132 West 27 Street
Manhattan, NY 10001BBL 1-00802-0061Map
Owner of record: Innside Ventures, LLC
132 West 27 Street is a hotel built in 2014 in Manhattan, 10001. The owner of record is Innside Ventures, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 45
- ECB violations
- 36
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 45
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
Show 35 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 27, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed
ECB violations · 36
- Class - 2
3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code.note.sidewalk shed erected under job#140289765 along exp1 has inoperable bulb rendering affected area visibly dark &
Dec 29, 2015
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. a t time of inspection noticed debris,combustible materials and loose construction materials laying over the roof.materials not secured or pl
Oct 9, 2015
Resolve - Class - 2
Work does not conform to approved construction documents or amendments-site safety plans.note at time of inspection active job site exteriorwork in progress use of suspended scaffold at exp1,2,3.suspended scaff
Sep 16, 2015 · Penalty $250
Resolve - Class - 2
Bc3301.2 failure to safeguard all persons and property affected by construction operations. at the time of my inspection, construction work in progress. i observed workers installing styrofoam on top of the roo
Jul 6, 2015
Resolve - Class - 2
97m07 general contractor artimus construction inc l#003684gc. failed to produce a competent person operators list remedy: provide compliant operators list for hoist code 3318 personal hoist section 3318.5.
Jul 6, 2015
Resolve - Class - 1
Sec. 3301.2 design required by chapter 33. at time of inspection observed active jobsite 21 sty out of ground. at 12 fl in staircase observed scaffold set up on staircase used to place block & mortar by workers
Mar 17, 2015 · Penalty $1,600
Resolve - Class - 1
Sec. 3307.5.2 flag person: not provided. at time of inspection observed active jobsite 21st fl pouring operations in progress via crane w/concrete bucket. site safety plan states flagmen be posted at the street
Mar 17, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain: housekeeping at time of inspection observed active jobsite at the 21 fl,pouring operations. observed large amount of debris at the 18th fl various construction debris including combustible
Mar 17, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain: no guardrails. at time of inspection observed active jobsite 21 sty out of the ground. at the 19th fl observed multipleopen areas at the perimeter w/o guardrails cables or caution tape.
Mar 17, 2015 · Penalty $1,200
Resolve - Class - 1
Sec. 3301.1.2 failure to comply w/nyc fire code general: no log book during healing operations. at time of inspection observed active jobsite pouring 21st fl. healing operations on going via open flame healing
Mar 17, 2015 · Penalty $1,600
Resolve
Show 26 more ↓
- Class - 2
Work does not conform to approved construciton documents &/or approvedamendments. noted: at time of inspection no detail for attachment of plywood to sidewalk shed could be found/provided. on exp#1 on inside
Mar 4, 2015
Resolve - Class - 1
Bc3301.2 27-1009(a) holes/opening not covered - at time of inspection at the above address i observed an active nb in progress.upon inspection i observed numerous holes and opening not covered ranging from 6"di
Feb 25, 2015 · Penalty $400
Resolve - Class - 1
Bc3303.8 standpipe not painted red. at time inspection at the above address i observed an active nb in progress.upon inspection i observedboth standpipes on on the east and one on the west sides of the buildi
Feb 25, 2015 · Penalty $150
Resolve - Class - 1
Bc1906.6 reshores in proximity to facade within loft not secured-upon inspection at the above address i observed an active nb in progress. there are reshores not secured within 10' from the facade from the 9th
Feb 25, 2015 · Penalty $250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. at time of inspection at the above address i observed an active nb in progress.delivery of concrete block was being off load
Feb 25, 2015 · Penalty $250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements-at time of inspection at the above address i observed an active nb in progress.i also observed large patches of ice on working floors from the
Feb 25, 2015 · Penalty $400
Resolve - Class - 1
Sec. 3308.1.1 failure to provide verticle netting as per code requirements. observed nb construciton in progress built upto 11 sty-missing verticle safety netting/not maintained at 9th & 10th fl at exp#1. "stop
Feb 10, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures-no toeboard.observed-nb under const missing any kind of protection toeboard @10 fl exp#1 to prevent falling material from the fl.stop all const work @lea
Feb 10, 2015 · Penalty $1,000
Resolve - Class - 1
Sec. 28-103.8 failure to provide inspection log for concrete anchor strap. observed nb upto 11 sty concrete safety strap/d rings installed at every floor. no strap inspection log been provided no presented upon
Feb 10, 2015 · Penalty $400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. observed nb construciton in progress. built upto 11 sty having debris waste concrete bottles all over floors. another debris box placed at the
Feb 10, 2015 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation. noted: bldg built upto 11 sty approx 12'long 4"x4" wood stucthanging over the edge of the bldg at exp1 on 27th street side. constit
Feb 10, 2015 · Penalty $2,400
Resolve - Class - 1
Sec. 3303.7.3 failure to post"no smoking" signs as required. observed nb built upto 11 sty missing no smoking sign at all floors above 6th fl. remedy: post no smoking sign as required.
Feb 10, 2015
Resolve - Class - 1
Sec. 3301.2 failure to safeguard all person & property affected by construciton operations. observed nb under construction - missing holes openning covers in different levels throughout the bldg which can make
Feb 10, 2015 · Penalty $800
Resolve - Class - 2
Failure to safeguard all persons & property affected by const ops @time of insp hmo#7821(b) was operative a crane cd#4340 cn#660/14 lifting a bundle of steel over the sidewalk w/out any flag persons as per appr
Feb 9, 2015 · Penalty $1,200
Resolve - Class - 1
3303.4.5.1,materials @ edge of the bldg when not being used w/ 10ft of bldg edge.@ time of insp i observed active concrete jobsite,pouring 2nd fl men working on deck & first fl below.@ exposure 3 of site i obse
Dec 31, 2014 · Penalty $1,600
Resolve - Class - 2
3301.2,adequate means of egress:not provided.@ time of insp i observed active concrete jobsite 2nd fl approx 30 men working on deck as concrete bucket pours concrete.the egress ladders @ exp 3 from 2nd to 1st f
Dec 31, 2014 · Penalty $400
Resolve - Class - 1
Unsafe storage of materials during const.@ time of insp i obseved an active concrete jobsite.concrete being poured on 2nd sty deck.men working on deck & on first fl below.elevator shaft patforms towards the cen
Dec 31, 2014 · Penalty $2,400
Resolve - Class - 2
Work does not confrom to approved const documents &/or apporved amendments.@ time of insp i observed an active concrete const jobsite.@ exp#1 along 27 st i observed a large amount of cmu block outside authorize
Dec 31, 2014 · Penalty $250
Resolve - Class - 1
Failure to maintain:housekeeping.@ time of insp i observed active concrete job site 2nd sty being formed.men working on 1st fl level,formingscaffold work.the first fl level had large amount of debris scattered
Dec 31, 2014 · Penalty $2,400
Resolve - Class - 2
3303.15,concrete wash out water:container no design drawing.@ time of insp i observed active concrete jobsite.concrete operations on going & pouring 2nd fl.cement trucks loading concrete bukets multiple trucks
Dec 31, 2014 · Penalty $400
Resolve - Class - 2
Observed recent smoking refuse within construction/demo site in viola tion of nyc fire code. at cellar level of the construction site evidence of smoking has been seen in many locations during inspection.curren
Dec 9, 2014
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. during stripping operations reshores are being side loadedalso throughout the site no rebar covers exist.rmdy: stop all work pro
Dec 9, 2014 · Penalty $1,200
Resolve - Class - 1
3301.2 failure to provide 3'6"guardrail or equivalent around all floorand perimeter openings. at 1st flr level guardrails are missing which leads to a 14'drop.also toeboards are missing throughout.rmdy:provide
Dec 9, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to provide concrete safety manager.as noted:@ time of insp.on an active construction site,observed @ cellar level workers form work in foundation walls.the rebar in foundation walls exposure 4.concrete
Oct 28, 2014 · Penalty $1,200
Resolve - Class - 1
Pursuant to section 28-207.2 of the admin code of the nyc you are hereby ordered to immediately stop all work @ the above premises because of work none-conforming to aaproved cons dovs & or approved ammends.ong
Jul 10, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to have site manager present @ the jobsite as required @ the time of insp the site safety manager who is assigned to the job was not present @ the jobsite there was an alteration site safety manager who
Jul 1, 2014 · Penalty $1,200
Resolve
Complaints
- Unsanitary condition
Pests
Dec 3, 2024 · Apt 1017
Close - Heat/hot water
Entire building
Jan 16, 2024 · Apt 5W
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| May 27, 2026 | $203,000,000 | Luxury hotels | 313 |
Building details
- Building type
- Hotel (H2)
- Year built
- 2014
- Floors
- 21
- Residential units
- —
- Building area
- 147,220 ft²
- Lot area
- 11,850 ft²
- Zoning
- M1-8A/R11
- Community board
- 105
- Council district
- 3
- Block / lot
- 802 / 61
- Assessed value
- $17,600,850
- Landmark / historic district
- No
Questions about 132 West 27 Street
Who owns 132 West 27 Street?
The owner of record in NYC Department of City Planning PLUTO data is Innside Ventures, LLC.
Does 132 West 27 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 132 West 27 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 132 West 27 Street built?
City records list 2014 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.