112 West 25 Street
Manhattan, NY 10001BBL 1-00800-0049Map
Owner of record: Chelsea 25 Hotel LLC
112 West 25 Street is a hotel built in 2016 in Manhattan, 10001. The owner of record is Chelsea 25 Hotel LLC. HPD has recorded 5 housing violations here, most recently on November 17, 2025.
- HPD violations
- 5
- DOB violations
- 40
- ECB violations
- 77
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 40
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 30, 2018
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jun 30, 2018
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 19, 2017
Vp*-violation unserved ecb- dismissed
Show 30 more ↓
- Construction other optional
C-construction other optional
Dec 19, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Dec 19, 2017
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 23, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Construction other optional
Boro-comm
Jun 22, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 11, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 11, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Apr 11, 2017
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 13, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 3, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2003
Dob violation - resolved - Elevator elevatorrequired
1h135
Oct 7, 2002
Dob violation - resolved - Construction other optional
C-construction other optional
Sep 28, 2001
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
1h135
May 5, 2000
Dob violation - resolved - Elevator elevatorrequired
1h135
Jun 29, 1999
Dob violation - resolved - Electric signs none
Es-electric signs none
Jan 24, 1991
Dob violation - dismissed
ECB violations · 77
- Class - 2
Failure to maintain bldg in code compliant manner exhaust discharge must be no closer than 10 ft fm bldg opening per rs 13 (2-2.1.4) mc 401.5.2 as per mc 501.2 & rs 13-1 sec 2-2.1.4 bldg 110 w 25th st apt 5 obs
Jan 25, 2021
Resolve - Class - 1
3314.4.6=use of a supproted scaffold without scaffold user certificate noted at time of my inspection of a ne 39 strie building construction in progress i observed a worker (wo jen weng) on a baker scaffold app
Oct 9, 2019 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction docuemnts and/or amendments noted at time of my inspection of a new 39 storie building construction in progress i observed a large section of the street has constr
Oct 9, 2019
Resolve - Class - 1
Bc3301.2-inadequate fall protection.at time of inspection on a 39 story new building observed inadequate guardrail system on scaffold in use@ roof level made out of aluminum joists.at 4th floor level exposure#1
Aug 26, 2019
Resolve - Class - 1
Bc3303.10-inaddequate roof protection-exposure#4.in response to above mentioned complaint#1519691 for failure to maintain existing roof protection observed aluminum coping stone for the adj property unprotected
Aug 26, 2019 · Penalty $625
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. noted: at time of inspection observed suspended scaffold cables not secured causing cables to bang off exposure#4 sidewall.
Feb 24, 2019 · Penalty $10,000
Resolve - Class - 1
No guardrail. at time of inspection of new building under constructionbuilding at roof top i observed missing guardrails at leading edge at the setback on 2 floor at exp3 on enclosed perimeter greater than 6' o
Aug 15, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 37 sty bldg at roof levelconstruction work in progress responding to complaint#1482971
Jun 30, 2018 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents & or approvedamendments. note: at the time of my inspection of a 37 sty bldg at roof level construction work in progress. i observed that there were on
Jun 30, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 3301.2 control access zone @time of insp of new 37 story bldg active jobsite.bldg topped off & windows installed.i observed open area around piping w/large opening in deck w/no protection & no control access
Mar 31, 2018 · Penalty $2,530
Resolve
Show 40 more ↓
- Class - 1
Bc 3301.2 holes not covered @time of insp of new 37 story bldg active jobsite bldg topped off w/windows installed.i observed numerous holes more that 2" wide or numerous fls @ different locns not covered.this c
Mar 31, 2018 · Penalty $2,530
Resolve - Class - 2
Wokr w/o a permit. note: at the time of inspection of a 37 sty bldg at 36 fl level construction work in progress. i observed mini crane on 35th fl level for use of rebar hoisting from lower loading platform.
Dec 19, 2017
Resolve - Class - 1
Failure to maintain adequate housekeeping per section. note: at the time of my inspection of a 37 sty bldg at 36th fl level,construction wokr in progress. i observed working platform at exterior of bldg was not
Dec 19, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to institute & maintain safety equipment measures & temporary construction. note: at the time of my inspection of a 37 sty bldg at 36 fl level,construction work in progress. i observed perimeter work in
Dec 19, 2017 · Penalty $5,000
Resolve - Class - 1
Work does not conform to approved construction documents and or approved amendments.note: at the time of my inspection of a 37 story building at 36th floor level construction work in progress. i observed existi
Dec 19, 2017 · Penalty $1,000
Resolve - Class - 1
3308.6 failure to maintain horizontal netting upon inspection of building,observed the horizontal netting was not erected as per approved drawings also obseved that floors 3,4,5,6,7 were not stripped,horizontal
Jun 6, 2017 · Penalty $1,600
Resolve - Class - 1
3301.1.1 responsibility of safety.observed during inspectiion of proposed 37 story bldg currently at 8 stories workers approx. 12ft off the floor standing on a plank with no fall protection in place(ppe)during
May 31, 2017 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents as noted:as noted at time of inspection on an active construction site observed on floor 8 exp#3 shear wall apprx 3 ties snapped causing 3-4 yards of con
May 31, 2017 · Penalty $250
Resolve - Class - 1
Failure to safeguard public and property in response to an incident where it was reported that the concrete from work had failed and that the concrete was spilling out of the (form)work onto the cleaning scaffo
May 31, 2017 · Penalty $10,000
Resolve - Class - 1
Operating an ariticulating boom crane outside of the exception of bc3319.3(10)in that crane was not being used exclusively for loading and unloading trucks on trailers.hmo roberto caldas made a pick/hoisted a
May 11, 2017 · Penalty $2,400
Resolve - Class - 1
Operating a boom crane outside of the exceptions of bc3319.3(b)in thatcrane was not being used exclusively for loading and unloading trucks or trailers.hmo roberto caldas hoisting material that was taken from
May 11, 2017 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measures.operation of crane in an unsafe manner.hmo roberto n caldas operating an articulating boom crane without a load chart for the position/configuration he was in the outriggers on stree
May 11, 2017 · Penalty $1,600
Resolve - Class - 1
Operating articulating boom crane outside of the exception of bc3319.3(10)in that the crane was not being used exclusively for loading and unloading trucks or trailers.hmo roberto caldas hoisted a load of wire
May 11, 2017 · Penalty $1,000
Resolve - Class - 1
Inadequate safety measures.operation of crane in an unsafe manner.hmo roberto n caldas operating an articulating boom crane outrigger over sidewalk without a approved plane.crane outriggers under front of tena
May 11, 2017 · Penalty $12,500
Resolve - Class - 1
Inadequate safety measures.operating an articulating boom crane outri gger in an unsafe manner,hmo roberto w cardas was operating crane wit hout a loadchart for the position/configuration crane was in.cranes
May 11, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to maintain: guardrail. at the time of inspection of active 7 sty bldg at 3rd fl concrete deck formwork observed missing/inadequate guardrail system to protect workers from falling below. partially stop
Apr 11, 2017 · Penalty $2,430
Resolve - Class - 2
Failure to maintain housekeeping. note: bldg erected to 3rd fl-erecting deck is covered in debris,saw dust,rebar,2x4's scraps of plywood. work deck is highly active & debris should be maintained throughout all
Apr 11, 2017 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations: no overhead protection. note: at time of inspection of 37 sty bldg erected to the 3rd fl observed form work/rebar work in progres
Apr 11, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to safeguard inadequate egress. at the time of inspection of an active 37 sty bldg at 3rd fl observed inadequate egress provided by a steel ladder extending 18ft to the concrete deck formwork. the egres
Apr 11, 2017 · Penalty $10,000
Resolve - Class - 1
Sec. 3301.1.1 responsibility for safety:(no caz)controlled access zone. note: at time of inspection of 37 sty bldg erected to the 3rd fl. atexp#3 at rear of site observed concrete safety manager mr. lala liftin
Apr 11, 2017 · Penalty $1,600
Resolve - Class - 1
Sec. 3309.10 roof protection. no roof protection provided for adjacent propertys at exp#4 & inadequate roof protection for adjacent property at exp#2 at bldg rear. stop consturction work above 2nd sty & 20feet
Feb 15, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements:as noted: at time of inspection at a active construction site observed excessive construction material and debris consisting of rebar/forms/dis
Jun 22, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to notify the department of an accident at the jobsite.the adjoining building at exposure 4 was damaged as a result of movement which was experienced during underpinning operation.the respondent did not
Mar 21, 2016
Resolve - Class - 2
Bc3309.4-failure to preserve and protect adjoining structure affected by excavation operation. there were signs of movement in the adjoiningbuilding at exposure 4 (120 w 25th st) this was evident in the numerou
Mar 21, 2016
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at various locations throughout 3 story parking garage,concrete/spray cement encausing steel memebers is coming off. also some small sections of concret
Jan 16, 2014 · Penalty $530
Resolve - Class - 2
Work w/o permit. installed car lifts 6 at upper level. remedy: obtain permit or remove.
Nov 15, 2013
Resolve - Class - 2
Failure to provide approved plans at job site at time of inspection. no plans available for alt ii. job #120622718. remedy: provide plans. contact queens sep 718.286.0683.
May 10, 2012
Resolve - Class - 2
Exit door not self closing. noted:at garage the exit doors are racked & drag & jam on floor on 2nd & 3rd floors to emergency stairwell. rem:repair &/or replace maintain exit doors self closing.
Jan 27, 2012
Resolve - Class - 2
Work w/o a permit noted:full height partition walls has been erected creating 3 rms 1st rm 6' x 8' 2dn rm 4' x 5' and 3rd rm 5' x 5' located on the 1st fl level remedy:obtain permit or restore premises to prior
Sep 24, 2009
Resolve - Class - 2
Failure to maintain bldg in code compliant manner note:the brick wall is cracked located on the esat side on the 2nd fl level remedy:repair/replace brick wall
Sep 24, 2009
Resolve - Class - 2
Failure to maintain bldg in code compliant manner noted:the concreate around the beam is cracked located at the ceiling 1st fl level remedy:repair/replace concrete
Sep 24, 2009
Resolve - Class - 1
Property owner functioning as outdoor advertising company failure to obtain valid oac registration number while engaging in outdoor advertising business. ( hemeker ) & ( nesquick, etc) remedy: remove illegal si
Apr 16, 2009 · Penalty $10,000
Resolve - Class - 1
Outdoor advertising company leasing or otherwise making illegal sign space available to others for advertising purpose. ( nesquick, etc. ) remedy: remove illegal sign
Apr 16, 2009
Resolve - Class - 1
Outdoor advertising company sign on display w/o a permit. ( nesquick. etc. ) remedy: remove illegal sign
Apr 16, 2009 · Penalty $10,000
Resolve - Class - 1
Outdoor advertising company sign on display w/o a permit ( hemeken) ( partial stop work ) remedy: remove illegal sign
Apr 16, 2009 · Penalty $10,000
Resolve - Class - 1
Outdoor advertising company leasing or otherwise making illegal sign space available to others for advertising purpose. ( hemeker ) remedy: remove illegal sign
Apr 16, 2009
Resolve - Class - 1
Property owner frustrating as outdoor advertising co failure to obtainvalid oac registration #.(adventureland & nesquick etc) remedy: removesign/register.
Apr 1, 2009 · Penalty $10,000
Resolve - Class - 1
Oac leasing or otherwise making illegal sign space available for advertising purposes. remedy: remove sign.
Apr 1, 2009
Resolve - Class - 1
Oac leasing or otherwise making illegal sign speed available for advertising purposes. (adventureland) remedy: remove sign.
Apr 1, 2009
Resolve - Class - 1
Oac sign on display w.o a permit.(nesquik etc) remedy: remove sign.
Apr 1, 2009 · Penalty $10,000
Resolve
Complaints
- Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H2)
- Year built
- 2016
- Floors
- 40
- Residential units
- —
- Building area
- 185,831 ft²
- Lot area
- 8,527 ft²
- Zoning
- M1-8A/R11
- Community board
- 104
- Council district
- 3
- Block / lot
- 800 / 49
- Assessed value
- $34,042,500
- Landmark / historic district
- No
HPD registration #145071, last renewed Dec 15, 2025.
Questions about 112 West 25 Street
Who owns 112 West 25 Street?
The owner of record in NYC Department of City Planning PLUTO data is Chelsea 25 Hotel LLC.
Does 112 West 25 Street have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 112 West 25 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 112 West 25 Street built?
City records list 2016 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.