232 7 Avenue
Manhattan, NY 10011BBL 1-00773-0044Map
Owner of record: Karmelena Realty Co., LLC
232 7 Avenue is a hotel built in 2015 in Manhattan, 10011. It has 18 residential units across 16 floors. The owner of record is Karmelena Realty Co., LLC. HPD has recorded 8 housing violations here, most recently on January 24, 2023.
- HPD violations
- 8
- DOB violations
- 25
- ECB violations
- 26
- HPD complaints
- 15
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of the boiler room
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing from wall at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 24, 2023
Closed — Violation dismissed
DOB building violations · 25
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 6, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 4, 2017
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Feb 4, 2017
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed
Show 15 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 13, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 9, 2014
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jan 22, 2014
Dob violation - dismissed - Zoning none
Z-zoning none
Oct 20, 1995
Dob violation - dismissed - Zoning none
Z-zoning none
Oct 20, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 20, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 20, 1995
Dob violation - dismissed - Zoning none
Z-zoning none
Mar 14, 1995
Dob violation - dismissed - Zoning none
Z-zoning none
Mar 14, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 14, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 14, 1995
Dob violation - dismissed - Zoning none
Z-zoning none
May 22, 1989
Dob violation - dismissed - Zoning none
Z-zoning none
May 22, 1989
Dob violation - dismissed - Zoning none
Z-zoning none
May 22, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
May 22, 1989
Dob violation - dismissed
ECB violations · 26
- Class - 1
Failure to maintain handrails. at time of inspection of a 17 story nb currently topped off, i observed handrails missing on several levels at staircase a. rem: provide adequate handrails as per code.
Feb 3, 2018 · Penalty $1,000
Resolve - Class - 2
Pswo supported scaffold.work does not conform to approved constructiondocuments at time of inspection scaffold has 15 fully planked levels plan note 3 full levels and 8 add bracked level.no details for double s
Jun 27, 2017
Resolve - Class - 1
3314.3.4 loads imposed.note:at the time of my inspection of a 17 storybuilding at bulkhead level,construction work in progress.i obseved a supported pipe scaffold errected on sidewalk shed at exposure one bein
May 9, 2017
Resolve - Class - 1
Sec: bc3301.1.3. manufacturer specification. note: @ time of insp of a 17 story bldg @ roof level, construction work in progress. observed a manufacture concrete embedded system being use @ bulkhead level for m
May 6, 2017 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. (caz,protection) safety measures. note: @ time of insp of a 17 story bldg @ roof level construction work in progress. observed ad
May 6, 2017
Resolve - Class - 1
Operating an articulating boom crane w/o a certificate of operation at the time observed,equipment was being used outside of the exception of bc3319.3(1o) i observed ncco#1611132431 frankling pinzon hired by
Mar 29, 2017 · Penalty $1,000
Resolve - Class - 1
Operating a articulating boom crane w/o a certificate of operation a time observed equipment was being used outside of the exceptionf o bc 3319.3(10) respondent willing and knowing allowed vdcco lic 1611132431
Mar 29, 2017
Resolve - Class - 1
Sec. 3308.2 horizontal netting. noted: horizontal netting not installed as per site safety plan,upon inspection of a 17 sty bldg,roof level decking was being installed & horizontal netting was installed on the
Mar 15, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to institute & maintain safety measure or temporary construction. note: @ time of insp of a 17 story bldg @ 16th flr level, construction work in progress. observed that there were no overhead protection
Mar 6, 2017
Resolve - Class - 2
Sec. 3301.1.3 manufacturer specifications. note: at the time of my inspection of a 17 sty bldg at 16th fl level construction work in progress. i observed concrete embedded safety straps installed. on site from
Mar 6, 2017
Resolve
Show 16 more ↓
- Class - 2
Concrete washout containment. note: @ time of insp of a 17 story bldg @ 16th flr level, construction work in progress. observed concrete washout procedures was being done in concrete formwork equipment. upon re
Mar 6, 2017
Resolve - Class - 1
Fail to perform hydrostatic pressure test. stand pipe. noted: bldg erected to the 14th flr. when i asked for hydrostatic test- nothing could be provided- then on bis system there is no record of successful hydr
Feb 4, 2017 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved construction documents &/or amendments. noted: bldg erected to 14 flr- the horizontal netting @ exp#1 & 3 does not conform to approved site safety plan causing a hazard to publ
Feb 4, 2017 · Penalty $250
Resolve - Class - 2
Failure to safeguard all public & property affected by construction operation. noted: exp#1 of site has grade level mechanical operations in progress where public sidewalk is closed. people are directed to publ
Feb 4, 2017 · Penalty $5,000
Resolve - Class - 1
Protection of roofs at time of inspecion forming work going at 3rd flrlevel. there is no protection provided on north and south side of property to adjoining bldgs. stop all work aboe 3rd floor.provide protecti
May 6, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: at framing deck to pow 3rd sty-no evidence of fall protection/fall arrest system for work to install guardrails around lea
May 5, 2016 · Penalty $10,000
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments as noted: at time of inspection at active job site observed1)doka 550 props at exp#2 stairwell extended past designed specs. prop
Apr 18, 2016 · Penalty $1,000
Resolve - Class - 1
Work does not conform to approved construction documents or approved amendments.as noted: at time of inspection on an active construction site observed, at ground level column line a-8,concrete column a-8 mis
Mar 24, 2016 · Penalty $1,000
Resolve - Class - 2
Bc3301.7 failure to provide pe approved design drawings for stay formas noted: at time of inspection on an active construction site observ ed general contractor erecting rebar and concete stay form along exp2
Mar 24, 2016 · Penalty $400
Resolve - Class - 1
Sec. 3301.7 failure to provide p.e. approved design drawing. as noted:at time of inspection at active site observed cold joint at floor #1. concrete slab resting on reshores on top of cribbing no mat slab on
Feb 22, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 28-104.7 submittal of construction documents as noted: at time ofinspection observed reshores at cellar level in cribbing no mat slab, no approved plan on site. provide approved construction documents.
Feb 22, 2016
Resolve - Class - 2
Failure to provide approved/accepted plans @ the jobsite @ the time of insp.the respondent failed to provide accepted support of excavation plan @ the jobsite.plan did not provide detail for excavation @ exp.4
Apr 30, 2015
Resolve - Class - 2
Work does not conform to approved plans or approved amendments.underpinnings does not conform to approved plans.because of existing site condition(pressure of rock)some underpins are of different depth and thic
Apr 30, 2015
Resolve - Class - 2
Construction documents shall be maintained at job site until the work authorized by the permit is completed & signed off by the dept. noted at time of inspection no shed drawing can be found or produced.
Oct 2, 2014
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances. defects noted: approx 20 layers of brick work at 2nd flr of the front of the premises shifted forward(approx 1"-2")having created unsafe & unsuitable condition
Jan 18, 2014 · Penalty $250
Resolve - Non-hazardous
Work without a permit work noted installed new wood floor beams on 1st floor ;remedy obtain a permit
Oct 27, 1988
Resolve
Complaints
- Heat/hot water
Entire building
Nov 28, 2025 · Apt 1F
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt 1F
Close - Unsanitary condition
Pests
Nov 28, 2025 · Apt 1F
Close - Unsanitary condition
Pests
Nov 28, 2025 · Apt 1F
Close - Door/window
Window frame
Nov 28, 2025 · Apt 1F
Close - Unsanitary condition
Pests
Jan 27, 2023 · Apt 6G
Close - Plumbing
Water supply
Jan 22, 2023 · Apt 701
Close - Heating
Heat related
Mar 22, 2013 · Apt 1F
Close - Plumbing
Water supply
Sep 26, 2006 · Apt 2FL
Close - Plumbing
Toilet
Sep 26, 2006 · Apt 2FL
Close
Show 5 more ↓
- Plumbing
Shower-stall
Sep 26, 2006 · Apt 2FL
Close - Heating
Heat related
Nov 6, 2004 · Apt 2FL
Close - Heating
Heat related
Mar 23, 2004 · Apt 2FL
Close - Nonconst
Vermin
Jan 28, 2004 · Apt 2FL
Close - Heating
Heat related
Jan 24, 2004 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H6)
- Year built
- 2015
- Floors
- 16
- Residential units
- 18
- Building area
- 51,584 ft²
- Lot area
- 4,721 ft²
- Zoning
- C6-3X
- Community board
- 104
- Council district
- 3
- Block / lot
- 773 / 44
- Assessed value
- $7,668,900
- Landmark / historic district
- No
HPD registration #144586, last renewed Jun 18, 2025.
Questions about 232 7 Avenue
Who owns 232 7 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Karmelena Realty Co., LLC.
Does 232 7 Avenue have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 232 7 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 232 7 Avenue built?
City records list 2015 as the year it was built.
How many apartments are in 232 7 Avenue?
It has 18 residential units and 49 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.