286 5 Avenue
Manhattan, NY 10001BBL 1-00832-0041Map
Owner of record: Zhora State Equities LLC
286 5 Avenue is an office building built in 1910 in Manhattan, 10001. The owner of record is Zhora State Equities LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 54
- ECB violations
- 40
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 54
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Construction other optional
Due to truck impacting sidewalk shed
Jun 5, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 12, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - active
Show 40 more ↓
- Facade facade optional
Cycle 7 unsafe report filed
Oct 30, 2013
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2010 cat 1 insp/tst
Aug 15, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2009
Dob violation - resolved - Emergency power none
Ll2604e-emergency power none
Mar 31, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Jun 6, 2007
Dob violation - active - Zoning none
Z-zoning none
Jun 6, 2007
Dob violation - active - Construction other optional
C-construction other optional
Mar 5, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 5, 2007
Dob violation - active - Zoning none
Z-zoning none
Jan 5, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 17, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p5435
Jul 23, 2001
Dob violation - resolved - Elevator elevatorrequired
1p5434
Jul 23, 2001
Dob violation - resolved - Construction other optional
C-construction other optional
Feb 8, 2001
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
1p5435
Jun 28, 2000
Dob violation - resolved - Elevator elevatorrequired
1p5434
Jun 28, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 15, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatoroptional
Ll16-local law 16/84 - elevator elevatoroptional
May 18, 1992
Vp-violation unserved ecb-active - Elevator elevatoroptional
1
Apr 7, 1992
Dob violation - dismissed - Elevator elevatoroptional
1
Jun 29, 1990
Dob violation - dismissed
ECB violations · 40
- Class - 2
A. c. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or mor
Jun 17, 2024 · Penalty $10,000
Active - Class - 2
27-929.1 failure to complete installation of full system of automatic sprinklers & file final sprinkler report prepared by registered design professional in office bldg 100 ft or more in height in existence on
Feb 28, 2023 · Penalty $1,280
Active - Class - 3
Work without a permit. at time of inspection observed at ground level commercial space under alteration job#m00769000, mechanical ductwork for air ventilation system installed. no dob approved mechanical drawin
Jan 11, 2023
Resolve - Class - 2
Sec. ac 27-929.1 failure to complete the installation of a full systemof automatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in
Nov 1, 2021 · Penalty $10,000
Active - Class - 2
Failure to maintain bldg exterior walls/facade & appurtenances. note: at the time of inspection view at exp#4 north elevation facing exp#3 west elevation at 12 floor horizontal crack deteriorating & crack at pe
May 11, 2021 · Penalty $620
Resolve - Class - 2
27-929.1 ac27-929.1,failure to complete installation of full system ofautomatic sprinklers&file final sprinkler report prepared by registered design professional in office bldg 100' or more in ht in existence o
Mar 30, 2021 · Penalty $5,000
Resolve - Class - 2
Sec. 27-929.1 ac 27-929.1 failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldg
Mar 30, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #802128.rem:submit acceptable required
Feb 13, 2020 · Penalty $1,250
Resolve - Class - 2
27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin
Nov 15, 2019 · Penalty $3,125
Resolve - Class - 2
Pedestrian protection does not meet code specification #3307.6.4.4. note: observed sidewalk shed vertical members are place less than 18 inches from the face of the curb line. remedy: comply w/code.
Jun 8, 2018 · Penalty $1,250
Resolve
Show 30 more ↓
- Class - 2
Work does not conform to approved plan. note: observed sidewalk shed is in place. there are 3 lines at the columns w/overhead cross braces in between that does not meet approved sw shed plans. remedy: conform
Jun 8, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file acceptable amendment report
Nov 7, 2016 · Penalty $800
Active - Class - 1
Fail to take required measures such as sidewalk shed,fence,etc to protect public from unsafe condition.unsafe cond complaint #1360337,10/23/2013.note:bulged masonry @parapet @north elev,exp #4.rem:provide safet
Nov 20, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to file an architect / engineer report certifying exit / directional signs are connected to emergency power source / storage batteryequipment. remedy : file architect / engineer report
Jan 27, 2010 · Penalty $400
Active - Non-hazardous
Failure to submit a 5th round tech. report in compliance w/code provisions:periodic insp. of exterior walls & appurtenances as required by ll 11/98 & dept. of bldgs rules & regulations.remedy:file the required
Apr 8, 2005
Resolve - Non-hazardous
10h11/17h11/27h11/31h1/5j1/56h10/40t7/85bb5/59b10/12q3/-17-replace hoistway door gibbson 1,3,7,11.27-replace worn hanger rollerson cab door & 5,9,11 hatch doors.5-adjust clutch tutting roller bases.56-hoist mot
Feb 23, 2005 · Penalty $180
Resolve - Hazardous
Cease use 16i10/25m7/5d6/18d6/12q3/72b14/58d6/85bb5/40t7/-16i10-1 flr door off track,8 flr door swing in shaft bottom of door.basement bluk missing on, part haves opening on strike post.5-properly secure frame
Feb 23, 2005 · Penalty $500
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file
Aug 20, 2004 · Penalty $1,750
Resolve - Non-hazardous
Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 198 and the department of buildings rules and regulations. remedy: file t
Nov 21, 2003 · Penalty $700
Resolve - Non-hazardous
Work without permit. sidewalk elevator has been removed. remedy: obtain permit.
Feb 8, 2001 · Penalty $2,500
Resolve - Non-hazardous
18m,74o,5i,15b,22d,28b,6d. provide inter lock cover were missing, clean top of car., replace car gate or replace, close up space basement hoist door when close, adjust or repack guides, secure switch and gate
Jul 23, 1999 · Penalty $350
Resolve - Non-hazardous
28h,75b.
Jul 19, 1999 · Penalty $180
Resolve - Non-hazardous
16m,75b. top floor door gib shoe missing.
Jul 19, 1999 · Penalty $180
Resolve - Non-hazardous
Failure to obtain a certificate of electrical inspection from the bureau of electrical control for the installation of emergency power to exit lights. failure to obtain a certificate of electrical inspect
Sep 1, 1998 · Penalty $400
Resolve - Non-hazardous
Failure to obtain a certificate of electrical inspection from the bureau of electrical control for the installation of emergency power to exit lights. failure to obtain a certificate of electrical inspect
Jan 30, 1998
Resolve - Non-hazardous
Failure to file a report of compliance with local 16/84 certifying to the installation of required fire protection systems. remedy: file report.
Oct 7, 1997
Resolve - Non-hazardous
Work without a permit, work noted: interior demolition of partition on the entire 11th floor. remedy: obtain approval and permit from this department.
Sep 15, 1997
Resolve - Non-hazardous
Work without a permit. work noted: demolition of interior office space at 8th floor. all interior partitions removed closing entry door at east end of floor hallway with studing and sheetrock. remedy: obtain ap
Sep 15, 1997
Resolve - Non-hazardous
73# 73# file and obtain permit for illegally removed side walk elevator.
Aug 26, 1997
Resolve - Non-hazardous
Work without a permit work noted 1-demolition of insterior office space 8th floor all interior partitions removed 2-closing one entry door at east end of 8th floor hallway with metal stugs & sheet rock remedy
Apr 8, 1996 · Penalty $350
Resolve - Unknown
Failure to provide emergency power exit light on floors, i.e., flrs. 12,7, failure to provide emergency power to exit - directional signs on 7 floor. remedy-provide emergency power exit light and to exit - dire
Oct 17, 1995
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 - certificate to the inspection of rearired fire protection system. remedy: file report.
Oct 17, 1995
Resolve - Non-hazardous
74-fire and obtain permit for illegal removal of sidewalk elevator.
May 4, 1995 · Penalty $2,000
Resolve - Non-hazardous
Work without apermit work noted demolish of interior partition ceiling erecting masonry block wall to create lobby. remedy: obtain apermit
Jun 30, 1994
Resolve - Hazardous
Work without a permit work note. having removed portion fire rated corridore wall. creating openning into office use. at the 6th floor. remedy:obtain a permit.
Jan 7, 1993 · Penalty $350
Resolve - Non-hazardous
Failure to site a report of compliance with local law 16/84 certifying to the installation of required sire protection system. remedy: file report
May 18, 1992 · Penalty $345
Resolve - Non-hazardous
Sign at elevator landing missing at first floor. remedy: install sign
Feb 27, 1991
Resolve - Non-hazardous
Work without a permit noted interior demolition partitions location 11 fl entire remedy stop all work obtain a permit and approvals from this dept
Jul 13, 1989 · Penalty $250
Resolve - Non-hazardous
Work without a permit. remedy: stop all work. obtain a permit.
Oct 18, 1988 · Penalty $250
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems. remedy; file report.
Oct 26, 1987 · Penalty $150
Resolve
Complaints
- Water leak
Slow leak
Apr 14, 2025 · Apt 8B
Close - Unsanitary condition
Mold
Apr 14, 2025 · Apt 8B
Close - Plumbing
Water supply
Mar 15, 2022 · Apt 3RDFLO
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 20, 2026 | Non-market transfer | Office buildings | 13 |
Building details
- Building type
- Office building (O6)
- Year built
- 1910
- Floors
- 12
- Residential units
- —
- Building area
- 44,380 ft²
- Lot area
- 4,258 ft²
- Zoning
- C5-2
- Community board
- 105
- Council district
- 3
- Block / lot
- 832 / 41
- Assessed value
- $6,364,350
- Landmark / historic district
- No
Questions about 286 5 Avenue
Who owns 286 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Zhora State Equities LLC.
Does 286 5 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 286 5 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 286 5 Avenue built?
City records list 1910 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.