275 7 Avenue
Manhattan, NY 10001BBL 1-00801-0001Map
Owner of record: 275 Seventh Avenue Building LLC
275 7 Avenue is an office building built in 1928 in Manhattan, 10001. The owner of record is 275 Seventh Avenue Building LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 165
- ECB violations
- 55
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 165
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 22, 2020
Dob violation - active - Elevator elevatorrequired
Cease use
May 22, 2020
Dob violation - active - Elevator elevatorrequired
Cease use
May 22, 2020
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
Cease use
May 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Sprinkler none
Failed to file final sprinkler report by july 1, 2019
Sep 3, 2019
Dob violation - active - Facade safety program facade required
Fisp-facade safety program facade required
Aug 16, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed
ECB violations · 55
- Class - 2
At the time of inspection, i observed inadequate roof protection at exposure #2. the required flame-retardant foam and flame-retardant wood plank were not installed beneath the plywood resulting in insufficient
Jul 31, 2026 · Penalty $2,500
Active - Class - 1
Note: at time of inspection, i observed multiple parapet clamps installed along the parapet, upon request for the registered design professional inspection/evaluation documentation to confirm that the parapet c
Jul 31, 2026 · Penalty $5,000
Active - Class - 1
Note: at time of inspection on a active site, i observed suspended scaffold in place upon request for the required installation inspection report as per 3314.4.3.2.1. to verify safety and compliance none was pr
Jul 31, 2026 · Penalty $5,000
Active - Class - 2
Atoi construction work was in progress and the required dob work permit was not posted in a conspicuous location on the site as required forthe public, post/properly post permit
Jul 8, 2026
Resolve - Class - 1
Atoi construction work was observed in progress without the required daily pre-shift safety documentation available on site, maintain records of pre-shift safety meeting
Jul 8, 2026 · Penalty $5,000
Active - Class - 2
Failure to maintain building walls and appurtenances. at time of inspection, observed terra-cotta cracked at the corner of expos. 1 and 4, west and south elevation btw. 4th and 5th floors. bricks mortar joints
Dec 19, 2023 · Penalty $1,250
Active - Class - 2
Work does not conform to approved construction documents and or approved amendments.noted:at the time of my inspection of a 27 story facade restoration jobsite i observed suspended scaffold installed used upon
Oct 20, 2021
Resolve - Class - 2
Failure to comply with manufacturers specifications.noted:at the time of my inspection of active 27 story facade restoration jobsite upon reviewing dralling from c-hooks it smogs map 1000lp load while 1500lb lo
Oct 20, 2021
Resolve - Class - 1
Failure to install suspended scaffold as per plans/work contrary to cd5.at time of inspection of an active jobsite for facade work under alteration permit#123069776,it was observed that suspended scaffolds at e
Aug 3, 2021 · Penalty $625
Resolve - Class - 1
Bc 3301.1.1 responsibility for safety at time of inspection on active jobsite for facade work under alteration permit#123069776,it was observed installed suspended scaffold at multiple exposures and levels acti
Aug 3, 2021 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 1
Work does not conform to approved plans/drawings at time of inspectionon active jobsite for facade work under alteration permit#123069776,itwas observed a needle beam access platform with supported pipe scaffol
Aug 3, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3301.7 documents to be kept on site(parapet stability report by engineer). at time of inspection of this 27 story major building i observed suspended scaffolds at expos 1,3 and 4 at various levels(26 fl,18 f
Apr 8, 2021 · Penalty $1,250
Resolve - Class - 2
Sec. a.c 27-929.1,failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional in an office bldg 100 feet or more in
Mar 30, 2021
Resolve - Class - 2
Failure to provide approved construction documents at jobsite at the time of inspection.at the time of inspection on an active jobsite doingfacade repair,i observed a material hoist erected on a 6ft pipe scaffo
Mar 25, 2021
Resolve - Class - 2
28-110.1 inadequate site safety plan.at the time of inspection on an active jobsite for facade repair.i observed a suspended scaffold under construction at 26th floor level setback at exposure 4 with no fall pr
Mar 25, 2021
Resolve - Class - 1
Inadequate safety measures operation of crane /derrick hoisting equipmenyt in unsafe manner at the time of my inspection of a 27 storyt building i observed suspended scaffols using c hooks installed at exposure
Dec 19, 2019
Resolve - Class - 1
Failure to mainatin/display on site documents required by chapter 33-c hook drawinsg at the timw of my inspection of a 27 stroy building i observed suspended scaffold susing c hooks installed at exposure 2, 25
Dec 19, 2019
Resolve - Class - 2
A.c.27-929.1 failure to complete the installation of a full ystsem of automatic sprinklers and file a final sprinkler report prepared by registration design professional by july 2019,in an office building 100 f
Nov 15, 2019 · Penalty $1,250
Active - Class - 3
Work does not conform to approved construction documents and/or approved amendments for job #12049327. noted: 12th fl layout (room count/locations, door locations) not as per plan. rem: conform to approved cons
Jul 18, 2018 · Penalty $500
Active - Class - 1
Failure to designate &/or have site safety manager present as required.note: through investigation of dept records,the dept determined site failed to designate a site safety manager as required. stop all work
Apr 18, 2018
Resolve - Class - 1
Sec. 3310.1 failure to obtain an approved site safety plans. note: through investigation of the dept electronic filing system the dept determined site failed to obtain an approved site safety plan from best squ
Apr 18, 2018
Resolve - Class - 1
Sec. 28-207.2.8 tampered w/removed or defaced a written stop work order. note: at time of inspection stop work order sticker was removed after posting. do not remove sticker. remedy: comply w/code.
Apr 18, 2018 · Penalty $2,500
Active - Class - 1
Failure to (take) & provide safety measures sidewalk shed netting etc to protect & secure public safety for documented unsafe facae as per 1rcny 103-04.facade tecnical report by pe/ra (fisp 3 notif. filed facad
Sep 22, 2017 · Penalty $2,400
Active - Class - 1
Failure to safeguard all persons & property affected by const operations.noted:a small rock fell from site cracking a parked car windshield that was 7th ave in front of 275 7ave.found a rock on top of sws parap
Apr 15, 2015 · Penalty $1,200
Resolve - Class - 2
Sidewalk shed sign shall be posted @least 3' & no more than 6'left edge of the sidewalk shed noted:@time of insp sidewalk shed sign is posted on the right hand side of shed.rem:comply w/code.
Feb 3, 2015 · Penalty $4,000
Resolve - Class - 2
Sidewalk shed does not meet color specification.noted:@time of insp sidewalk shed on exp#1 & exp#2 & exp#4 is red in color.rem:comply w/code.
Feb 3, 2015
Resolve - Class - 2
Work doesnot conform to approved construction documents and/or approved amendments: note:sidewalk shed has been erected at exp#1 (7th avenue),exp#2 (w 26th st) and exp#4 (w 25th st) under permit #121936799-01-e
Dec 10, 2014
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on prem.work does not conform to approved plans.noted:@ time of insp steel plates for lifelines & tiebacks are 6"x10"in size which is contrar
Aug 12, 2014
Resolve - Class - 1
3314.6.3 life lines and suspension ropes life line tiebacks and suspension ropes shall each be attached to a different point of anchorage noted at time of insp suspension wire rope and life line were connected
Jul 26, 2011 · Penalty $1,600
Resolve - Class - 1
Failure to have site safety manager or coordinator present as required noted:approx 4 installed supported scaffold on top of sidewalk shed scaffold from 2 flr to 26 flr w/ man stairs.no manager @ site.partial s
Jan 26, 2011 · Penalty $1,200
Resolve - Class - 2
Sidewalk shed does not meet code specifications in lighting has been installed underneath sidewalk shed but is not illuminated at time of inspection. remedy: conform shed to code specifications.
Nov 4, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements noted pallets of bricks roofing materials on sidewalk shed rem: maintain adequate housekeeping
Mar 20, 2009
Resolve - Class - 2
Work does not conform to approved construction documents and or amendments noted outrigger beam not set up according to cd5 cd5 shows beam 12' from front to counterweights while its sit up only approx 6' from f
Mar 20, 2009
Resolve - Class - 2
Fail notify dept/obtain permit prior to use/inst of outrigger beams remedy: call prior to inspection/comply with code
Sep 3, 2008 · Penalty $800
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted: the design drawings show all outrigger beams forsuspended scaffold. on exposure #1 there is one out rigger beam and 1
Jul 30, 2008 · Penalty $500
Active - Class - 1
Sec.bc3314.15.2 27-1046 the hanger or stirrups shall be placed at least 6 inches but not more than 18 inches from the of the platform unless manufacturer specifies other wise noted the stirrups on 2 platforms.
Jul 30, 2008 · Penalty $1,600
Resolve - Class - 1
Sec.bc3301.2 27-1009 failure to safeguard all persons and property affected by construction operations. noted there is work being performed on exposure #3 on suspended scaffold. there is a roof of adjacent prop
Jul 30, 2008 · Penalty $2,400
Resolve - Class - 2
Sec bc3307.2.1 all temporary walk ways shall be illuminated at all time either by natural or artificial light the level of illumination shall be equivalent of that produced by 200 watt 3400 lumen minimum standa
Jul 30, 2008 · Penalty $400
Resolve - Non-hazardous
Sec32a,34a,50,50a,50b,50c,50d. 50-boiler safety valve btu's less than min. boiler safety valves cap. peo,boiler ratting tag. 50a-holes in boiler ceilin, and walls. 50b-oil tank sign missing. 50c-castion fitting
Apr 28, 2008
Resolve - Hazardous
27-1054 operation of defective hoisting equipment- 1) rear fulcrum is bended. 2) missing junior beam on rear fulcrum 3) rear fulcrum is out of plumb 4) insufficient counterweight 5) missing hard sill under the
Jan 16, 2008 · Penalty $3,000
Resolve - Non-hazardous
Failed to notify the dob prior to the use or installation of c hooks or outrigger beams in connection with suspended scaffolds
Jan 15, 2008 · Penalty $500
Resolve - Non-hazardous
Work w/o permit. work noted: new partition walls on mezzanine and stairway to mezzanine erected to create to rooms. remedy: obtain permit orrestore premises to prior legal condition.
May 15, 2007 · Penalty $500
Resolve - Non-hazardous
Altered bldg occupied w/o a valid c of o alt #104200810 expired 05/02/07 illegal occupancy noted at mezzanine level as office space for approx 10 people in two rooms. remedy: obtain valid c of o or discontinue
May 15, 2007 · Penalty $180
Resolve - Non-hazardous
Having signage with a total surface area greater than 6 times the street frontage of the zoning lot (or more than 1200 sq feet) flex sign atlocation approx 2145 sq feet remedy:remove illegal signage
Aug 30, 2004 · Penalty $400
Resolve - Non-hazardous
Having installed a sign without first obtaining a permit flex sign approx 2145 sq feet installed at north/west corner of buidling from 2nd to 3rd flr remedy:remove illegal work
Aug 30, 2004 · Penalty $400
Resolve - Non-hazardous
02b01/ 15m07/ 80m07/ 02b01 alarm not audible enough adjust alarm 80m07 provide notice as to locate certificate and business hours per section 27-1004-b
Dec 27, 2002
Resolve - Non-hazardous
Work without a permit. in that partition have been removed and new partitions have been erected at 18th floor throughout.(95% completed) stop all work. remedy: file necessary plans and applications, obtain appr
May 6, 1997
Resolve - Non-hazardous
Failure to provide adeavate emergency power exit light on bath stairs (a and b) an in corridors , on floors 21,18,17,16 and basement. inadeavate exit/ directional exit signs on emergency power: floor 16 inadeav
Jan 4, 1996 · Penalty $525
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 - certifying to the installation of reavired fire protection systems. remedy: file report.
Jan 4, 1996
Resolve - Non-hazardous
74b. 74 provide proper access to 2ndary (secondary) and gov. room.
Aug 8, 1995 · Penalty $1,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O4)
- Year built
- 1928
- Floors
- 27
- Residential units
- —
- Building area
- 548,680 ft²
- Lot area
- 22,732 ft²
- Zoning
- M1-8A/R11
- Community board
- 104
- Council district
- 3
- Block / lot
- 801 / 1
- Assessed value
- $74,888,550
- Landmark / historic district
- INDIVIDUAL LANDMARK
Questions about 275 7 Avenue
Who owns 275 7 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 275 Seventh Avenue Building LLC.
Does 275 7 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 275 7 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 275 7 Avenue built?
City records list 1928 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.