Owner of record: 265 W 37 Owner LLC

540 8 Avenue is an office building built in 1925 in Manhattan, 10018. The owner of record is 265 W 37 Owner LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
807
ECB violations
99
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 807

  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
Show 40 more ↓
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 internal hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active
  • High pressure boiler boiler required

    Violation issued-failure to file 2024 external hgh pressure inspection

    Nov 14, 2025

    Dob violation - active

ECB violations · 99

  • Class - 1

    I observed installation of three new illuminated signs "barbie dunkin' dreamhouse" with and approximately dimensions of (l6'xw4"xh5') and (l12"xw12"xh7') without an electrical permit on file., obtain permit; ob

    Jun 17, 2026 · Penalty $2,500

    Active
  • Class - 2

    I observed in "barbie dunkin' dream house" installation/replacements of light fixtures throughout the store without an electrical permit on file, obtain permit; obtain electrical permit

    Jun 17, 2026 · Penalty $1,250

    Active
  • Class - 2

    Observed sidewalk shed in place at exp#1&4 not as per drawings. observed drawings calls for 20ft high shed with 3x2" horizontal bracing (pipe) on each sidewalk shed bay. while on site observed missing the horiz

    Oct 15, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed sidewalk shed erected at exposure #1- .observed no light under the sidewalk shed create an unsafe condition for pedestrian 3307.6.4.8 light ..

    Jun 28, 2024 · Penalty $2,400

    Active
  • Class - 2

    Failure to comply with commissioners order to file a certificate of correction with the department of buildings of buildings for violating conditions cited in violation#34378357z issued on 11/22/02 pursuant to

    Aug 17, 2021

    Resolve
  • Class - 2

    Pedestrian protection doesn't meet code specifications @time of inspection responding to complaint on 23stybldg observed,@exp1,sidewalk shedin place observed bolts&screw w/o caps&sharp edges,bolts&sharp edges w

    Jan 28, 2021 · Penalty $2,430

    Resolve
  • Class - 2

    Failure to maintain/display on site documents required by bc chapter 33.at time of inspection on an active jobsite of a 23 story exist building,observed suspended scaffold in use installed unit c-hooks at exp#1

    Aug 26, 2020

    Resolve
  • Class - 2

    Failure to provide approved plans at jobsite at time of inspection on an active jobsite of a 23 story existing building observed facade repars with suspended scaffold(c-hook)in progress at exp#1 & 2.upon reques

    Aug 26, 2020

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification.at itme of imy inspection i observed sidewalk shed in place with(5 rotten mudsills atexpo#1 and missing cross bar.creating a hazardous condition for sidewa

    Jan 22, 2020 · Penalty $2,400

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification:sidewalk shed maintenance. at the time of my inspection of a proposed 23 story alteration i observed issues w/ the sws. the mudsills are deteriorating. som

    Dec 30, 2019 · Penalty $10,000

    Active
Show 40 more ↓
  • Class - 1

    Failure to take adequate required measures to secure public safety from documented unsafe facade. as per 1rcny 103-04. as noted above:-at the time of inspection i observed on exposure#1 south elevation:damaged,

    Mar 22, 2019 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to file acceptable cycle 8b repoprt indicating correction of unsafe conditions described in initial facade report required by 28-302.5 for control # 801707. remedy: file acceptable report.

    Aug 1, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Sec. 42-411 failure ti comply w/uses located w/i a completely enclosedbldg in a m-1 zoning districts. noted: illegally exists store merchandise for sale to the public on step wheeled display & handers,partially

    Aug 1, 2014

    Resolve
  • Class - 1

    28-116.4.1: 97r07,45r07: 97;failure to obtain cert of compliance. no report of inspection submitted to dob & no witnessing of test by dob. rem:contact dob to schedule test to obtain cert of compliance for ebn 7

    May 31, 2012 · Penalty $1,600

    Active
  • Class - 1

    100i/k10/11 05b07 34o02 100i10 km07 100h/i11 01i10 38#09 77x10 53o02 77o02 75k10 76x10 76i11. 100-sb lock damaged/rusted/ 05-provide 2nd handle on gate. 34-clean door hoistway. 100-repair communication button i

    Feb 17, 2012 · Penalty $1,000

    Active
  • Class - 3

    98bb05. 98bb- file & perform 5 yr test, tag expired

    Jul 28, 2010 · Penalty $200

    Resolve
  • Class - 1

    Failure to perform safe/proper inspection of suspended scaffold. notedno continuity of daily inspection in daily inspection log. prior inspection altered to reflect current date 4/20. remedy: conform to safety

    Apr 22, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Inadequate safety measures operation of hoisting equipment in unsafe manner. noted: multiple tie back cables and life lines all attached tosingle (double wrap) 5/16" cable at bulkhead. remedy: conform to code

    Apr 22, 2010 · Penalty $4,800

    Resolve
  • Class - 3

    36. sussman electrical minature 8cr 8kw 2008 6509 36 referenced electrical high pressure steam boiler isn't registered on the dob database respondent must file application and obtain sign-off to legalize the

    Mar 25, 2009 · Penalty $200

    Active
  • Class - 3

    36.50d.50a.50c sussman minature electrical box 17kw mb 124455 36 references electrical minature steam boiler in operation isn't registered on the sob data base file application and obtain sign off to legalize

    Mar 25, 2009 · Penalty $200

    Active
  • Non-hazardous

    50a,50b.fulton v.t blr,10hp,nb 69874,gas,1994.50a-inadequate structuresupport of the loaded flue pipe system installed on the referenced boiler.provide a heavy duty rod hanger attached to the boiler room ceilin

    Mar 17, 2008 · Penalty $180

    Active
  • Non-hazardous

    18a,b.fulton v.t. blr 10hp nb 65252, gas, 1992.18a,b-scale accumulation corrosion & leakage at upper & lower handholes.flush boiler & regasket openings for compliance

    Mar 17, 2008 · Penalty $180

    Active
  • Non-hazardous

    36,50a.reimers hp miniature electric blr 6kw.36-referenced boiler is not registered on the dob database.respondent must file for & obtain a signed off 900a & schedule c to validate the boiler registration.50a-

    Jan 19, 2008 · Penalty $350

    Active
  • Non-hazardous

    36,5a.electric hp steam boiler,miniature(36)referenced boiler is not registerd on the dob database.respondent is required to obtain a signedoff 900a & schedule c to validate registration.6a-steam leakage at the

    Jan 19, 2008 · Penalty $350

    Active
  • Non-hazardous

    50a.b.c.fulton vt blr 15hp,nb 65660,gas 1992.50a-secondary low water cut off manual reset switch disconnected.restore the switch to the tripcircuit in the boiler control panel.50b-air compressor motor drive sha

    Jan 16, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    36,50a,b.reimers electric miniature hp steam blr.4 -5 slw.36-referenced boiler not registered on the dob database.respondent must obtain signed off 900a & schedule c to legalize commercial boiler.50a-low water

    Jan 12, 2008 · Penalty $350

    Active
  • Non-hazardous

    50a,b,c.fulton vt blr.10hp,nb 41279,gas fired,1982.50a-section of blowdown drain piping corroded.replace defective pipe fittings.50b-steam pressure gauge has a dial range of 0-160 psi.install a replacement o-30

    Jan 12, 2008 · Penalty $180

    Active
  • Non-hazardous

    50. fulton v.t. boiler 6 hp, nb46981, gas 1985. 50- improper arrangement of the blowdown valves on the high pessure steam boiler. install a screw type (slow) valve at the outlet end of the blowdown line for cod

    Apr 19, 2006

    Resolve
  • Non-hazardous

    50a/50c/50b. fulton v.t. voiler, 15hp, nb65660 gas, 1992. 50a- secondary low water manual reset switch disconnected. re-connect switch in boiler control panel. 50b- no protective guard in place, on the drive s

    Apr 18, 2006 · Penalty $180

    Active
  • Non-hazardous

    50a,50b/ fucton v.t. boiler, 10hp, nb 69573, gas, 1994/ 50a-improper arrangement of the browdown valves. install a screw type (slow) valve at the outlet end of the browdown line/50b-no protective guard over the

    Apr 17, 2006

    Resolve
  • Non-hazardous

    50/ fucton v.t. boiler, 10hp, nb 60612, gas, 50-no protective guard over the drive shaft coupling of the boiler's air compressor motor.

    Apr 17, 2006

    Resolve
  • Non-hazardous

    50/ fucton v.t. boiler, 10hp, nb65001, gas, 1992. 50-broken sandard strap hanger on the flue pipe. replace with a heavy duty rod hanger

    Apr 17, 2006

    Resolve
  • Non-hazardous

    44c 50b 50a 50c fulton vt boiler, 10hp, nb69874, gas, 1994 50a corroded steam stop valve. replace. 50b no secondary screw-type valve on the blowndown line. 50c deficient structure supports on the flue pipe. ins

    Jul 7, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    18ab 50a 50c 34a 50b fulton vt boiler, 10hp, nb62159, gas, 1991 50a blowdown line corroded & valves in wrong positions. reposition screw-type gate valve at the discharge end of the line. 50b no structural suppo

    Jul 7, 2004

    Resolve
  • Non-hazardous

    44c 50b 50a fulton vt boiler, 10hp, nb64104, gas 1992 50a deficient structure support of the flue pipe system. install heavy duty manger to the boiler room ceiling. 50b improper arrangement of the blowdown valv

    Jul 7, 2004 · Penalty $180

    Active
  • Non-hazardous

    50a 50c 50e 50b 50d fulton vt boiler, 10hp, nb72433, gas, 1995 50a inadequate structural support for the flue pipe. install heavy duty hanger to boiler room ceiling. 50b improper arrangement of the blowndown va

    Jul 7, 2004

    Resolve
  • Non-hazardous

    50a 50c 50b fulton vt boiler, 10hp, nb68979, gas, 1993 50a inadequate structural support on the flue pipe system. installed a heavy duty hanger attached to the boiler room ceiling. 50b improper arrangement of

    Jul 7, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    18ab 50a 48ab 50b fulton vt boiler, 10hp, nb41279, gas-fired, 1982 50asteam pressure gauge has a dial range of 0-160psi pressure gauge must have a range of 0-300psi for code compliance. 50b no secondarty sdrew

    Jul 6, 2004 · Penalty $2,500

    Active
  • Non-hazardous

    18ab 50b 50a fulton vt boiler 10hp, nb65252, gas 1992 50a corroded & leaking feed water incet line near check valve 50b no secondary screw-type shut off valve on the blowdown line. 18ab corrosion & leakage at u

    Jul 6, 2004 · Penalty $350

    Active
  • Non-hazardous

    48ab 50b 50a 50c fulton vt boiler, 10hp, nb25689, gas-fired, 1971 50a secondary low water cut off manual reset switch disconnected and removed. 50b no secondary screw-type shot off valve on the blowdown line 50

    Jul 6, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    18ab 48ab 50b 50d 34b 50a 50c fulton vt boiler, 10hp, nb30837, gas-fi red, 1973. 50a no secondary screw-type shut off valve on the blow down line. 50b secondary low water cut off manual reset switch disconnecte

    Jul 6, 2004 · Penalty $180

    Active
  • Non-hazardous

    Filing a false statement of correction with nyc dob.prior ecb 34399936x issued 10/24/03.found in violation 12/18/03 for illegal occupancy of northern most 1st floor mezz as an adult cabaret has filed a certific

    Jul 2, 2004

    Resolve
  • Non-hazardous

    (1)operation of northern most 1st floor mezzanine as a place of assembly (2)operation of a strip club on northern most 1st floor mezz (whereemployees routinely reval/expose specified an atomical areas as det in

    Jul 2, 2004

    Resolve
  • Non-hazardous

    50a/50b fulton v.t. boiler, 10hp, nb 65494, gas; 1992 50a no structural support on the flue pipe. install heavy duty hanger to boiler room ceiling 50b no secondary screw-type valve on the browdown line.

    Jun 30, 2004 · Penalty $180

    Resolve
  • Non-hazardous

    50a/50b fulton v.t. boiler 15 hp, nb 65660, gas, 1992 50a inadequate structural support of the flue pipe. install heavy duty hanger to boiler room ceiling. 50b improper arrangement of blowdown valves. install

    Jun 30, 2004 · Penalty $2,500

    Active
  • Non-hazardous

    50a/50b fulton v.t. blr 10hp, nb 69573, gas, 1994 50a no structural support on the flue pipe. install heavy duty hanger to boiler room ceiling. 50b no discharge pipe on the safety valve.

    Jun 30, 2004

    Resolve
  • Non-hazardous

    50a/50b 50c/16 fulton v.t. boiler, 10hp, nb 44911, gas, 1984 50a inadequate support of the boiler flue pipe system. flue pipe with draft inducer hung from sewer piping in boiler room. install heavy duty hanger

    Jun 30, 2004

    Resolve
  • Non-hazardous

    50a fulton vertibrates blr. 10hp, nb 60612, gas, 1990 50a improper arrangement of brow down valves. switch existing valves around to place screw-type gate valve at the discharge end of the line.

    Jun 30, 2004 · Penalty $180

    Active
  • Non-hazardous

    50a/50b fulton v.t. boiler, 10hp, nb 65001, gas, 1992 50a improper arrangement of browdown valves. switch valves around and re-position screw-type valve at the outlet end of the line 50b no discharge pipie on

    Jun 30, 2004

    Resolve
  • Non-hazardous

    38l10/1b10/16b1/83o2/31h10/51k11/71m7/21m7/11m7/38b10/71b11/73b1/37a9.38l10=repair inspection top of cpc/01-b-10 repair alarm on stop switch./adjust door closers on hoistway doors/provide missing toe guard.21-m

    Feb 3, 2004 · Penalty $350

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O4)
Year built
1925
Floors
23
Residential units
—
Building area
225,858 ft²
Lot area
9,875 ft²
Zoning
M1-9A
Community board
105
Council district
3
Block / lot
787 / 1
Assessed value
$14,974,200
Landmark / historic district
No

Questions about 540 8 Avenue

Who owns 540 8 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 265 W 37 Owner LLC.

Does 540 8 Avenue have violations?

NYC HPD has no housing violations on record for this property.

Is 540 8 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 540 8 Avenue built?

City records list 1925 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.