111 West 19 Street
Manhattan, NY 10011BBL 1-00795-0028Map
Owner of record: 19th Street Owner LLC
111 West 19 Street is an office building built in 1901 in Manhattan, 10011. The owner of record is 19th Street Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 130
- ECB violations
- 37
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 130
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 12, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 26, 2019
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 27, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 27, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2010
Dob violation - resolved
ECB violations · 37
- Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 826381 in accordance with the rules of the department. 1rcny & 103-01(d)(1) requires that an annual inspection report for low-pr
Jun 7, 2024 · Penalty $625
Resolve - Class - 2
Failure to submit acceptable 8th found report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control #801773. rmdy: submit required technical report.
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg. roof-wood bridging defective. 2-railings-install railings as per code where missing-camelbacks cracked broken.active boiler chimney rotted out. north (cornice rotted out and
Mar 27, 2018 · Penalty $1,250
Resolve - Class - 2
Failuer to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Apr 21, 2014 · Penalty $800
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Nov 28, 2008 · Penalty $400
Resolve - Non-hazardous
Failure to post permit for work in progress job# 104691497. remedy: post permit.
Mar 4, 2008
Resolve - Non-hazardous
38o02,28q03.38-clean car top,restore(worr)light.28-install guard on operator
Aug 1, 2007
Resolve - Non-hazardous
86m05,66o02.86-no 2 yr test tag-pedeoral & file test w/ dob.66-clean pit
May 24, 2007 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior bldg. south elevation shows vertical cracks deteriorating and spalling in bulkhead facade; loose concrete in parapet over hang. north elevation shows deteriorating cornice damage
May 16, 2007 · Penalty $800
Resolve - Non-hazardous
15m07 - provide certificate frame as per code.
Jan 29, 2003 · Penalty $2,500
Resolve
Show 27 more ↓
- Non-hazardous
70b05/70r05. 70b provide ladder to motor room. 70r make an appoitment no to finelize elevator.
Dec 2, 2002 · Penalty $180
Resolve - Non-hazardous
16, 24a 49. 49) protective covers missing pressure mols, safety valve rating tag painted over, oil heater site glass painted over protective cover missing on low water control. boiler sealed as a precaution unt
Apr 25, 2002 · Penalty $180
Resolve - Non-hazardous
16, 24b, 30a, 49. 49)protective cover missing on 2nd low water control, safety valves rating tag painted over boiler sealed as a precaution until reinspection by dob to ensure public safety.
Apr 25, 2002 · Penalty $180
Resolve - Hazardous
Failure to maintain exterior building wall.noted:at 7th floor of north and south elevations linestone spalled due to rusting metal anchors.remedy:provide proper protection and permits and structural stability r
Jul 30, 2001 · Penalty $180
Resolve - Hazardous
Failure to maintain ext.bldg.wall.noted:cracks in parapet at s facade.a/c unit at windows installed improperly w/wood blocks for support under them.rem:maintain ext.bldg.wall.provide protection,make safe immedi
Jun 4, 2001 · Penalty $800
Resolve - Non-hazardous
74r09-remove illegal shoftway doors in the overhead.
Dec 7, 2000 · Penalty $350
Resolve - Non-hazardous
Work without a permit.work noted:renovation in progress by erected new concrete block wall metal framing partitions.new entrance door,new aluminum framing with now entrance door.dry wall and ceiling & electrica
Sep 25, 2000
Resolve - Non-hazardous
01m,75r,03b,03, 01-provide stop switch car as req. 75- five year test 03-provide req freight only sign in car 03d-remove items stored in car.
Apr 7, 1998
Resolve - Hazardous
06n,35o,53x,57o, 06-cease use until bypassed contact is repaired 53-install proper lighting in machine room non at present 57-clean pit.
Sep 19, 1997 · Penalty $500
Resolve - Non-hazardous
52e,60d,46o, 52-adjust brake 50-repair buffer 46-clean hoist ropes for inspection
Sep 19, 1997 · Penalty $200
Resolve - Non-hazardous
39h,47k,
Sep 19, 1997 · Penalty $200
Resolve - Non-hazardous
50f #50-repair machine and remove lost motion.
Sep 15, 1997 · Penalty $200
Resolve - Non-hazardous
50f33o 50-repair machine and remove lost motion 33-clean and remove excessive grease from overhead shelves, and cables.
Sep 15, 1997 · Penalty $200
Resolve - Non-hazardous
50f52e 50-repair machine and eliminate lost motion #52-adjust machine brake for proper operation to elevator floor stops.
Sep 15, 1997 · Penalty $200
Resolve - Non-hazardous
75u 5 year test perform and file. 49r reshackle hoist cables.
May 15, 1996
Resolve - Non-hazardous
73#, (73) you are hereby directed to perform 2 year test and inspection in the presence of a elev. insp. from thiss department.
Oct 23, 1991
Resolve - Hazardous
73i. #73.restore elevator to service after all damaged elevator equip.& shifwall wall has been repaired and full load operation has been performed in presence of elev. inspector.
Oct 22, 1991 · Penalty $500
Resolve - Non-hazardous
46k,8j
Sep 25, 1991
Resolve - Non-hazardous
42l,49h,19l
Sep 25, 1991 · Penalty $150
Resolve - Non-hazardous
42l,15l,15l,19l,74l,74ah,74b#,3i,74 repair cummutator 74a renew the brushes on the commutator 74b remove the gate & door from in front of the hoistway door at the mezzanine level 3 the back of the elavator scra
Sep 25, 1991
Resolve - Non-hazardous
17i,17r,47h
Sep 25, 1991 · Penalty $75
Resolve - Non-hazardous
74l,37l,6r,74 repair commutator
Sep 25, 1991
Resolve - Non-hazardous
40t; properly tag governor and releasing carrier for 5 year test.
Mar 8, 1991
Resolve - Non-hazardous
40t; provide 5 year test tag on governor and releasing carrier.
Mar 8, 1991
Resolve - Non-hazardous
Elevators
Mar 8, 1991
Resolve - Non-hazardous
40t; properly tag for 5 year test..
Mar 8, 1991 · Penalty $150
Resolve - Hazardous
Failure to maintain interior noted side walk vault bearing masonry wall is bulging into building sidewalk vault steel rusted broken and defective causing a hazardous condition interior masonry partitions broken
Oct 12, 1989 · Penalty $500
Resolve
Complaints
- Water leak
Heavy flow
Sep 8, 2026 · Apt 19D
Close - Heat/hot water
Entire building
May 24, 2023 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Office building (O6)
- Year built
- 1901
- Floors
- 8
- Residential units
- —
- Building area
- 165,513 ft²
- Lot area
- 18,400 ft²
- Zoning
- C6-3A
- Community board
- 104
- Council district
- 3
- Block / lot
- 795 / 28
- Assessed value
- $23,598,450
- Landmark / historic district
- No
Questions about 111 West 19 Street
Who owns 111 West 19 Street?
The owner of record in NYC Department of City Planning PLUTO data is 19th Street Owner LLC.
Does 111 West 19 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 111 West 19 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 111 West 19 Street built?
City records list 1901 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.