floors
18
Residential units
—
Building area
100,738 ft²
Lot area
7,430 ft²
Zoning
C6-6
Community board
105
Council district
4
Block / lot
837 / 1
Assessed value
$19,279,350
Landmark / historic district
No

Questions about 960 Avenue Of The Americas

Who owns 960 Avenue Of The Americas?

The owner of record in NYC Department of City Planning PLUTO data is Atlantic 960 Corp.

Does 960 Avenue Of The Americas have violations?

NYC HPD has no housing violations on record for this property.

Is 960 Avenue Of The Americas rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 960 Avenue Of The Americas built?

City records list 1954 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.