210 West 18 Street
Manhattan, NY 10011BBL 1-00767-7505Map
Owner of record: Unavailable Owner
210 West 18 Street is a condominium built in 1929 in Manhattan, 10011. It has 47 residential units across 23 floors. The owner of record is Unavailable Owner. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 35
- ECB violations
- 28
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 35
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Construction other optional
On 11/18/2020 1 glass panel (25 story terrace)and 2 glass panels at terrace of apt 15c at exp 4, west elevation due to pipe scaffolding that was unsecured and hanging. remedy: a 100% hands on inspection of all glass panels throughout is req'd by a nys lic prof-immed provide engineer's report, repair dwgs/proposals submit all info to facades
Nov 16, 2020
Dob violation - dismissed - Construction other optional
1" glass panel damaged during weather conditions
Nov 16, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2020
Dob violation - resolved
Show 25 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 23, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 2017
Dob violation - resolved - Construction other optional
Failure to maintain building
Oct 20, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 20, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2013
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2012
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 8, 2012
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Jul 20, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2011
Dob violation - resolved
ECB violations · 28
- Class - 1
Unlawful acts: failure to comply with the commissioner's order. note: as per violation #111620llfa01pr, onwer were to immediately retain a nys professional pe or ra to perform a 100% hands on inspection of all
May 7, 2024 · Penalty $2,500
Resolve - Class - 2
Failure to notify d.o.b. for complete removal of sidewalk shed.note:at time of inspection observed not sidewalk shed on jobsite.no notification to dept which requires 48 hours notice prior to removal.remedy:com
Jul 6, 2021
Resolve - Class - 2
Failure to maintain building exterior walls/facades and appurtenances.exposure 3,south elevation:eroded mortar joints. remedy:maintain bldg exterior walls/facades and appurtenances. repair/make facade safe. pro
Nov 16, 2020 · Penalty $625
Resolve - Class - 2
Removal of shed or protective measure w/o dept approval. removal of shed w/o dept approval and before the amended report was accepted. rmdy: comply w/code as per 1rcny103-04.
Jan 21, 2015 · Penalty $400
Resolve - Class - 1
Work does not conform to approved constr documents or approved amendments. noted: supported scaffold above sws at exposure #1 over loaded w/6 full planking decks levels. only 4 working decks allowed by approved
Mar 6, 2013 · Penalty $1,000
Resolve - Class - 1
*cease use* 01l10:device #1p18547 under ea1888/11 - defective stop switch.call 212-566-5542 for reinspection & to lift *cease use*.
Jan 2, 2013 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. observed sales office erected at 1st fl w/sales staff on duty w/o 1st obtaining a permit for built out as per section (28-111) discontinue use of sales office obtain a permit.
Oct 23, 2012 · Penalty $8,000
Resolve - Class - 2
Sec. 3309.10 no roof protection provided for mechanical exhaust systems. note at time of inspection workers installing bricky scaffold in location where machanical vents are located at court yard for restaurant
Oct 23, 2012 · Penalty $4,000
Resolve - Class - 1
Sec.. 1704.22.1.1 failure to file op98 for hydrostatic test. at time of inspection bldg under alt #120372578 & standpipe #120824419 (modification of standpipe to 23rd fl) as per dob record no op98 obtain for
Oct 23, 2012 · Penalty $12,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation upon inspection & information obtained from the site safety manager of the job simon r leykin lic #2198 a worker while cutting flr
May 10, 2012 · Penalty $2,400
Resolve
Show 18 more ↓
- Class - 3
98bb05,99bb05,67x10,97o02.(98bb05)5 year.(99bb05)1 year.(67x10)communications.(97o02)clean entire device.
Jan 10, 2012 · Penalty $200
Resolve - Class - 3
98bb05,99bb05,67x10,97o02.(98bb05)5 year.(99bb05)1 year.(67x10)communications.(97o02)clean entire device.
Jan 10, 2012 · Penalty $200
Resolve - Class - 3
98bb05,99bb05,67x10,97o02.(98bb05)5 year.(99bb05)1 year test.(67x10)communications.(97o02)clean entire device.
Jan 10, 2012 · Penalty $200
Resolve - Class - 3
98bb05,99bb05,67x10,97o02.(98bb05)5 year.(99bb05)1 year.(67x10)communications.(97o02)clean entire device.
Jan 10, 2012 · Penalty $200
Resolve - Class - 2
12l10,40o02,37o02,98bb05,99bb05,02x10. 02x- 2 way communication.
Jan 6, 2012 · Penalty $500
Resolve - Class - 2
21j01,02x10,40o02,98bb05,99bb05. 21j- adjust clutch - clipping rollers. 02x- 2 way communication.
Jan 6, 2012 · Penalty $500
Resolve - Class - 2
03i10,02x10,40o02,98bb05,99bb05. 02x- 2 way communication.
Jan 6, 2012 · Penalty $500
Resolve - Class - 2
21j01,02x10,40o02,98bb05,99bb05. 21j- adjust clutch - clipping rollers02x- 2 way communication.
Jan 6, 2012 · Penalty $500
Resolve - Class - 1
Bc3310.6 failure to have designated site safety manager as indicated on pw2 present on site at minimum of once every two weeks examination of site safety log for 10/6/11 to present 11/22/11 indicates that ssm#1
Nov 22, 2011
Resolve - Class - 2
Sec. 3301.7. design drawing required. note: at the time of my inspection construction site chain hoist is attached to i beam w/o any protection or design drawing show its connection to the beam chain is looped
Sep 20, 2011 · Penalty $400
Resolve - Class - 2
3310.6 failure to have designate site safety on pw2 assigned to this set as of july 1 2011 mike persutt has not been the site safety manager on this site rem: provide designated sub safety to this site obtain p
Aug 17, 2011 · Penalty $800
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate - at time ofinspection - observed ongoing demo on 17th flr. 2 workers on a 2 section - pipe scaffold conducting demo operations w/o user scaffold.
May 26, 2011 · Penalty $400
Resolve - Class - 2
Warning signs & lights to protect public from hazards - danger signs -vehicular barricades - at time of observed barricades on street (fronting) job site on 17th street side w/no lights to protect public from
May 26, 2011
Resolve - Class - 2
Warning sign and light to protect public from hazards - danger sign - vehicular traffic barricade - at time of inspection, observed barricade on street, fronting - 210 west 18 street job site - no lights on
May 26, 2011
Resolve - Class - 2
Work w/o a permit. noted: concrete work completed and/or in progress observed under alt 2 permit #120325139 and alt 2 permit #120333237 contrary to stipulations of issued permits, which state - concrete work
Mar 1, 2011
Resolve - Class - 2
Failure to file special inspection.statement of responsibility(tr-1)prior to permit issuance & prior to start of work under special inspection requirement for alt 2 permit#120325139 concrete gas-in-place 7 spra
Mar 1, 2011
Resolve - Class - 2
Work w/o a permit. nonted: mechanical removals for purposes of full gut demo/renovation at bulkhead flrs 20-23 are essentially complete w/o first obtaining permits. noted: alt 1 appl 102372578. remedy: obtain
Mar 1, 2011
Resolve - Non-hazardous
Installation of mechanical equiptment without first obtaining a work permit. noted: (1) 700 tons a/c unit at basement (2) 16 tons a/c unit at 6th floor (3) tons a/c unit at 16th floor ceiling mounted opperation
Aug 28, 1996 · Penalty $700
Resolve
Complaints
- Appliance
Refrigerator
Jul 21, 2021 · Apt 7G
Close - Appliance
Refrigerator
Jul 21, 2021 · Apt 7G
Close - Appliance
Refrigerator
Jul 21, 2021 · Apt 7G
Close - Unsanitary condition
Garbage/recycling storage
May 15, 2015 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1929
- Floors
- 23
- Residential units
- 47
- Building area
- 274,965 ft²
- Lot area
- 23,736 ft²
- Zoning
- C6-2A
- Community board
- 104
- Council district
- 3
- Block / lot
- 767 / 7505
- Assessed value
- $36,780,301
- Landmark / historic district
- No
HPD registration #144247, last renewed Jul 11, 2025.
Questions about 210 West 18 Street
Who owns 210 West 18 Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 210 West 18 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 210 West 18 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 210 West 18 Street built?
City records list 1929 as the year it was built.
How many apartments are in 210 West 18 Street?
It has 47 residential units and 55 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.