304 5 Avenue
Manhattan, NY 10001BBL 1-00833-0040Map
Owner of record: Jsi 304 LLC
304 5 Avenue is an office building built in 2010 in Manhattan, 10001. It has 1 residential unit across 13 floors. The owner of record is Jsi 304 LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 31
- ECB violations
- 46
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 31
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Construction other optional
Boro-comm has issued a notice of immediately stop work order
Jun 12, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2010
Vw*-violation - work w/o permit dismissed
Show 21 more ↓
- Construction other optional
C-construction other optional
Jan 12, 2010
Vw*-violation - work w/o permit dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 5, 2007
Vw*-violation - work w/o permit dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2004
Dob violation - resolved - Elevator elevatorrequired
1p5795
Mar 10, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatorrequired
(15)secure top exit cover (21 & 24)reshackle, date & tag hoist cable and the drum cut cable
Oct 5, 1988
Dob violation - resolved - Elevator elevatorrequired
(51)file for removal of sidewalk elevator.(52)remove forklift that is being used in place of sidewalk car, & cease use
Jul 27, 1988
Dob violation - resolved - Elevator elevatorrequired
(15)provide top exit cover and secure.(33)basement.(44)basement (51)file necessary papers for new door and interlocks
Jul 27, 1988
Dob violation - resolved
ECB violations · 46
- Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #917282. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $10,000
Active - Class - 2
3307.6.5 failure to maintain sidewalk shed as required by code. note at time of inspection,sidewalk shed erected under job #140077306 alongexp 1 is poorly maintained in that pole supports have bolts/sharp obj
Feb 10, 2016
Resolve - Class - 2
Sidewalk shed does nto meet color specification at time of inspection sidewalk shed color is beige color location of shed is on exposure oneunder job #140077306 issued on 4/6/15 with a expiration date 4/5/16.
Feb 10, 2016
Resolve - Class - 1
Failure to provide roof protection on adjoining property."partial stopwork order" on all work w/in 20'of adjoining property issued pursuant to 28-207.2 and posted at premises:upon inspection as noted at active
May 12, 2015 · Penalty $1,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. no guardrails: "partial stop work order" on all work w/in 10'of bldg edge issued pursuant to 28-207.2 and posted at premises;
May 12, 2015 · Penalty $1,200
Resolve - Class - 1
Bc3303.8 failure to have standpipe in readiness during construction. upon inspection as noted at active construction site "partial stop work order" on all work above 75'issued pursuant to 28-207.2 and posted
May 12, 2015 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. at time of inspection observed active jobsite. at exp#3 observed pipe scaffold erected approx 12 sty. i asked to see said scaffo
Feb 3, 2015 · Penalty $250
Resolve - Class - 1
Bc3308.1.1 vertical safety netting not provided. note: at time of inspection observed active 13 story bldg in progress. bldg topped at interior ( )working.hoist in process of being removed. at 2nd flr exp#3 ver
Nov 19, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.no harness.note:at time of inspection i observed 2 men workon the 5th flr at exp#3.men installing cables to support vertical net
Nov 19, 2014 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons & property aff'ctd by const opera grdlevel.note:at time of my insp i obsrvd active nb in progress 13 storysout of the ground. interior rails wrkg throughout. at 5th fl i obsrvd
Nov 19, 2014 · Penalty $2,400
Resolve
Show 36 more ↓
- Class - 1
Sec. 3308.3;3308.4 failure to maintain vertical netting as per code requirements. observed 13 sty new bldg construction in progress - vertical netting missing ties or not cleated to the floors or supports to
Oct 15, 2014 · Penalty $1,600
Resolve - Class - 2
Sec. 3314.8 guard rail & toe board missing from supported scaffolding. at time of inspection work in progress installing panels support between 7 & 8th fl exp 1 no guard rails,end rail & toe baord installed on
Aug 19, 2014 · Penalty $400
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedammendments. noticed at time of inspection no horizontal nets providedas per site safety plan nb in progress pouring 8th fl deck. partial
Jan 21, 2014 · Penalty $1,000
Resolve - Class - 1
Sec. 3303.8 no hydrostatic test on standpipe at 75ft. noticed at time of inspection standpipe at approx 90ft no hydrostatic test provided. partial stop work order issued pursuant to 28-207.2 & posted at premise
Jan 21, 2014 · Penalty $400
Resolve - Class - 1
Failure to safe guard noticed at time of inspection. 8th fl q decking layed out no concrete & material stored on decking not secured material causing overload in weight & making a hazardous condition. partial
Jan 21, 2014 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard. noticed at time of inspection stairs(pans)not filled & landings not filled causing tripping hazards. partial stop workorder issued pursuant to 28-207.2 & posted at premises. remedy: stop
Jan 21, 2014
Resolve - Class - 1
No guard rails. noticed at time of inspection nb missing guard rails at platform for scaffold. remedy: provide guard rails as per code.
Jan 21, 2014
Resolve - Class - 1
Sec. 3303.12 hoist - failure to have elevator in readiness noticed at time of inspection no hoist in readiness nb in progress above 75ft. partial stop work order issued - pursuant to 28-207.2 & posted at premis
Jan 21, 2014 · Penalty $1,600
Resolve - Class - 1
Sec. 3303.8 standpipe not painted red. noticed at time of inspection nb inprogress standpipe not painted red thru-out entire bldg. partial stop work order issued pursuant to 28-207.2 & posted at premises.
Jan 21, 2014 · Penalty $400
Resolve - Class - 1
Sec. 3303.1.2 service line & conduit consititute & tripping hazard. noticed at time of inspection electrical cords & conduit on floors causing tripping hazards. remedy: comply w/code.
Jan 21, 2014 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: at proposed 13 sty nb at (super) structure stagew/proposed height of 163' site safety plan approved by best squad is
May 21, 2013
Resolve - Class - 2
Sec. 3310.6 fail to have designated site safety manager or ss coordinator as indicated on pw2 present or on site at mimimum every 2 weeks. no pw2(presented)at time of inspection for site safety bldg. safety log
May 21, 2013 · Penalty $400
Resolve - Class - 1
Failure to safe guard persons & property affected by construction operations.defect noted:@ entrance of property erected steel shell on job#10424778 clearly states no stell reinforcements not permitted.1 end of
May 17, 2011
Resolve - Class - 2
Work s/o a permit expired permit nb permit #104224778 expired on 12-31-2009.nb work consisted of new steel beams bearing an existing party wallsalso new decking installed.stop all work.remedy:renew permit & sub
Jan 12, 2010
Resolve - Class - 2
Work w/o a permit.expired permit fn permit #104224778 for plywood construction fence expired on 1/1/10.fence 8'high remains up facing 5th ave. remedy;renew permits.
Jan 12, 2010
Resolve - Class - 2
Obstruction of required work place exits during inspection it was notice that if workers want to leave sit they can't unless a worker accessess left gate chain to allow workers to leave.remedy:comply w/nov.
Dec 3, 2009
Resolve - Class - 2
Failure to post all required signage no signs posted on site (311 contractor).remedy:post signs forthwith.
Dec 3, 2009
Resolve - Class - 1
Bc3309.6.miscellaneous violations failure to adequatly investigate & control or prevent the inflow of ground water into the excavation site resulting in soil loss & disturbance under adjoining properties & stru
Oct 27, 2009 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard persons & property affected by const operations ntd excavation @ 304 5 ave excavated approx 6' below foundation wall of302 5 ave water pooling seeping into basement @ nw foundation wall.exp
Oct 26, 2009 · Penalty $2,400
Resolve - Non-hazardous
No permit for sidewalk shed. plan(exam)-disapproved 4-16-08. remedy: obtain a permit for sidewalk shed.
Apr 25, 2008 · Penalty $400
Resolve - Non-hazardous
Failure to weatherproof adjacent property dm#104294684 on insp existing bldg was demolitioned & site graded. water has leaked in adjacent propety cellar. (rain) water has made its way thru foundation
Jul 3, 2006
Resolve - Hazardous
Failure to safeguard public & property during demo operations.noted as:during burning & cutting operations at the south/east area of site,adj bldg # 302 sustained cracks on their marble facade.
Jun 27, 2006 · Penalty $1,500
Resolve - Hazardous
Failure to provide adequate housekeeping during demo operation. upon insp at the above property demo down to 2nd fl at front rear wall up at1st fl & over 30yds of combustible materials accumulated on 1st fl
Jun 2, 2006
Resolve - Hazardous
Failure to protect public & property during const operation. upon inspat the above property demo down to 2fl at front, 1st fl wall standing at rear & adjacent property air condition not protected
Jun 2, 2006
Resolve - Non-hazardous
No contractor's sign for side walk shed.noted:at time of inspection atthe above address sidewalk shed was erected no contractor's sign was posted for the shed as per local law 33/91.remedy:post sign.
May 21, 2006 · Penalty $400
Resolve - Hazardous
Failure to carry out demo. operations in a safe & proper manner. usingelev. shaft as a debris chute w/entire 1st fl open out onto the fl. no protection for internal stairs or 1st fl walkway. stop all work
May 11, 2006 · Penalty $2,000
Resolve - Hazardous
Fail to safeguard public and property during const. operation. upon inspection at the above property nb down to 4th floor adjacent property 4th floor wall approx. 1"diameter concrete was damage with hole in
May 5, 2006
Resolve - Hazardous
Having installed a structure(shed & scaffold)that does not comply bsa approved design.pole scaffold erected on shed at time of inspection contrary to approved applications.remove scaffold or submit amended plan
May 4, 2006
Resolve - Non-hazardous
Failure to provide design drawing for scaffold on shed at time of inspfor overload of shed. prior violation issued on 04-28-06 remedy:stop all work on scaffold provide design drawing for scaffold on shed
May 4, 2006
Resolve - Hazardous
Failure to comply with stop work order during insp wheater proofing was in progress on both adjoining properties stop work order was issued on 02-02-06 for failure to carry demolition operations in a safe and
Apr 28, 2006
Resolve - Hazardous
Failure to protect adjoining roof. at time of insp existing bldg has been demolished to 4th fl. no protection prvided for hvac system in rear of adjoing property on 1st fl. remedy:provided protection forthwith,
Apr 28, 2006 · Penalty $1,500
Resolve - Hazardous
No approved plans for pipe scaffold on sidewalk shed. during insp no design plans provided at job site for pipe scaffolding on sidewalk shed, erected over public sidewalk. remedy:provide design plans forthwith
Apr 28, 2006 · Penalty $500
Resolve - Non-hazardous
Failure to carry out demo operations in a safe & proper manner. noted: due to demo of 304 5th ave the r fire wall of 302 & 306 has been breached, at 302 approx. 4' x 3' & 3' x 5' at 306 between 3rd & 4th fl. re
Feb 2, 2006 · Penalty $2,000
Resolve - Non-hazardous
Work without a permit noted at fist floor a hole size approximtely 8'x8' cut out in the floor wiring thru 7 floor josits remedy:stop all work obtain all approvals & permits
Jun 22, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect at 2nd fl down spout at northwest corner missing no drain on the ground level remedy repair defect
Dec 19, 2003 · Penalty $350
Resolve - Non-hazardous
19m;74m; 74. provide annjunciator.
Jun 12, 1991 · Penalty $75
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O6)
- Year built
- 2010
- Floors
- 13
- Residential units
- 1
- Building area
- 25,480 ft²
- Lot area
- 2,000 ft²
- Zoning
- C5-2
- Community board
- 105
- Council district
- 3
- Block / lot
- 833 / 40
- Assessed value
- $2,976,750
- Landmark / historic district
- No
Questions about 304 5 Avenue
Who owns 304 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Jsi 304 LLC.
Does 304 5 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 304 5 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 304 5 Avenue built?
City records list 2010 as the year it was built.
How many apartments are in 304 5 Avenue?
It has 1 residential units and 9 units in total.