135 West 30 Street is a hotel built in 2012 in Manhattan, 10001. The owner of record is Courtyard New York Manhattan Chelsea 313 1y. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 42
- ECB violations
- 25
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 42
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2020
Dob violation - resolved
Show 32 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2017
Dob violation - resolved - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 18, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 6, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 14, 2013
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 8, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 10, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 26, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2005
Dob violation - resolved - Elevator elevatorrequired
1p20887
Oct 9, 2001
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p20887
May 1, 2000
Dob violation - resolved - Elevator elevatorrequired
1f3000
May 1, 2000
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - dismissed - Elevator elevatorrequired
1p20887
Jul 1, 1999
Dob violation - resolved - Elevator elevatorrequired
1f3000
Jul 1, 1999
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 1990
Dob violation - resolved - Elevator elevatorrequired
(51)remove copper wire from the fuses (52)provide outside communication system
Nov 28, 1988
Dob violation - resolved
ECB violations · 25
- Class - 2
Exterior wall repairs observed: active site upon inspection noted out rigger system contrary to cd5 .erector not use tension wire rope and outrigger system tied to steel frame structure contrary to drawings .,
Sep 17, 2025
Resolve - Class - 2
Exterior wall repairs . observed active site upon inspection was requested :pre instalation and post inspection letter but none was provided contrary to building code bc 3314.4.3.1 and bc 3314.4.3.2/ stop all
Sep 17, 2025
Resolve - Class - 2
Exterior wall repairs . observed active site upon inspection was requested fitness certifications to segundo rosendo juanita , y carlos chimbo .but none was provided .contrary to building code 1rcny 104-20
Sep 17, 2025
Resolve - Class - 2
Exterior wall repairs observed: active site upon inspection requested: sws drawings ,and periodic inspection letter ,and motor manufacturer specifications but none was provided contrary to building code . /stop
Sep 17, 2025 · Penalty $1,280
Resolve - Class - 2
Observed active site upon inspection requested designation letter for riger foreman no letter but carlos chimbo acting as foreman show no experience for suspended scaffold many unsafety conditions found on sit
Sep 17, 2025 · Penalty $625
Resolve - Class - 2
Exterior wall repairs . observed active site upon inspection saw sws has been erected on exposure 1 and noted light turned off or not connected contrary to building code 3307.1and bc3307.6.8
Sep 17, 2025 · Penalty $2,430
Resolve - Class - 2
Failure to submit acceptable required cycle 8a & 9a report of critical examination documenting conditioin of exterior wall & appurtenances required by 28-302.4 for control #918297.remedy:submit acceptable requi
Dec 2, 2022
Resolve - Class - 2
64b07 provide proper device # on dumbweighter id 10774 ot iv 22938
Sep 24, 2018 · Penalty $655
Resolve - Class - 2
Work w/o permit. noticed at time of inspection 3 interior elevators inuse rated for passenger only. workers using elevators for material moving from flr to flr. elevator permit #s 1p47208, 1p47209, 1p47207.
Nov 14, 2013
Resolve - Class - 1
Sec. bc 3303.1.2 failure to have elevator in readiness. noticed @ timeof inspection 3 inside working elevators no certification for use of elevators.remedy:stop all work above 75' provide elevator in readiness
Nov 12, 2013
Resolve
Show 15 more ↓
- Class - 2
Sec. 28-105.1 work w/o permit. expired permit. at time of inspection observed 2 interior elevator's being used on active jobsite. temp use certificates have expired 1 on 8/30/13 & 10/4/13 elevator #2 1p47209
Oct 8, 2013
Resolve - Class - 2
3309.10:no roof protection at time of inspection observed roof protection missing at 2nd flr set back of adjacent property over ac units where a piece of docker form work fell & damage (ac)unit during stripping
Sep 12, 2012
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. as per conversation with site safety manager & superintended 10" x 10" pc of docker form work fell from roof level during strippi
Sep 12, 2012 · Penalty $2,400
Resolve - Class - 3
Work does not conform to approved construction documents or amendmentsat exp 1) observed 14' height construction fence erected w/o an approved engineered drawing at site. remedy: conform to approved documents
Jul 23, 2012
Resolve - Class - 1
3310.8.3:failure to maintain daily inspection log for concrete work at site. upon inspection noted concrete safety manager provided logs 5-2-12 to 5-7-12. as per site safety manager logs concrete pour at site s
May 9, 2012 · Penalty $1,600
Resolve - Class - 2
Sec. 28-105.12.5. work w/o an after hour variance permit. work noted at 1:15 pm extending construction fence on to sidewalk (4) workers at site. no variance permit presented upon request. "stop all work"
Feb 25, 2012 · Penalty $800
Resolve - Class - 1
Failure to have site safety manager present as required at time of inspection. observed 4 workers at site working on extending const fence onto sidewalk & no site safety manager present or vaiance permitobtain
Feb 25, 2012
Resolve - Class - 1
3306.9.8-hazards to be removed(3)before demolition is started, the cellar and all flrs shall be throughly cleaned of combustible materials and debris.note:at the time of my inspection on demolition site.demolit
Jan 13, 2012 · Penalty $1,000
Resolve - Class - 2
97x10.97x10 found device inoperative restore device back to service
May 12, 2009
Resolve - Non-hazardous
12q03/ 37o02/ 52u16/ 52o02/ 3 6o02/ 62o02/ 12q03 install unguarded& lights ( guards ) 37o02 properly clean motor room 52u16 properly tag device with city id no 50o02 properly clean machine 36o02 properly cl
Mar 31, 2003
Resolve - Non-hazardous
11l11-02l11-12l11-19ml-26l11. 19 - covers. 26 - not closing properly (slamming).
Jan 31, 2003
Resolve - Non-hazardous
73 x 11 37 6 12 73-x-11 restore to service so that a complete inpection can be done, 37-g-12 operator fuses
Aug 28, 2002
Resolve - Non-hazardous
46h,37l,(37) repair controller
Jul 15, 1994
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifying to the installation of required fire protection systems. remedy: file report
Jan 19, 1994 · Penalty $400
Resolve - Non-hazardous
Failure to provide floor numbering sign within stair enclosure on every floor. remedy: install sign as per ll16/84
Jan 19, 1994 · Penalty $200
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2012
- Floors
- 22
- Residential units
- —
- Building area
- 121,000 ft²
- Lot area
- 9,974 ft²
- Zoning
- M1-9A/R12
- Community board
- 105
- Council district
- 3
- Block / lot
- 806 / 13
- Assessed value
- $25,257,150
- Landmark / historic district
- No
Questions about 135 West 30 Street
Who owns 135 West 30 Street?
The owner of record in NYC Department of City Planning PLUTO data is Courtyard New York Manhattan Chelsea 313 1y.
Does 135 West 30 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 135 West 30 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 135 West 30 Street built?
City records list 2012 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.