roofy

135 West 14 Street

Manhattan, NY 10011BBL 1-00790-7504Map

Owner of record: Unavailable Owner

135 West 14 Street is a condominium built in 1906 in Manhattan, 10011. It has 9 residential units across 11 floors. The owner of record is Unavailable Owner. HPD has recorded 31 housing violations here, most recently on April 11, 2018. 5 of the 31 most recent violations are still open.

HPD violations
31
DOB violations
10
ECB violations
16
HPD complaints
15

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 11, 2018

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 31

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east located at apt 10, 10th story, 1st apartment from south at west

    Apr 11, 2018 · Apt 10

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood floor at upper level in the 1st room from east located at apt 10, 10th story, 1st apartment from south at west

    Apr 11, 2018 · Apt 10

    Open — First no access to re- inspect violation
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Mar 15, 2017

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Mar 15, 2017

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box , at public hall, 1st story

    Mar 15, 2017

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system above mailbox at public hall, 1st story

    Mar 15, 2017

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door at public hall, 1st story

    Mar 15, 2017

    Open — Not complied with
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch at the building entrance door at public hall, 1st story

    Mar 15, 2017

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 1, 2016

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 1, 2016

    Closed — Violation closed
Show 21 more ↓
  • B

    Repair the roof so that it will not leak at ceiling above west window in the 3rd room from north at east located at apt 10 lower level, 10th story, 1st apartment from north at east

    Mar 30, 2016 · Apt 10

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling above west window in the 3rd room from north at east located at apt 10 lower level, 10th story, 1st apartment from north at east

    Mar 30, 2016 · Apt 10

    Open — First no access to re- inspect violation
  • B

    Repair the roof so that it will not leak above ceiling in the 1st room from north located at apt 10 upper level, 10th story, 1st apartment from north at east

    Mar 30, 2016 · Apt 10

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 10 upper level, 10th story, 1st apartment from north at east

    Mar 30, 2016 · Apt 10

    Open — First no access to re- inspect violation
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 2, 2015

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at upper north wall at vestibule

    May 5, 2014

    Closed — Violation closed
  • B

    Replace with new the broken or defective metal cap at chimney on roof

    May 5, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at south wall on 11th story public hall stairs(stair a)

    May 5, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and walls on 10th story public hall stairs(stair b)

    May 5, 2014

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color soffit above windows at south wall in the 1st room from east at south located at apt 10 lower level, 10th story, 1st apartment from north at east

    May 5, 2014 · Apt 10

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color soffit above windows at south and west walls in the 2nd room from east at south located at apt 10 lower level, 10th story, 1st apartment from north at east

    May 5, 2014 · Apt 10

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of houshold items at 12th story roof

    May 5, 2014

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective stucco material at north and east parapet wall on 11th story north east roof.

    May 5, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective stucco material at north exterior wall at elevator room on upper roof

    May 5, 2014

    Closed — Violation closed
  • A

    Refit door at elevator room (exterior) at roof

    May 5, 2014

    Closed — Violation closed
  • A

    Thoroughly whitewash or paint with a light color the surfaces at 5th story west builing exterior wall

    May 5, 2014

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at soffit above window at north & west walls approx. 5square feet in the 1st room from north at east located at apt 10 lower level, 10th story, 1st apartment from north at east

    May 5, 2014 · Apt 10

    Closed — Violation closed
  • A

    Provide place within the building for the storage of waste receptacles and disinfect same regularly. at cellar

    May 5, 2014

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at exit door landing at public hall stairs from street to at cellar

    May 5, 2014

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of plant fixtures obstructed pathway from stair a exit door to stair b exit door on roof.

    May 5, 2014

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation at iron beam canopy above building front entrance

    May 5, 2014

    Closed — Violation closed

DOB building violations · 10

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 28, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 21, 2013

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Mar 5, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2011

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 16

  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#901750.rem:submit acceptable required t

    Apr 11, 2024 · Penalty $1,250

    Active
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or building dept records. note: the storage in cellar is converted and using as hair salon (gemini hair salon) which is contrary to certificate

    Oct 28, 2015 · Penalty $1,200

    Active
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance wcode provisions: periodic insp. of exterior walls & appurtenances as required by article 28.302 & the dept. of bldg rules & regulations. rem

    Jul 1, 2014 · Penalty $4,000

    Active
  • Class - 2

    Work w/o a permit. work noted: at time of inspection approx 6'-0 in progress on north terrace of 11th fl w/o obtaining all approval & permit from bldg dept. remedy: stop all work on north terrance obtain permit

    Aug 2, 2013 · Penalty $800

    Active
  • Class - 2

    Work w/o permit. observed 1 hvac unit installed on front wall of bldg 135 west 14th st. remedy: obtain permit.

    Oct 12, 2012 · Penalty $800

    Resolve
  • Class - 2

    14m07 67x10 70o02 71x10 40p16 15m07 16p16. 14m07- missing mirror in cab provide mirror as per rule 3001.6 of chapter 30 - 16p16- all flrs locked out - provide access to all flrs for inspection.

    Dec 7, 2010 · Penalty $250

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner: lack of system of automatic sprinklers where required. upon physical inspection found on1st fl. street entrance no siamese connection at construction gate.(2)

    Sep 5, 2008 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to protect roofs, roof outlets or skylights of adjoining property during const operations job# appl 103540553 expires 12/12/06 no netting or protective guard on adjoining roofs @ time of inspection

    Aug 4, 2006 · Penalty $10,000

    Resolve
  • Hazardous

    Sidewalk shed does not meet bldg code specifications. noted: no lighting provided for underside of shed at time of pm inspection. inspectiontime 7:25 creating hazardous condition for pedestrians. remedy: confor

    Mar 27, 2006 · Penalty $2,000

    Resolve
  • Non-hazardous

    Failure to file an amended fifth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial re

    Mar 14, 2006 · Penalty $1,750

    Resolve
Show 6 more ↓
  • Non-hazardous

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial re

    Mar 14, 2006 · Penalty $1,750

    Resolve
  • Non-hazardous

    20050811yons:periodic iinsp. of exterior walls & appurtenances as required by ll 11/98 & the dept of bldgs rules & regulations.remedy:file the requi

    Apr 8, 2005 · Penalty $10,000

    Resolve
  • Non-hazardous

    Failure to submit a fifth round technical report: periodic inspection of exterior walls and appurtenances as required by local law 11 of 1998 and the department of buildings rules and regulations. remedy: file

    Aug 20, 2004 · Penalty $10,000

    Resolve
  • Non-hazardous

    Failure to maintain defect is lintel above 2nd floor window opening-approx 12' long is rusted and sagging approx 2".remedy:repair defect

    Mar 3, 2003 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterrior building wall: noted: the lintel above the second floor window opening approx 12' long is deflecting approx 2' and is failing causing stones above to become loose creating a hazard

    Nov 22, 2002 · Penalty $2,500

    Resolve
  • Non-hazardous

    46b13-22d06-73x11-57o02-35o02-37b09. 73-car shut down at lobby doors constanty recycle 37-remove blocking from relays.

    Jul 29, 2002 · Penalty $2,500

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Apr 5, 2018 · Apt 10

    Close
  • Paint/plaster

    Wall

    Apr 5, 2018 · Apt 10

    Close
  • Flooring/stairs

    Stairs

    Apr 5, 2018 · Apt 10

    Close
  • Plumbing

    Water supply

    Apr 29, 2014 · Apt 10

    Close
  • Door/window

    Window frame

    Apr 29, 2014 · Apt 10

    Close
  • Door/window

    Door frame

    Apr 29, 2014 · Apt 10

    Close
  • Elevator

    Maintenance

    Apr 29, 2014 · Apt 10

    Close
  • Water leak

    Heavy flow

    Apr 29, 2014 · Apt 10

    Close
  • Paint/plaster

    Wall

    Apr 29, 2014 · Apt 10

    Close
  • Outside building

    Roof door/hatch

    Apr 29, 2014 · Apt 10

    Close
Show 5 more ↓
  • Electric

    Lighting

    Apr 29, 2014 · Apt 10

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2014 · Apt 10

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 29, 2014 · Apt 10

    Close
  • Plumbing

    Radiator

    Apr 29, 2014 · Apt 10

    Close
  • Heating

    Heat related

    Dec 7, 2010 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1906
Floors
11
Residential units
9
Building area
21,172 ft²
Lot area
5,165 ft²
Zoning
C6-2A
Community board
104
Council district
3
Block / lot
790 / 7504
Assessed value
$6,969,603
Landmark / historic district
No

HPD registration #143275, last renewed Sep 23, 2025.

Questions about 135 West 14 Street

Who owns 135 West 14 Street?

The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.

Does 135 West 14 Street have violations?

Yes. NYC HPD has recorded 31 housing violations at this property.

Is 135 West 14 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 135 West 14 Street built?

City records list 1906 as the year it was built.

How many apartments are in 135 West 14 Street?

It has 9 residential units and 10 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.