286 8 Avenue
Manhattan, NY 10001BBL 1-00774-0004Map
Owner of record: Carlamy Realty LLC
286 8 Avenue is a store building built in 1920 in Manhattan, 10001. The owner of record is Carlamy Realty LLC. HPD has recorded 73 housing violations here, most recently on May 20, 2025. 13 of the 50 most recent violations are still open.
- HPD violations
- 73
- DOB violations
- 7
- ECB violations
- 27
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 73
- BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line of wash basin in the bathroom located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
May 20, 2025 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
May 20, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story
May 20, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 4th story
May 20, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 4th story
May 20, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 26, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 26, 2024
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 26, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Mar 26, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 26, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south wall in the 2nd room from east located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 2nd room from east located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of painted sprinkler head 2nd from east at public hall stairs, 1st story
Mar 26, 2024
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 26, 2024 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Mar 19, 2024 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Mar 19, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges door at 1st public hall bulkhead from east
Mar 19, 2024
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 4th story
Mar 19, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material ceiling at public hall, 4th story
Mar 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Mar 19, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2f, 2nd story, 2nd apartment from east at south
Dec 28, 2022 · Apt 2F
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2f, 2nd story, 2nd apartment from east at south
Dec 28, 2022 · Apt 2F
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - BHazardous
Replace the broken or defective heating unit at south wall in the 4th room from east located at apt 3r, 3rd story, 1st apartment from east at south
Mar 4, 2022 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Mar 4, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Mar 4, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Mar 4, 2022 · Apt 3R
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective heavy duty lockset at door from street entrance to building , 1st story
Feb 19, 2019
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective lock at entrance door to the building at public hall, 1st story
Jan 29, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and walls at public hall, 1st story
Jan 3, 2019
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story
Jan 3, 2019
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Jan 3, 2019
Open — Not complied with - BHazardous
Properly repair the broken or defective lockset and assembly at entrance door to building at public hall, 1st story
Jan 3, 2019
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130* degress fahrenheit in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Dec 18, 2018 · Apt 3F
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination .. at public hall, 3rd story
Nov 21, 2018
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 3rd story
Nov 21, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall, 3rd story
Nov 21, 2018
Closed — Violation dismissed
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 6, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Jan 10, 1991
Dob violation - dismissed - Electric signs none
Es-electric signs none
Aug 23, 1989
Dob violation - dismissed
ECB violations · 27
- Class - 2
Illegal use in a commercial district. unlicensed physical treatment establishment, a prohibited use per 1z-10, operating in a c6-2a on the 2nd floor level. noted: a masseuse offered to perform a full body massa
Apr 29, 2024
Resolve - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy no #102496979f. illegal occupancy noted: at 2nd floor level has been converted/occupied as a massage parlor "renewing spa" with 7 massage rooms
Apr 29, 2024 · Penalty $6,250
Resolve - Class - 2
Illegal physical treatment establishment is operating in a c6-2a general commercial district on the 2nd floor.a prohibited use as per zr12-10.a masseuse who is not a health care professional licensed by nys or
Jul 26, 2022
Resolve - Class - 2
Occupancy contrary to that allowed by dob records.illegal occupancy noted 2nd floor has been converted/occupied as a massage parlor"renewingspa"with 10 massage rables in 7 massage rooms with oils and towels.rem
Jul 26, 2022 · Penalty $625
Resolve - Class - 1
Work without a permit.noted on the 2nd floor erected partition walls to create massage rooms.electrical work done for drying machine with 220v.additionally water and waste lines for washing machine.remedy:obtai
Jul 26, 2022 · Penalty $1,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35356025l issued on 11/15/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work w/o permit.
Dec 7, 2019 · Penalty $3,125
Active - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35356028l issued on 12/5/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit.remedy
Oct 28, 2019 · Penalty $1,250
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35356025l issued on 12/15/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of
Sep 18, 2019 · Penalty $3,125
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35356025l issued on 12/15/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of
Jul 10, 2019 · Penalty $3,125
Active - Class - 1
Failure to comply with the commissioner's order contained in sum/vio #35356025l issued on 12/15/18 &/or to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply with commissioner's
May 5, 2019 · Penalty $1,250
Active
Show 17 more ↓
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35356025l issued on 11/15/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of
Feb 17, 2019 · Penalty $1,250
Active - Class - 1
Failure to safeguard all persons and proeprty affected by constructionat time of inspection on an occupied mixed use bldg i observed on the 3rd floor at exp3 unpermitted work conducted in disused stairwell. a
Nov 15, 2018
Resolve - Class - 1
Work w/o permit. noted: premises 4story attached masonry frame sprink ler building. at the time of inspecitons i observed created a trash room incluidng wood frame partition and new door at 3rd floor level rear
Nov 15, 2018 · Penalty $1,250
Active - Class - 1
Outdoor advertising company sign on display w/o a permit.(knowing) (stop all work). remedy:remove illegal sign.
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company sign prohibited in cg-2a district (knowing). remedy:remove illegal sign. remedy:remove illegal sign
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company leasing or otherwise making illegal sign space available to others for advertising purpose (knowing). remedy:remove illegal sign.
Apr 7, 2009 · Penalty $10,000
Active - Class - 1
Outdoor advertising company signs exceeds max surface area in cg-2a district of 5x the st frontage. street frontage is 25ft,so max surface area is 125ft sign approx 500sq ft (knowing).remedy:remove illegal sign
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company signs exceed max height in c6-2a district of 40ft signs approx 45ft above curb level(knowing). remedy: remove illegal sign.
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company failure to attach ul or other decal & dateof sign erection to corner of sign fabric (knowing). remedy:remove illegal sign.
Apr 7, 2009
Resolve - Class - 1
Property owner acting as outdoor advertising company failure to obtainpac registration number while engaging in the outdoor advertising business.(knowing) remedy:remove illegal signs/register.
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company sign on display w/o a permit (knowing)(stop all work)rem:remove illegal sign
Apr 7, 2009 · Penalty $5,000
Active - Class - 1
Outdoor advertising company sign prohibited in c6-2aa district (knowing)rem:remove illegal sign
Apr 7, 2009 · Penalty $5,000
Active - Class - 1
Outdoor advertising companyleasing or otherwise making illegal sign space avalable to others for advertising purposes.(knowing)rem:remove illegal sign
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company signs exceed max surface area in c6-2a district of 5x the street frontage.street frontage is 25ft,50max surface area is 125ft sign approx 500sq ft (knowing).rem:remove illegal sign
Apr 7, 2009
Resolve - Class - 1
Outdoor advertising company signs exceed max height in c6-2a district of 40ft sign approx. 45ft above curb level (knowing).rem:remove illegal sign
Apr 7, 2009
Resolve - Class - 1
Oac failure to attach ul or other decal and date of sign's erection tocorner of sign fabric. (knowing). remedy: remove illegal sign.
Apr 7, 2009
Resolve - Non-hazardous
Having increased the hight of the above premises without first altering existing chimney located at 288 eighth ave remedy you are to alter the existing chimney to confrom with dept rules and regulation
Mar 7, 1989
Resolve
Complaints
- Heat/hot water
Entire building
May 22, 2025 · Apt BLDG
Close - Plumbing
Water supply
May 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 19, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Sep 29, 2023 · Apt 2F
Close - Door/window
Door
Sep 29, 2023 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 29, 2023 · Apt 2F
Close - Heat/hot water
Apartment only
Dec 31, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Dec 30, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Dec 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2022 · Apt 2F
Close
Show 40 more ↓
- Unsanitary condition
Mold
Dec 15, 2022 · Apt 2F
Close - Water leak
Damp spot
Dec 15, 2022 · Apt 2F
Close - Paint/plaster
Ceiling
Mar 8, 2022 · Apt 2F
Close - Unsanitary condition
Mold
Mar 8, 2022 · Apt 2F
Close - Water leak
Heavy flow
Mar 8, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Mar 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 1, 2022 · Apt 3R
Close - Safety
Fire escape
May 17, 2019 · Apt BLDG
Close - Door/window
Door
May 9, 2019 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 30, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 29, 2019 · Apt 3F
Close - Door/window
Door
Jan 28, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 28, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt 3R
Close - Door/window
Door
Jan 21, 2019 · Apt 3R
Close - Unsanitary condition
Pests
Jan 21, 2019 · Apt PH
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt PH
Close - Door/window
Window frame
Jan 21, 2019 · Apt 3R
Close - Door/window
Door
Jan 20, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 10, 2019 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 23, 2018 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 18, 2018 · Apt 3F
Close - Door/window
Door
Dec 17, 2018 · Apt 3F
Close - Heat/hot water
Apartment only
Dec 17, 2018 · Apt 3F
Close - Heat/hot water
Entire building
Nov 23, 2018 · Apt 2F
Close - Paint/plaster
Wall
Nov 15, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Nov 15, 2018 · Apt 3F
Close - Unsanitary condition
Pests
Nov 15, 2018 · Apt 3F
Close - Heat/hot water
Apartment only
Nov 15, 2018 · Apt 3F
Close - Door/window
Door
Nov 15, 2018 · Apt 3F
Close - Electric
Lighting
Nov 15, 2018 · Apt 3F
Close - Paint/plaster
Wall
Nov 15, 2018 · Apt 3F
Close - Door/window
Door
Nov 11, 2018 · Apt BLDG
Close - Safety
Smoke detector
Oct 25, 2018 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1920
- Floors
- 4
- Residential units
- —
- Building area
- 7,775 ft²
- Lot area
- 2,467 ft²
- Zoning
- C6-2A
- Community board
- 104
- Council district
- 3
- Block / lot
- 774 / 4
- Assessed value
- $1,652,850
- Landmark / historic district
- No
HPD registration #142545, last renewed Aug 5, 2025.
Questions about 286 8 Avenue
Who owns 286 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Carlamy Realty LLC.
Does 286 8 Avenue have violations?
Yes. NYC HPD has recorded 73 housing violations at this property.
Is 286 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 286 8 Avenue built?
City records list 1920 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.