257 West 38 Street
Manhattan, NY 10018BBL 1-00788-0016Map
Owner of record: Uzi Realty Corp
257 West 38 Street is a factory / industrial built in 1927 in Manhattan, 10018. The owner of record is Uzi Realty Corp. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 289
- ECB violations
- 72
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 289
- High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active
ECB violations · 72
- Class - 2
Failure to maintain building exterior walls facade and appurtenances: at the time of inspection observed crack coping stone 16 floor setback west, damaged stone joint at 12 floor setback, and crack window pane
Aug 1, 2023
Resolve - Class - 1
Class 1 car cease use ,door zone restrictor not working tampered with or disabled (cu) 2/x/10 alarm bell inside car does not ring when activated repair.
Oct 5, 2022
Resolve - Class - 2
Failure to maintain bldg exterior walls/facade & appurtenances.note:atthe time of inspection observed at expo #1 south elevations crack windowpane s floor west.damaged joints at 16 fl set back west.bulged facad
Mar 3, 2021 · Penalty $1,250
Active - Class - 2
2x10,16d4,16b7-2x10)provide outside communication. 16d4)patch holes in hoistway doors. 16b7)provide guard for top of lobby door.
Nov 29, 2018
Resolve - Class - 2
97x10 restore to servcie as per code of nyc dob immediately.
Apr 6, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior building facade & appurentces.as noted:exposure 1,spalled terracotta water table,cracks on water table,craked stone,broken window,deteriorating window frames,unknown object out side
Jan 24, 2018
Resolve - Class - 1
5x7,2x10,24b10,39b10. 5x7-door restrictor inoperative provide bracketon door track; 2x10-repair alarm bell inoperative; 24b10-repair travellantern; 39b10-repair to pof car light.
May 3, 2017 · Penalty $2,500
Resolve - Class - 2
56y13,61m7,42n9,40m7. 56y13-havy oil under machine seal; 61m7-provideservice sticker on main line;42n9-remove block relay off controller 40m7-provide elevator maintenance contract provider.
Nov 30, 2016
Resolve - Class - 1
59b10,7x1,2b10,40b7. 59b10-electrical break contract is missing one contact; 7x1-door restrictor is inoperative adjust; 2b10-emergency alarm does not ring repair; 40b7-provide accurate maintenance log on what
Nov 30, 2016 · Penalty $1,000
Resolve - Class - 1
7x1,2b10,24b10,59b1,40b15. 7x11-door restrictor is inoperative adjust2b10-alarm bell insufficient does not ring repair; 24b10-position indicator show down as the elevator is going p make all repair; 59b1-adjus
Nov 30, 2016 · Penalty $1,000
Resolve
Show 40 more ↓
- Class - 2
97x10,100m05, 97x10-device out of service,repair to bring back in service; 100m07-ntc id tag missing in car provided and install tag.
Aug 31, 2015 · Penalty $250
Resolve - Class - 2
97x10 elevator not working. return to service.
Aug 18, 2015
Resolve - Class - 2
02l10 outside communication defective. phone is not connected. providecommunication.
Aug 18, 2015
Resolve - Class - 2
97x10 98bb05 98m07 99bb05 99m07 97x-return to service 98bb-as per dob records 99bb-as per dob records
Jan 11, 2011 · Penalty $250
Resolve - Class - 2
97x10 - repair elevator and restore to service
Oct 19, 2010 · Penalty $500
Active - Class - 2
97/x/#/37x#-entire device inoperative-restore device back to service
Sep 16, 2010 · Penalty $500
Active - Class - 2
97/x/10-97-x-10-elevator device 1p15541return to service.recurring condition.prior ecb violation 38211110h
Aug 9, 2010 · Penalty $500
Active - Class - 2
97x10 - 97 restore elevator back to service
Jun 29, 2010 · Penalty $500
Active - Class - 3
12l11,67x10,42b11,56y11. 12l- replace defective light bulbs. 42b- replace controller. door panel with city id tag. 56y- repair oil leak & provide catch pan id.
Jun 1, 2010
Resolve - Class - 3
42b11,45m13,41b01,67x10,12l11. 42b- replace controller door panel withcity id tag. 15m- properly calibrate governor & seal 41b- machine room(new) must be self closing. 12l- replace defective bulbs.
Jun 1, 2010
Resolve - Class - 2
97x10. 97x- device found inoperative- restore device back to service call dob for inspection
Jun 1, 2010 · Penalty $500
Active - Class - 2
97.97 elevator under c.u recurring condition restore and repair elevator back to service
Jan 11, 2010 · Penalty $1,250
Active - Class - 2
97x10.97 recurring condition restore back to service
Dec 4, 2009 · Penalty $500
Active - Class - 2
97x10.restore elevator back to service recurring condition on c.u
Nov 13, 2009 · Penalty $2,500
Active - Class - 2
97x10. 97-under cease use. recurring condition restore elev back to service
Oct 29, 2009 · Penalty $500
Active - Class - 2
97x10.97 recurring condition restore elevator back to service
Oct 19, 2009 · Penalty $500
Active - Class - 1
Cu 97l10 44h10/11 60q03 42l10 69m07 12q03 46m07 64a15 97-car starting to overspeed in down direction w/ capacity repair 44-traction sheave worn repair/replace and application for nov 42-repair speed along an co
Sep 8, 2009 · Penalty $1,000
Active - Class - 1
Cease use item 59x10 - brake monitor inspective repair call 212-566-5542 to obtain to service
Sep 8, 2009 · Penalty $1,000
Resolve - Class - 3
36,50a,b,c. fulton vt boiler,10hp,nb 82217,gas fired,1998.36-referenced high pressure steam boiler in operation is not registered on the dept of bldg database.obtain application signoff to legalize the boiler
Mar 31, 2009
Resolve - Non-hazardous
50a,b,c.fulton vt boiler,10hp,nb 82217,gas,1998.50a-improper arrangement of the blowdown valves.install screw type (slow) valve at the outlet end of the blowdown line.50b-no drain line on the gauge glass assemb
Mar 17, 2008
Resolve - Non-hazardous
50a,b,c,d,e,48a,b.hot shot electric hp stm blr,4 srw.50a-blowdown linereduced.increase blowdown line to uniform size.50b-no secondary valve on the blowdown line.48a,b-dirty & leaking gauge glass assembly.50c-co
Mar 17, 2008 · Penalty $2,500
Active - Non-hazardous
50a,b.fulton vt boiler, 10hp,nb 72886, gas 1995.50a-clean out cover onflue pipe missing.replace.50b-improper arrangement of the blowdown valves.install a screw type (slow) valve at the outlet end of the blowdow
Mar 4, 2008 · Penalty $180
Active - Non-hazardous
50.fulton vt boiler,10hp,nb 64736,gas,1992.50-no structure supports onthe loaded flue pipe system.install a heavy duty rod hanger attached to the boiler room ceiling.
Mar 4, 2008
Resolve - Non-hazardous
36,50a,b.(reimers) elect minia hp ston blr 8 kw 051909.36-referenced electric miniature high pressure steam boiler is not registered on the dept of bldg.database respondent must obtain a signed off application
Mar 4, 2008 · Penalty $350
Active - Non-hazardous
84r04.84-door & gate bypass switches in controller operations,disarm switches.
Feb 21, 2008
Resolve - Non-hazardous
84r09,84l10.84-door & ( )switches in control operations:( )switch.84-why does pulling m/l disconnect on this car make other car stop at every fl problem w/group controller on hall buttons repair.
Feb 21, 2008
Active - Non-hazardous
84r09 remove illegal hoistway door & gate by pass switches.
Dec 11, 2006
Resolve - Non-hazardous
84r09-hoistway door& gate bypass switches operational in controller remove switched from operation
Dec 11, 2006
Resolve - Non-hazardous
Bq9,36,44c,50. 1993 fulton nb66457.50)fire door on boiler room has louvers that must be converted.
Apr 25, 2006 · Penalty $850
Active - Non-hazardous
Bq9,50a,36,50d.1995 fulton nb 72961.50a)hole in wall by window.50b) hole in wall by compressor.
Apr 25, 2006 · Penalty $5,000
Active - Non-hazardous
Bq9,50a,50b,36.1994 fulton nb 72886.50a)pipe down glass drain valve. 50b)holes in wall.
Apr 25, 2006 · Penalty $680
Active - Non-hazardous
6a,bq9,36,50. hot shot sussman 69580.6a) set pressure on safety valve is 150psi minature boiler is rated for 100ps.50 threads on safety valve discharge pipe.
Apr 25, 2006 · Penalty $400
Active - Non-hazardous
36,50a,50b,50c,50d.1988 fulton nb 39169.50a)replace missing rods on glass assembly.50b)boiler door is wood.50c)install a slow opening valve on the bottom blow down line.50d)pipe down glass drain valve.
Apr 25, 2006 · Penalty $2,500
Active - Non-hazardous
17h10. (17-h-10)repair hoistway door gibs.
Dec 30, 2005 · Penalty $180
Resolve - Non-hazardous
50a/50b. 1992 fulton natl bd 64381. 50a seal all holes above door. 50b repair door it is falling down when you try to close it.
Feb 11, 2005
Resolve - Non-hazardous
50a/50b 50c fulton v.t. boiler, 10hp, nb65468, gas-fired, 1992 50a improper arrangement of blowdown valves. replace existing ball valve witha screw-type valve at the outlet end of the blowdown line. 50b no
Jun 18, 2004 · Penalty $180
Active - Non-hazardous
50 fulton v.t. boiler, 10hp, nb64736, gas-fired, 1992 50 improper arrangement of blowdown valves. replace existing ball valve with a screw-type gate valve at the outlet end of the blowdown line.
Jun 18, 2004
Resolve - Non-hazardous
50a/50b fulton v.t. boiler, 10 hp, nb 63259, gas-fired, 1991 50a improper arrangement of blowdown valves. replace bare valve at outlet end with a screw-type gate valve. 50b no insulating sleeve on steam supply
Jun 18, 2004 · Penalty $180
Active - Non-hazardous
Bq9/18ab 44c/50a 50b fulton v.t. blr, 6hp, nb 32349, gas-fired, 1976 referenced boiler was removed from 262 west 38 st in manhattan 5th floor and installed at 257 w 38 st 14th flr. boiler was registered as 1086
Jun 18, 2004 · Penalty $850
Active - Non-hazardous
16, 36, 49. bq9 27-147 fucion high pressure boiler fboloa nb #63259 built 1991 installed without a permit from d.o.b. boiler not registered at 257 west 38th street dept records show boiler at 252 west 37th stre
May 8, 2002 · Penalty $850
Active
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Factory / industrial (F9)
- Year built
- 1927
- Floors
- 16
- Residential units
- —
- Building area
- 78,325 ft²
- Lot area
- 5,305 ft²
- Zoning
- M1-9A
- Community board
- 105
- Council district
- 3
- Block / lot
- 788 / 16
- Assessed value
- $6,389,100
- Landmark / historic district
- No
Questions about 257 West 38 Street
Who owns 257 West 38 Street?
The owner of record in NYC Department of City Planning PLUTO data is Uzi Realty Corp.
Does 257 West 38 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 257 West 38 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 257 West 38 Street built?
City records list 1927 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.