156 8 Avenue
Manhattan, NY 10011BBL 1-00767-0073Map
Owner of record: Chelsea Properties,inc.
156 8 Avenue is a mixed residential and retail building built in 1915 in Manhattan, 10011. It has 4 residential units across 4 floors. The owner of record is Chelsea Properties,inc.. HPD has recorded 2 housing violations here, most recently on April 29, 2026.
- HPD violations
- 2
- DOB violations
- 5
- ECB violations
- 9
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed
DOB building violations · 5
- Construction other optional
Failure to comply with commissioner's order # 334057 issued on 8/9/18 to obtain permit by 9/1/18 to repair the building as of 4/24/19 no jobs have been filed with the department.comply with commissioner's order # 334057 immediately
Apr 24, 2019
Dob violation - active - Construction other optional
Ftm adequate illumination beneath sidewalk shed as required by code rememdy: comply with code
Nov 1, 2018
Dob violation - active - Construction other optional
Ftm 4 stry+cell attach masonry walls&wood framed flrs.bldg ext wall at front in disrepair.outside brick wythe of parapet detach&fell onto sidewalk.decorative window header deteriorated.cracked brick noted at various locs.remedy:own engage lic pe&cont'r eval bldg&rpr und perm file perm no later 8/23/18.start work by 9/1/18
Aug 9, 2018
Dob violation - active - Construction other optional
Emerg wrk.4stry+cell masonry walls&wood flrs bldg.front wall parapet ext brick fell onto sidewalk loose brick&coping found at corner w/wall &risk of fall.second means of egress compromised due to overhead hazard.remedy:own immed prov fireguard until overhead hazard is remove .remove loose brick&material.start wrk immed.file perm by 8/10/18
Aug 7, 2018
Dob violation - active - Construction other optional
C-construction other optional
Nov 14, 1988
Dob violation - active
ECB violations · 9
- Class - 2
At time of inspection i observed sidewalk shed installed on exposure #1 with inoperable light bulbs at underside the shed to bring illumination failure to provide lighting creates unsafe and mugging condition
Oct 31, 2024 · Penalty $2,400
Resolve - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 161621 in accordance with rules of dept.1rcny103-01(d)(1) requires that annual inspection report for low-pressure boilers be sub
Jun 7, 2024
Resolve - Class - 2
At time of inspection observed missing caps from the bolts at sidewalk shed can create hazardous condition for pedestrian 3307.6.5.6 sharp edges..
Feb 12, 2024 · Penalty $2,400
Active - Class - 2
At time of inspection of 4 story mixed use building observed supported scaffold in place with permit m00074306 expired 3-15-19.
Aug 15, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection of a 4 story mixed use building with sidewalk shed in place with lighting not in operating condition.provide lighting dusk till dawn
Aug 15, 2023 · Penalty $625
Resolve - Class - 2
At times the inspection observed sidewalks shed erected at exposure # 1,with pipes scaffold erected on sidewalk with expire permit for pipe scaffold 03/15/2019-permit# m00074306-l1. ..
Jul 29, 2023
Resolve - Class - 2
At the time of inspection, observed installed sidewalk shed at exposure 1. the height of horizontal bracing in front of the main entrance was lower than 8 feet. g.c failed to erect sidewalk shed in code complia
Jan 6, 2023
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certiciate.failure to comply with the commissioners order contained in summons/violation #35325299h issued on 08/06/18 and to file a certificate of corr
Sep 20, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain building in code-compliant manner. as noted: observed at front of building exp #1 at 4th fl, a section of brick masonry facade approx 17' x 3' dislodged and fell onto the sidewalk. nypd, fdn
Aug 6, 2018 · Penalty $1,250
Resolve
Complaints
- Plumbing
Water supply
Oct 8, 2011 · Apt 3
Close - Plumbing
Water supply
Oct 8, 2011 · Apt 3
Close - Plumbing
Water supply
Oct 8, 2011 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S4)
- Year built
- 1915
- Floors
- 4
- Residential units
- 4
- Building area
- 3,640 ft²
- Lot area
- 1,750 ft²
- Zoning
- C1-6A
- Community board
- 104
- Council district
- 3
- Block / lot
- 767 / 73
- Assessed value
- $2,076,750
- Landmark / historic district
- No
HPD registration #102958, last renewed Sep 17, 2025.
Questions about 156 8 Avenue
Who owns 156 8 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Chelsea Properties,inc..
Does 156 8 Avenue have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 156 8 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 156 8 Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 156 8 Avenue?
It has 4 residential units and 5 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.